PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/21/07 EST. NO.01 TIME 01:46 PM R.E. NAME: JAKHAR, HASSAN 10-1A9304 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/21/07 EST. NO.01 TIME 01:46 PM R.E. NAME: JAKHAR, HASSAN 10-1A9304 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 03/21/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1A9304 TIME 01:46 PM ESTIMATE NO. 01 BID OPENING 12/05/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/07 R.E. NAME: JAKHAR, HASSAN DATE OF THIS ESTIMATE 03/21/07 LOCATION PROGRESS ESTIMATE 10-MPA-49-12.0/12.4 ----------------- TEICHERT CONSTRUCTION IN MARIPOSA COUNTY AT BOOTJACK FROM P.O. BOX 3367 0.4 KM WEST OF DARRAH ROAD TO TURLOCK, CA 95381 0.3 KM EAST OF DARRAH ROAD FED. AID NO. ACST-P049(139)E ,PH-P049(139)E CONSTRUCT LEFT AND RIGHT TURN LANES ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 TEMPORARY FENCE (TYPE ESA) M 17.6000 9,328.00 0.000 0.00 02 PREPARE STORM WATER POLLUTION LS 5,000.0000 5,000.00 1.000 5,000.00 1.000 5,000.00 PREVENTION PLAN 03 WATER POLLUTION CONTROL LS 15,000.0000 15,000.00 0.000 0.00 04 TEMPORARY CONCRETE WASHOUT FACILITY EA 3,200.0000 3,200.00 0.000 0.00 05 STREET SWEEPING LS 20,000.0000 20,000.00 0.000 0.00 06 CONSTRUCTION AREA SIGNS LS 10,000.0000 10,000.00 0.000 0.00 S) 07 TRAFFIC CONTROL SYSTEM LS 100,000.0000 100,000.00 0.100 10,000.00 0.100 10,000.00 S) 08 PORTABLE CHANGEABLE MESSAGE SIGN LS 20,000.0000 20,000.00 0.000 0.00 S) 09 ABANDON CULVERT EA 2,100.0000 2,100.00 0.000 0.00 10 REMOVE FLARED END SECTION EA 385.0000 385.00 0.000 0.00 11 REMOVE FLUME DOWNDRAIN EA 400.0000 800.00 0.000 0.00 12 REMOVE ROADSIDE SIGN EA 100.0000 700.00 0.000 0.00 13 REMOVE ASPHALT CONCRETE DIKE M 4.5000 2,970.00 0.000 0.00 14 REMOVE INLET EA 2,200.0000 2,200.00 0.000 0.00 15 REMOVE HEADWALL EA 15,000.0000 15,000.00 0.000 0.00 16 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 25.0000 7,000.00 0.000 0.00 S) 17 CLEARING AND GRUBBING LS 29,000.0000 29,000.00 0.900 26,100.00 0.900 26,100.00 18 ROADWAY EXCAVATION M3 46.6500 310,689.00 0.000 0.00 19 STRUCTURE EXCAVATION (CULVERT) M3 125.0000 18,125.00 0.000 0.00 F) 20 STRUCTURE BACKFILL (CULVERT) M3 25.0000 4,400.00 0.000 0.00 F) 21 DITCH EXCAVATION M3 50.0000 3,000.00 0.000 0.00 22 IMPORTED BORROW M3 40.0000 214,000.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 03/21/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1A9304 TIME 01:46 PM ESTIMATE NO. 01 BID OPENING 12/05/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/07 R.E. NAME: JAKHAR, HASSAN DATE OF THIS ESTIMATE 03/21/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 IMPORTED MATERIAL (SHOULDER BACKING) TONN 100.0000 4,400.00 0.000 0.00 24 HIGHWAY PLANTING LS 10,000.0000 10,000.00 0.000 0.00 S) 25 STRAW (EROSION CONTROL) TONN 1,100.0000 3,300.00 0.000 0.00 S) 26 FIBER (EROSION CONTROL) KG 2.7500 1,210.00 0.000 0.00 S) 27 COMPOST (EROSION CONTROL) KG 0.8500 8,840.00 0.000 0.00 S) 28 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 500.0000 1,000.00 0.000 0.00 S) 29 PURE