PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/20/16 EST. NO. 003 TIME 10:24 AM R.E. NAME: RANBIR BHULLAR 10-1C2104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/20/16 EST. NO. 003 TIME 10:24 AM R.E. NAME: RANBIR BHULLAR 10-1C2104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 06/20/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1C2104 TIME 10:24 AM ESTIMATE NO. 003 BID OPENING 10/21/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/16 R.E. NAME: RANBIR BHULLAR DATE OF THIS ESTIMATE 06/20/16 LOCATION PROGRESS ESTIMATE 10-SJ-5 ----------------- 10-SJ-205 ST. FRANCIS ELECTRIC IN ALAMEDA AND SAN JOAQUIN COUNTIES 10-ALA-580 975 CARDEN ST AT VARIOUS LOCATIONS SAN LEANDRO CA 94577 FED. AID NO. NHP-000C(419)E INSTALL RAMP METERS, CMS, CCTV, ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,200.0000 1,200.00 1.000 1,200 002 CONSTRUCTION AREA SIGNS LS 10,875.0000 10,875.00 0.850 9,243 003 TRAFFIC CONTROL SYSTEM LS 75,000.0000 75,000.00 0.200 15,000.00 0.450 33,750 004 TEMPORARY TRAFFIC STRIPE (TAPE) LF 2.0000 10,880.00 2,400.000 4,800 005 CHANNELIZER (SURFACE MOUNTED) EA 33.0000 1,881.00 4.000 132 006 TEMPORARY PAVEMENT MARKER EA 9.1300 1,186.90 0.000 0 007 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 27,000.0000 27,000.00 0.150 4,050.00 0.450 12,150 008 TEMPORARY RAILING (TYPE K) LF 23.5000 39,950.00 1,160.000 27,260 009 TEMPORARY CRASH CUSHION MODULE EA 175.0000 3,850.00 11.000 1,925.00 22.000 3,850 010 JOB SITE MANAGEMENT LS 175.0000 175.00 1.000 175 011 PREPARE STORM WATER POLLUTION PREVENTION LS 2,600.0000 2,600.00 1.000 2,600 PLAN 012 STORM WATER ANNUAL REPORT EA 2,000.0000 2,000.00 0.000 0 013 TEMPORARY CONCRETE WASHOUT LS 500.0000 500.00 0.500 250.00 0.500 250 014 TEMPORARY FENCE (TYPE ESA) LF 4.6700 11,955.20 300.000 1,401 015 TREATED WOOD WASTE LB 1.0000 850.00 800.000 800.00 800.000 800 016 REMOVE GUARDRAIL LF 8.0000 1,360.00 162.000 1,296.00 162.000 1,296 017 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 1.5000 2,505.00 1,226.000 1,839 018 REMOVE ASPHALT CONCRETE DIKE LF 18.0000 3,060.00 162.000 2,916.00 162.000 2,916 019 REMOVE PIPE (LF) LF 156.0000 936.00 6.000 936 020 REMOVE INLET EA 9.5000 9.50 1.000 9 021 SAND BACKFILL CY 25.0000 1,425.00 57.000 1,425 022 CLEARING AND GRUBBING (LS) LS 83,000.0000 83,000.00 0.750 62,250 PROGRAM CAS145 PAGE 2 DATE 06/20/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1C2104 TIME 10:24 AM ESTIMATE NO. 003 BID OPENING 10/21/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/16 R.E. NAME: RANBIR BHULLAR DATE OF THIS ESTIMATE 06/20/16 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 ROADWAY EXCAVATION CY 98.0000 209,720.00 240.000 23,520.00 1,786.300 175,057 024 HYDROMULCH SQFT 0.0200 908.00 0.000 0 025 HYDROSEED SQFT 0.0500 2,270.00 0.000 0 026 COMPOST SQFT 0.3700 16,798.00 0.000 0 027 CLASS 2 AGGREGATE BASE (CY) CY 63.0000 114,030.00 1,200.000 75,600.00 1,200.000 75,600 028 HOT MIX ASPHALT (TYPE A) TON 103.0000 185,400.00 0.000 0 029 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 030 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 32.0000 5,440.00 