PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/22/13 EST. NO.01 TIME 08:55 AM R.E. NAME: ARIEL MENDOZA 10-0W7104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/22/13 EST. NO.01 TIME 08:55 AM R.E. NAME: ARIEL MENDOZA 10-0W7104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/22/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0W7104 TIME 08:55 AM ESTIMATE NO. 01 BID OPENING 04/24/13 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/13 R.E. NAME: ARIEL MENDOZA DATE OF THIS ESTIMATE 08/22/13 LOCATION PROGRESS ESTIMATE 10-SJ-205-0.0/0.1 ----------------- AMERICAN CIVIL CONSTRUCTORS IN SAN JOAQUIN COUNTY NEAR TRACY AT WEST COAST INC AQUEDUCT SERVICE RD UC AND AT DELTA 3701 MALLARD DRIVE MENDOTA CANAL BRIDGE BENICIA CA 94510 FED. AID NO. N O N E REPLACE APPROACH SLABS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,500.0000 1,500.00 1.000 1,500.00 1.000 1,500 002 CONSTRUCTION AREA SIGNS LS 8,000.0000 8,000.00 0.500 4,000.00 0.500 4,000 003 TRAFFIC CONTROL SYSTEM LS 75,900.0000 75,900.00 0.024 1,821.60 0.024 1,821 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 8,000.0000 8,000.00 0.024 192.00 0.024 192 005 JOB SITE MANAGEMENT LS 500.0000 500.00 0.024 12.00 0.024 12 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 700.0000 700.00 0.750 525.00 0.750 525 007 TEMPORARY CONCRETE WASHOUT LS 1,200.0000 1,200.00 0.000 0 008 PUBLIC SAFETY PLAN LS 4,000.0000 4,000.00 0.500 2,000.00 0.500 2,000 009 RAPID SETTING CONCRETE (PATCH) CF 25.0000 1,025.00 0.000 0 010 REMOVE ASPHALT CONCRETE DIKE LF 18.0000 7,200.00 0.000 0 011 REMOVE ASPHALT CONCRETE SURFACING SQFT 0.7000 15,666.00 14,908.000 10,435.60 14,908.000 10,435 012 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 2.5000 5,800.00 0.000 0 013 REMOVE UNSOUND CONCRETE CF 70.0000 2,870.00 0.000 0 014 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.2500 2,045.00 0.000 0 015 TREAT BRIDGE DECK (EPOXY RESIN) SQFT 0.5000 4,090.00 0.000 0 (F) 016 FURNISH DECK TREATMENT MATERIAL GAL 50.0000 4,550.00 0.000 0 (EPOXY RESIN) 017 BRIDGE REMOVAL (PORTION) LS 55,000.0000 55,000.00 0.000 0 018 HOT MIX ASPHALT (TYPE A) TON 230.0000 59,800.00 0.000 0 019 RUMBLE STRIP STA 1,200.0000 2,400.00 0.000 0 020 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 8.0000 3,200.00 0.000 0 021 TACK COAT TON 1.0000 2.00 0.000 0 022 STRUCTURAL CONCRETE, BRIDGE CY 4,200.0000 29,400.00 0.000 0 (F) PROGRAM CAS145 PAGE 2 DATE 08/22/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0W7104 TIME 08:55 AM ESTIMATE NO. 01 BID OPENING 04/24/13 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/13 R.E. NAME: ARIEL MENDOZA DATE OF THIS ESTIMATE 08/22/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 AGGREGATE BASE (APPROACH SLAB) CY 310.0000 15,810.00 0.000 0 024 STRUCTURAL CONCRETE, APPROACH SLAB CY 910.0000 463,190.00 0.000 0 (TYPE R) 025 PAVING NOTCH EXTENSION CF 160.0000 48,960.00 0.000 0 026 CORE TREATED BRIDGE DECK EA 300.0000 1,800.00 0.000 0 027 JOINT SEAL (MR 1/2") LF 30.0000 6,720.00 0.000 0 028 JOINT SEAL (MR 1") LF 35.0000 8,190.00 0.000 0 029 BAR REINFORCING STEEL (BRIDGE) LB 2.5000 4,450.00 0.000 0 (F) 030 4" THERMOPLASTIC TRAFFIC STRIPE LF 1.5000 3,315.00 0.000 0 031 THERMOPLASTIC PAVEMENT MARKING SQFT 15.0000 180.00 0.000 0 032 4" THERMOPLASTIC TRAFFIC STRIPE LF 1.5000 3,315.00 0.000 0 (BROKEN 36-12) 033 PAVEMENT MARKER (RETROREFLECTIVE) EA 8.0000 624.00 0.000 0 034 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 500.0000 500.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 3 DATE 08/22/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0W7104 TIME 08:55 AM ESTIMATE NO. 01 BID OPENING 04/24/13 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/13 R.E. NAME: ARIEL MENDOZA DATE OF THIS ESTIMATE 08/22/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 20,486.20 20,486.20 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 20,486.20 20,486.20 035 MOBILIZATION LS 95,000.0000 95,000.00 0.000 0 ORIGINAL CONTRACT AMOUNT 944,902.00 TOTAL WORK COMPLETED 20,486.20 20,486.20 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 20,486.20 20,486.20 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 035 MOBILIZATION 94,490.20 95,000.00 509.80 DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/13/13 85 08/05/13 06/28/13 12/18/13 2 35 0 0 2% 2% PROGRESS IS SATISFACTORY *** SUSPENDED ON 06/28/13. ARIEL MENDOZA RESIDENT ENGINEER PROGRAM CAS145 DATE 08/22/13