LIVE SEED (EROSION CONTROL) KG 127.2500 5,471.75 0.000 0.00 S) 30 COMMERCIAL FERTILIZER (EROSION CONTROL) KG 2.7000 378.00 0.000 0.00 S) 31 STABILIZING EMULSION (EROSION CONTROL) KG 3.2000 96.00 0.000 0.00 S) 32 PLANT ESTABLISHMENT WORK LS 5,000.0000 5,000.00 0.000 0.00 S) 33 IRRIGATION SYSTEM LS 20,000.0000 20,000.00 0.000 0.00 S) 34 CLASS 2 AGGREGATE BASE M3 100.0000 73,000.00 0.000 0.00 35 ASPHALT CONCRETE (TYPE B) TONN 75.0000 209,250.00 0.000 0.00 36 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 65.0000 6,500.00 0.000 0.00 AREA) 37 PLACE ASPHALT CONCRETE DIKE (TYPE A) M 11.8500 4,621.50 0.000 0.00 38 PLACE ASPHALT CONCRETE DIKE (TYPE E) M 11.7500 7,637.50 0.000 0.00 39 ASPHALTIC EMULSION (PAINT BINDER) TONN 1.0000 14.00 0.000 0.00 40 CLASS 1 CONCRETE (BOX CULVERT) M3 900.0000 126,000.00 0.000 0.00 F) 41 MINOR CONCRETE (MINOR STRUCTURE) M3 2,200.0000 8,140.00 0.000 0.00 F) 42 BAR REINFORCING STEEL (BOX CULVERT) KG 2.5000 39,187.50 0.000 0.00 SF) 43 ROADSIDE SIGN - ONE POST EA 250.0000 1,500.00 0.000 0.00 44 ROADSIDE SIGN - TWO POST EA 375.0000 750.00 0.000 0.00 45 450 MM REINFORCED CONCRETE PIPE M 900.0000 16,200.00 0.000 0.00 46 600 MM REINFORCED CONCRETE PIPE M 1,000.0000 20,000.00 0.000 0.00 47 FLUME DOWNDRAIN M 300.0000 4,800.00 0.000 0.00 48 TAPERED INLET EA 275.0000 550.00 0.000 0.00 49 FLUME ANCHOR ASSEMBLY EA 250.0000 2,500.00 0.000 0.00 PROGRAM CAS145 PAGE 3 DATE 03/21/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1A9304 TIME 01:46 PM ESTIMATE NO. 01 BID OPENING 12/05/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/07 R.E. NAME: JAKHAR, HASSAN DATE OF THIS ESTIMATE 03/21/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 600 MM CONCRETE FLARED END SECTION EA 500.0000 500.00 0.000 0.00 51 ROCK SLOPE PROTECTION (LIGHT, METHOD B) M3 285.0000 9,405.00 0.000 0.00 52 ROCK SLOPE PROTECTION FABRIC M2 6.0000 660.00 0.000 0.00 53 MISCELLANEOUS IRON AND STEEL KG 6.5000 2,808.00 0.000 0.00 SF) 54 DELINEATOR (CLASS 1) EA 45.0000 450.00 0.000 0.00 55 PAINT TRAFFIC STRIPE (2-COAT) M 2.4000 7,008.00 0.000 0.00 S) 56 PAINT PAVEMENT MARKING (2-COAT) M2 75.0000 2,250.00 0.000 0.00 S) 57 PAVEMENT MARKER EA 25.0000 6,000.00 0.000 0.00 S) (RETROREFLECTIVE-RECESSED) PROGRAM CAS145 PAGE 4 DATE 03/21/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1A9304 TIME 01:46 PM ESTIMATE NO. 01 BID OPENING 12/05/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/07 R.E. NAME: JAKHAR, HASSAN DATE OF THIS ESTIMATE 03/21/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 41,100.00 41,100.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 41,100.00 41,100.00 58 MOBILIZATION LS 155,675.7500 155,675.75 0.000 0.00 ORIGINAL CONTRACT AMOUNT 1,558,000.00 TOTAL WORK COMPLETED 41,100.00 41,100.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 41,100.00 41,100.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 01/11/07 375 03/07/07 06/01/07 07/25/07 0 32 0 4 3% 3% PROGRESS IS SATISFACTORY *** SUSPENDED ON 03/13/07. JAKHAR, HASSAN RESIDENT ENGINEER PROGRAM CAS145 DATE 03/21/07