PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/17/26 EST. NO. 005 TIME 09:21 AM R.E. NAME: JAGGA DHAMI 10-0T69U4 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/17/26 EST. NO. 005 TIME 09:21 AM R.E. NAME: JAGGA DHAMI 10-0T69U4 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 07/17/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0T69U4 TIME 09:21 AM ESTIMATE NO. 005 BID OPENING 10/28/25 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/26 R.E. NAME: JAGGA DHAMI DATE OF THIS ESTIMATE 07/17/26 LOCATION PROGRESS ESTIMATE 10-VAR ----------------- CAL VALLEY CONSTRUCTION, INC. MERCED AND STANISLAUS COUNTIES AT VARIOUS 5125 N GATES AVE STE 102 LOCATIONS FRESNO CA 93722 FED. AID NO. ACST-000C(571)E HOT MIX ASPHALT PAVING AND INSTALL ELECTRI ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,800.0000 2,800.00 0.000 0 002 TIME-RELATED OVERHEAD (WDAY) WDAY 1,700.0000 187,000.00 21.000 35,700.00 69.000 117,300 003 DISPUTE RESOLUTION ADVISOR ON-SITE EA 2,000.0000 8,000.00 1.000 2,000.00 2.000 4,000 MEETING 004 HOURLY OFF-SITE HR 200.0000 2,000.00 0.000 0 DISPUTE-RESOLUTION-ADVISOR-RELATED TASKS 005 CONSTRUCTION AREA SIGNS LS 20,650.0000 20,650.00 0.000 0 006 TRAFFIC CONTROL SYSTEM LS 292,000.0000 292,000.00 0.000 0 007 TYPE III BARRICADE EA 125.0000 750.00 0.000 0 008 PORTABLE LIGHTING SYSTEMS EA 4,500.0000 13,500.00 0.000 0 009 TEMPORARY PEDESTRIAN ACCESS ROUTE LS 2,700.0000 2,700.00 0.000 0 010 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 11,000.0000 11,000.00 0.000 0 011 JOB SITE MANAGEMENT LS 1,200.0000 1,200.00 0.000 0 012 WATER POLLUTION CONTROL PROGRAM LS 1,200.0000 1,200.00 0.000 0 013 TEMPORARY DRAINAGE INLET PROTECTION EA 150.0000 450.00 0.000 0 014 STREET SWEEPING LS 4,500.0000 4,500.00 0.000 0 015 TEMPORARY CONCRETE WASHOUT LS 1,200.0000 1,200.00 0.000 0 016 TREATED WOOD WASTE LB 2.0000 3,520.00 0.000 0 017 CLEARING AND GRUBBING (LS) LS 135,000.0000 135,000.00 0.000 0 018 ROADWAY EXCAVATION CY 55.0000 442,200.00 0.000 0 019 DRY SEED (SQFT) SQFT 0.1100 12,540.00 0.000 0 020 FIBER ROLLS LF 4.5000 37,620.00 0.000 0 021 COMPOST (CY) CY 62.0000 44,020.00 0.000 0 022 CLASS 2 AGGREGATE BASE (CY) CY 65.0000 293,800.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 07/17/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0T69U4 TIME 09:21 AM ESTIMATE NO. 005 BID OPENING 10/28/25 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/26 R.E. NAME: JAGGA DHAMI DATE OF THIS ESTIMATE 07/17/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 HOT MIX ASPHALT (TYPE A) TON 135.0000 1,026,000.00 0.000 0 024 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 18.0000 8,100.00 0.000 0 025 PLACE HOT MIX ASPHALT (MISCELLANEOUS SQYD 150.0000 6,600.00 0.000 0 AREA) 026 TACK COAT TON 3,800.0000 38,000.00 0.000 0 027 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 3.5000 14,350.00 0.000 0 028 MINOR CONCRETE (MINOR STRUCTURE) CY 4,000.0000 36,800.00 0.000 0 (F) 029 CONCRETE BACKFILL (PIPE TRENCH) CY 670.0000 12,931.00 0.000 0 (F) 030 12" PLASTIC PIPE LF 500.0000 500.00 0.000 0 031 12" REINFORCED CONCRETE PIPE LF 200.0000 14,600.00 0.000 0 032 36" REINFORCED CONCRETE PIPE LF 260.0000 