PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 12/18/15 EST. NO. 002 TIME 10:27 AM R.E. NAME: SUKHI DEOL 10-0X6104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 12/18/15 EST. NO. 002 TIME 10:27 AM R.E. NAME: SUKHI DEOL 10-0X6104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 12/18/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0X6104 TIME 10:27 AM ESTIMATE NO. 002 BID OPENING 06/16/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/15 R.E. NAME: SUKHI DEOL DATE OF THIS ESTIMATE 12/18/15 LOCATION PROGRESS ESTIMATE 10-MER-5-21.4/ .0 ----------------- GOLDEN STATE BRIDGE, INC. IN MERCED COUNTY AT SANTA NELLA AT 3701 MALLARD DRIVE SAN LUIS WASTEWAY BRIDGE BENICIA CA 945101195 FED. AID NO. IM-005 -5(145)406,E- ( ) REHABILITATE BRIDGE DECK ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 4,000.0000 4,000.00 0.500 2,000 002 CONSTRUCTION AREA SIGNS LS 19,000.0000 19,000.00 0.500 9,500 003 TRAFFIC CONTROL SYSTEM LS 75,000.0000 75,000.00 0.110 8,250.00 0.310 23,250 004 TYPE III BARRICADE EA 75.0000 450.00 0.000 0 005 TEMPORARY TRAFFIC STRIPE (TAPE) LF 1.2500 9,900.00 0.000 0 006 CHANNELIZER (SURFACE MOUNTED) EA 45.0000 11,250.00 6.000 270.00 18.000 810 007 TEMPORARY PAVEMENT MARKER EA 8.0000 960.00 0.000 0 008 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 23,500.0000 23,500.00 0.110 2,585.00 0.310 7,285 009 TEMPORARY RAILING (TYPE K) LF 30.0000 84,600.00 940.000 28,200.00 940.000 28,200 010 TEMPORARY CRASH CUSHION MODULE EA 145.0000 12,180.00 28.000 4,060 011 JOB SITE MANAGEMENT LS 10,000.0000 10,000.00 0.110 1,100.00 0.310 3,100 012 PREPARE WATER POLLUTION CONTROL PROGRAM LS 2,000.0000 2,000.00 1.000 2,000 013 TEMPORARY CONCRETE WASHOUT LS 5,000.0000 5,000.00 0.250 1,250.00 0.250 1,250 014 ASBESTOS COMPLIANCE PLAN LS 3,000.0000 3,000.00 1.000 3,000 015 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 2.7000 7,128.00 0.000 0 STRIPE (HAZARDOUS WASTE) 016 TREATED WOOD WASTE LB 0.2000 1,518.00 0.000 0 017 RAPID SETTING CONCRETE (PATCH) CF 200.0000 7,000.00 55.000 11,000 018 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.6000 3,168.00 0.000 0 019 REMOVE PAVEMENT MARKER EA 5.0000 600.00 0.000 0 020 REMOVE POLYESTER CONCRETE OVERLAY SQFT 6.0000 82,830.00 13,805.000 82,830 021 SALVAGE METAL BRIDGE RAILING LF 25.0000 20,200.00 0.000 0 022 RECONSTRUCT DOUBLE THRIE BEAM BARRIER LF 81.0000 13,770.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 12/18/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0X6104 TIME 10:27 AM ESTIMATE NO. 002 BID OPENING 06/16/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/15 R.E. NAME: SUKHI DEOL DATE OF THIS ESTIMATE 12/18/15 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 RECONSTRUCT GUARDRAIL LF 81.0000 10,530.00 0.000 0 024 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 34.0000 45,220.00 0.000 0 025 REMOVE UNSOUND CONCRETE CF 125.0000 4,375.00 55.000 6,875 026 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 1.0000 14,850.00 0.000 0 027 BRIDGE REMOVAL (PORTION) LS 55,000.0000 55,000.00 0.500 27,500.00 0.500 27,500 028 ROADWAY EXCAVATION CY 