PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 11/23/16 EST. NO. 008 TIME 01:17 PM R.E. NAME: QUAN H. TRINH 10-1C2204 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 11/23/16 EST. NO. 008 TIME 01:17 PM R.E. NAME: QUAN H. TRINH 10-1C2204 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION MISSING PAYROLLS -3,000.00 004 MISS PAYROLLS -2,000.00 005 REC'D PAYROLLS EST 4 3,000.00 006 REC'D PAYROLLS EST 5 2,000.00 006 MISSING PAYROLLS -2,000.00 008 -2,000.00 -2,000.00 TOTAL DEDUCTIONS -2,000.00 -2,000.00 PROGRAM CAS145 PAGE 1 DATE 11/23/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1C2204 TIME 01:17 PM ESTIMATE NO. 008 BID OPENING 10/13/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/16 R.E. NAME: QUAN H. TRINH DATE OF THIS ESTIMATE 11/23/16 LOCATION PROGRESS ESTIMATE 10-MER-99-0.0/ .0 ----------------- 10-TUO-108-0.0/ .0 ST. FRANCIS ELECTRIC, LLC IN MERCED, SAN JOAQUIN, STANISLAUS 10-STA-5-0.0/ .0 975 CARDEN STREET AND TUOLUMNE COUNTIES ON STATE SAN LEANDRO CA 94577 ROUTES 99, 108, 120, 152 AND ON INTERSTATES 5 AND 205 FED. AID NO. STP-000C(410)E TMS ELEMENT UPGRADES ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,500.0000 1,500.00 1.000 1,500 002 CONSTRUCTION AREA SIGNS LS 27,500.0000 27,500.00 0.020 550.00 0.893 24,557 003 TRAFFIC CONTROL SYSTEM LS 150,000.0000 150,000.00 0.050 7,500.00 0.807 121,050 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 36,000.0000 36,000.00 0.050 1,800.00 0.807 29,052 005 JOB SITE MANAGEMENT LS 185.0000 185.00 0.050 9.25 0.807 149 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 700.0000 700.00 0.020 14.00 0.913 639 007 TEMPORARY CONCRETE WASHOUT LS 480.0000 480.00 0.080 38.40 0.780 374 008 TREATED WOOD WASTE LB 0.0500 61.50 0.000 0 009 REMOVE GUARDRAIL LF 10.0000 1,200.00 0.000 0 010 REMOVE SIGN STRUCTURE (EA) EA 6,200.0000 6,200.00 0.000 0 011 60" CAST-IN-DRILLED-HOLE CONCRETE LF 1,510.0000 33,220.00 0.000 0 PILE (SIGN FOUNDATION) 012 FURNISH SIGN STRUCTURE (TRUSS) LB 4.0000 55,360.00 0.000 0 (F) 013 INSTALL SIGN STRUCTURE (TRUSS) LB 0.4000 5,536.00 0.000 0 (F) 014 GUARD RAILING DELINEATOR EA 33.0000 99.00 0.000 0 015 OBJECT MARKER (TYPE L-1) EA 65.0000 65.00 0.000 0 016 MIDWEST GUARDRAIL SYSTEM (WOOD POST) LF 54.0000 3,402.00 0.000 0 017 VEGETATION CONTROL (MINOR CONCRETE) SQYD 83.0000 9,130.00 0.000 0 018 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,600.0000 5,200.00 0.000 0 019 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 3,170.0000 3,170.00 0.050 158.50 0.807 2,558 SYSTEM ELEMENTS DURING CONSTRUCTION 020 MODIFY TRAFFIC MONITORING STATION LS 112,800.0000 112,800.00 0.606 68,356 021 MODIFY ROADSIDE WEATHER INFORMATION LS 288,400.0000 288,400.00 0.931 268,500 SYSTEM 022 MODIFY TRAFFIC OPERATION SYSTEM LS 1,096,000.0000 1,096,000.00 0.934 1,023,664 PROGRAM CAS145 PAGE 2 DATE 11/23/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1C2204 TIME 01:17 PM ESTIMATE NO. 008 BID OPENING 10/13/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/16 R.E. NAME: QUAN H. TRINH DATE OF THIS ESTIMATE 11/23/16 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 ROADSIDE WEATHER INFORMATION SYSTEM LS 130,000.0000 130,000.00 0.946 122,980 024 FIBER OPTIC SYSTEM LS 763,771.0000 763,771.00 0.017 12,984.11 0.651 497,214 PROGRAM CAS145 PAGE 3 DATE 11/23/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1C2204 TIME 01:17 PM ESTIMATE NO. 008 BID OPENING 10/13/15 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/16 R.E. NAME: QUAN H. TRINH DATE OF THIS ESTIMATE 11/23/16 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 23,054.26 2,160,596.61 ADJUSTMENT OF COMPENSATION 0.00 49,335.00 EXTRA WORK 0.00 135,529.27 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 23,054.26 2,345,460.88 025 MOBILIZATION LS 35,000.0000 35,000.00 1.000 35,000 ORIGINAL CONTRACT AMOUNT 2,764,979.50 TOTAL WORK COMPLETED 23,054.26 2,380,460.88 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -2,000.00 -2,000.00 TOTAL 21,054.26 2,378,460.88 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/08/15 180 03/07/16 03/21/16 02/01/17 158 12 25 0 72% 77% PROGRESS IS SATISFACTORY QUAN H. TRINH RESIDENT ENGINEER PROGRAM CAS145 DATE 11/23/16