6,760.00 0.000 0 033 36" CORRUGATED STEEL PIPE (.064" THICK) LF 500.0000 1,000.00 0.000 0 034 12" CONCRETE FLARED END SECTION EA 1,650.0000 3,300.00 0.000 0 035 REMOVE CULVERT (LF) LF 100.0000 7,200.00 0.000 0 036 REMOVE INLET EA 850.0000 850.00 0.000 0 037 MISCELLANEOUS IRON AND STEEL LB 3.5000 1,575.00 0.000 0 (F) 038 DELINEATOR (CLASS 1) EA 65.0000 260.00 0.000 0 039 PAVEMENT MARKER (RETROREFLECTIVE) EA 35.0000 8,400.00 0.000 0 040 REMOVE ROADSIDE SIGN EA 150.0000 7,050.00 0.000 0 041 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 23.0000 4,370.00 0.000 0 (0.063"-UNFRAMED) 042 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 26.0000 754.00 0.000 0 (0.080"-UNFRAMED) 043 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 33.0000 1,122.00 0.000 0 (0.063"-FRAMED) 044 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 40.0000 2,400.00 0.000 0 (0.080"-FRAMED) 045 ROADSIDE SIGN - ONE POST EA 600.0000 21,000.00 0.000 0 046 ROADSIDE SIGN - TWO POST EA 1,200.0000 6,000.00 0.000 0 047 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 525.0000 5,250.00 0.000 0 METHOD) 048 THERMOPLASTIC PAVEMENT MARKING (ENHANCED SQFT 10.0000 11,800.00 0.000 0 WET NIGHT VISIBILITY) 049 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.6000 640.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3) PROGRAM CAS145 PAGE 3 DATE 07/17/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0T69U4 TIME 09:21 AM ESTIMATE NO. 005 BID OPENING 10/28/25 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/26 R.E. NAME: JAGGA DHAMI DATE OF THIS ESTIMATE 07/17/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 6" THERMOPLASTIC TRAFFIC STRIPE LF 2.0000 17,300.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 051 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 8.0000 280.00 0.000 0 052 LIGHTING SYSTEM LS 207,000.0000 207,000.00 0.072 14,904.00 0.072 14,904 053 TRAFFIC MONITORING STATION SYSTEM LS 369,000.0000 369,000.00 0.302 111,438.00 0.302 111,438 054 CAMERA SYSTEMS LS 24,000.0000 24,000.00 0.000 0 055 MODIFYING LIGHTING SYSTEMS LS 78,000.0000 78,000.00 0.207 16,146.00 0.207 16,146 056 MODIFYING FLASHING BEACON SYSTEMS LS 95,000.0000 95,000.00 0.228 21,660.00 0.228 21,660 057 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 058 HYDROMULCH SQFT 0.0800 9,120.00 0.000 0 PROGRAM CAS145 PAGE 4 DATE 07/17/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0T69U4 TIME 09:21 AM ESTIMATE NO. 005 BID OPENING 10/28/25 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/26 R.E. NAME: JAGGA DHAMI DATE OF THIS ESTIMATE 07/17/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 201,848.00 285,448.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 40,000.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 201,848.00 325,448.00 059 MOBILIZATION LS 355,000.0000 355,000.00 0.500 177,500.00 0.500 177,500 ORIGINAL CONTRACT AMOUNT 3,919,962.00 TOTAL WORK COMPLETED 379,348.00 502,948.00 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 379,348.00 502,948.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 01/14/26 110 04/13/26 00/00/00 09/16/26 69 0 0 0 13% 63% PROGRESS IS SATISFACTORY JAGGA DHAMI RESIDENT ENGINEER