0.000 0 031 TACK COAT TON 1,500.0000 7,500.00 0.000 0 032 MINOR CONCRETE (MINOR STRUCTURE) CY 600.0000 3,000.00 5.000 3,000.00 5.000 3,000 (F) 033 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 14.5000 2,320.00 0.000 0 (0.063"-UNFRAMED) 034 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 15.7500 110.25 0.000 0 (0.080"-UNFRAMED) 035 ROADSIDE SIGN - ONE POST EA 415.0000 1,245.00 0.000 0 036 18" REINFORCED CONCRETE PIPE LF 100.0000 19,000.00 180.000 18,000 037 48" PRECAST CONCRETE PIPE MANHOLE LF 750.0000 3,750.00 5.000 3,750 038 MINOR CONCRETE (TEXTURED PAVING) CY 600.0000 18,000.00 0.000 0 039 MISCELLANEOUS IRON AND STEEL LB 1.9000 1,691.00 235.000 446.50 235.000 446 (F) 040 MANHOLE FRAME AND COVER EA 2,000.0000 2,000.00 1.000 2,000 041 DELINEATOR (CLASS 1) EA 47.0000 376.00 0.000 0 042 MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 43.0000 12,040.00 0.000 0 043 END ANCHOR ASSEMBLY (TYPE SFT) EA 875.0000 1,750.00 0.000 0 044 ALTERNATIVE FLARED TERMINAL SYSTEM EA 3,000.0000 6,000.00 0.000 0 045 4" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 2,280.00 0.000 0 046 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 1,210.00 0.000 0 047 THERMOPLASTIC PAVEMENT MARKING SQFT 5.0000 1,550.00 0.000 0 048 4" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 100.00 0.000 0 (BROKEN 6-1) 049 4" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 290.00 0.000 0 (BROKEN 17-7) PROGRAM CAS145 PAGE 3 DATE 06/20/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1C2104 TIME 10:24 AM ESTIMATE NO. 003 BID OPENING 10/21/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/16 R.E. NAME: RANBIR BHULLAR DATE OF THIS ESTIMATE 06/20/16 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 PAVEMENT MARKER (RETROREFLECTIVE) EA 5.0000 300.00 0.000 0 051 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,550.0000 1,550.00 1.000 1,550 SYSTEM ELEMENTS DURING CONSTRUCTION 052 CLOSED CIRCUIT TELEVISION SYSTEM LS 24,700.0000 24,700.00 0.000 0 053 MODIFY RAMP METERING SYSTEM LS 103,200.0000 103,200.00 0.000 0 054 RAMP METERING SYSTEM LS 87,900.0000 87,900.00 0.000 0 055 ROADSIDE WEATHER INFORMATION SYSTEM LS 53,600.0000 53,600.00 0.000 0 056 FIBER OPTIC SYSTEM LS 1,695,500.0000 1,695,500.00 0.149 252,629.50 0.297 503,563 PROGRAM CAS145 PAGE 4 DATE 06/20/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1C2104 TIME 10:24 AM ESTIMATE NO. 003 BID OPENING 10/21/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/16 R.E. NAME: RANBIR BHULLAR DATE OF THIS ESTIMATE 06/20/16 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 381,433.00 951,250.65 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 381,433.00 951,250.65 057 MOBILIZATION LS 110,000.0000 110,000.00 0.950 104,500 ORIGINAL CONTRACT AMOUNT 2,977,726.85 TOTAL WORK COMPLETED 381,433.00 1,055,750.65 MATERIALS ON HAND ON SITE 214,506.11 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 381,433.00 1,270,256.76 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/08/15 100 03/09/16 03/09/16 09/06/16 44 26 0 0 35% 44% PROGRESS IS SATISFACTORY RANBIR BHULLAR RESIDENT ENGINEER PROGRAM CAS145 DATE 06/20/16