80.0000 44,800.00 476.000 38,080 029 SHOULDER BACKING TON 75.0000 8,250.00 0.000 0 030 STRUCTURE EXCAVATION (BRIDGE) CY 175.0000 1,400.00 8.810 1,541.75 8.810 1,541 (F) 031 STRUCTURE BACKFILL (BRIDGE) CY 175.0000 1,575.00 0.000 0 (F) 032 IMPORTED BORROW (CY) CY 55.0000 440.00 0.000 0 033 PREPAVING INERTIAL PROFILER LS 10,000.0000 10,000.00 0.000 0 034 HOT MIX ASPHALT (TYPE A) TON 140.0000 169,400.00 931.970 130,475 035 SHOULDER RUMBLE STRIP STA 300.0000 9,600.00 0.000 0 (HMA,GROUND-IN INDENTATIONS) 036 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 12.0000 1,320.00 0.000 0 037 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 12.0000 8,640.00 0.000 0 038 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 12.0000 600.00 0.000 0 039 TACK COAT TON 100.0000 110.00 0.000 0 040 INDIVIDUAL SLAB REPLACEMENT (RSC) CY 1,800.0000 70,200.00 0.000 0 041 GRIND EXISTING CONCRETE SQYD 70.0000 8,400.00 0.000 0 PAVEMENT 042 STRUCTURAL CONCRETE, BRIDGE CY 1,650.0000 321,750.00 18.230 30,079.50 18.230 30,079 (F) 043 AGGREGATE BASE (APPROACH SLAB) CY 125.0000 2,500.00 0.000 0 044 STRUCTURAL CONCRETE, APPROACH SLAB CY 1,200.0000 234,000.00 0.000 0 (TYPE R) 045 PAVING NOTCH EXTENSION CF 221.0000 35,802.00 0.000 0 046 DRILL AND BOND DOWEL LF 45.0000 55,710.00 224.500 10,102.50 224.500 10,102 047 JOINT SEAL (MR 1") LF 75.0000 14,400.00 0.000 0 048 PAINT BRIDGE IDENTIFICATION EA 200.0000 400.00 0.000 0 049 BAR REINFORCING STEEL (BRIDGE) LB 1.1000 41,142.20 3,497.000 3,846.70 3,497.000 3,846 (F) PROGRAM CAS145 PAGE 3 DATE 12/18/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0X6104 TIME 10:27 AM ESTIMATE NO. 002 BID OPENING 06/16/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/15 R.E. NAME: SUKHI DEOL DATE OF THIS ESTIMATE 12/18/15 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 CONCRETE BARRIER (TYPE 736 MODIFIED) LF 125.0000 101,000.00 404.000 50,500.00 404.000 50,500 (F) 051 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 2,640.00 0.000 0 052 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 1,320.00 0.000 0 (BROKEN 36-12) 053 PAVEMENT MARKER (RETROREFLECTIVE) EA 8.0000 960.00 0.000 0 054 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,500.0000 1,500.00 0.110 165.00 0.310 465 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 4 DATE 12/18/15 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-0X6104 TIME 10:27 AM ESTIMATE NO. 002 BID OPENING 06/16/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/15 R.E. NAME: SUKHI DEOL DATE OF THIS ESTIMATE 12/18/15 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 165,390.45 477,751.25 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 165,390.45 477,751.25 055 MOBILIZATION LS 186,000.0000 186,000.00 0.200 37,200.00 0.950 176,700 ORIGINAL CONTRACT AMOUNT 1,860,888.20 TOTAL WORK COMPLETED 202,590.45 654,451.25 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 202,590.45 654,451.25 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/31/15 175 00/00/00 08/17/15 05/05/16 82 3 0 0 34% 47% PROGRESS IS SATISFACTORY SUKHI DEOL RESIDENT ENGINEER PROGRAM CAS145 DATE 12/18/15