PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/17/19 EST. NO. 003 TIME 10:34 AM R.E. NAME: COLIN DORAN 10-1C5404 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 003 0001 6,504.00 E.W. @ F.A.(+) 051419 N 0001 0 0002 5,908.88 051519 N 0002 0 12,412.88 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 12,412.88 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/17/19 EST. NO. 003 TIME 10:34 AM R.E. NAME: COLIN DORAN 10-1C5404 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 06/17/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1C5404 TIME 10:34 AM ESTIMATE NO. 003 BID OPENING 09/13/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/19 R.E. NAME: COLIN DORAN DATE OF THIS ESTIMATE 06/17/19 LOCATION PROGRESS ESTIMATE 10-TUO-108-L0.0/L0.4 ----------------- 10-TUO-120-11.6/12.2 GEORGE REED, INC. IN TUO CO ABOUT 5.8 MI WEST OF P. O. BOX 4760 JAMESTOWN ON RTE 108 FROM RTE 120 MODESTO CA 95352 TO 0.4 MI EAST OF RTE 120 & ON RTE 120 FROM 0.2 MI NORTH OF O'BYRNES FERRY RD TO 0.1 MI EAST OF RTE 108 FED. AID NO. SNHG-X109(5)E UPGRADE STOP-CONTROLLED ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 3,000.0000 3,000.00 1.000 3,000 002 CONSTRUCTION AREA SIGNS LS 5,000.0000 5,000.00 0.200 1,000.00 0.700 3,500 003 TRAFFIC CONTROL SYSTEM LS 400,000.0000 400,000.00 0.200 80,000.00 0.400 160,000 004 TYPE III BARRICADE EA 110.0000 110.00 0.200 22.00 0.700 77 005 TEMPORARY TRAFFIC STRIPE (TAPE) LF 3.0000 5,730.00 0.000 0 006 CHANNELIZER (SURFACE MOUNTED) EA 35.0000 490.00 7.000 245.00 7.000 245 007 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 11,000.0000 11,000.00 0.200 2,200.00 0.400 4,400 008 TEMPORARY RAILING (TYPE K) LF 15.0000 27,000.00 900.000 13,500 009 TEMPORARY CRASH CUSHION MODULE EA 20.0000 560.00 14.000 280 010 JOB SITE MANAGEMENT LS 7,500.0000 7,500.00 0.200 1,500.00 0.400 3,000 011 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,000.0000 1,000.00 0.100 100.00 0.700 700 012 TEMPORARY DRAINAGE INLET PROTECTION EA 150.0000 150.00 0.200 30.00 0.700 105 013 TEMPORARY SILT FENCE LF 4.5000 12,015.00 650.000 2,925 014 STREET SWEEPING LS 40,000.0000 40,000.00 0.200 8,000.00 0.400 16,000 015 TEMPORARY CONCRETE WASHOUT LS 1,000.0000 1,000.00 0.000 0 016 TREATED WOOD WASTE LB 0.5000 1,295.00 0.000 0 017 TEMPORARY HIGH-VISIBILITY FENCE LF 3.7500 5,850.00 780.000 2,925 018 CLEARING AND GRUBBING (LS) LS 65,000.0000 65,000.00 0.100 6,500.00 0.850 55,250 019 ROADWAY EXCAVATION CY 35.0000 283,850.00 2,110.000 73,850.00 8,110.000 283,850 020 IMPORTED BORROW (CY) CY 40.0000 1,440.00 0.000 0 021 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 500.0000 500.00 0.000 0 022 DUFF (ACRE) ACRE 4,500.0000 4,050.00 0.450 2,025.00 0.900 4,050 PROGRAM CAS145 PAGE 2 DATE 06/17/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1C5404 TIME 10:34 AM ESTIMATE NO. 003 BID OPENING 09/13/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/19 R.E. NAME: COLIN DORAN DATE OF THIS ESTIMATE 06/17/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 HYDROMULCH SQFT 0.0200 3,020.00 0.000 0 024 FIBER ROLLS LF 2.1000 35,280.00 0.000 0 025 HYDROSEED SQFT 0.1300 15,860.00 0.000 0 026 CLASS 2 AGGREGATE BASE (CY) CY 50.0000 239,000.00 100.000 5,000.00 100.000 5,000 027 PREPAVING INERTIAL PROFILER LS 6,000.0000 6,000.00 1.000 6,000.00 1.000 6,000 028 HOT MIX ASPHALT (TYPE A) TON 95.0000 887,300.00 0.000 0 029 DATA CORE LS 5,000.0000 5,000.00 0.000 0 030 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 1.5000 37.50 0.000 0 031 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 1.5000 3,900.00 0.000 0 032 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 1.5000 1,275.00 0.000 0 033 TACK COAT TON 1,000.0000 17,000.00 0.000 0 034 REMOVE ASPHALT CONCRETE DIKE LF 1.5000 420.00 0.000 0 035 MINOR CONCRETE (MINOR STRUCTURE) CY 2,100.0000 14,700.00 0.000 0 (F) 036 24" REINFORCED CONCRETE PIPE LF 175.0000 169,750.00 0.000 0 (CLASS III, RUBBER GASKET JOINT) 037 24" CONCRETE FLARED END SECTION EA 2,100.0000 2,100.00 0.000 0 038 INLET DEPRESSION EA 300.0000 1,200.00 0.000 0 039 ABANDON CULVERT (LF) LF 105.0000 11,550.00 0.000 0 040 REMOVE CULVERT (LF) LF 110.0000 25,300.00 0.000 0 041 REMOVE INLET EA 2,000.0000 2,000.00 0.000 0 042 REMOVE HEADWALL EA 2,250.0000 4,500.00 0.000 0 043 ADJUST OVERSIDE DRAIN EA 1,000.0000 2,000.00 0.000 0 044 SAND BACKFILL CY 100.0000 1,300.00 0.000 0 045 ROCK SLOPE PROTECTION CY 400.0000 4,000.00 0.000 0 (60 LB, CLASS II, METHOD B) (CY) 046 ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 20.0000 520.00 0.000 0 047 MINOR CONCRETE (CURB) (CY) CY 900.0000 25,200.00 0.000 0 048 MINOR CONCRETE (TEXTURED PAVING) CY 900.0000 9,000.00 0.000 0 049 MISCELLANEOUS IRON AND STEEL LB 6.0000 5,736.00 0.000 0 (F) PROGRAM CAS145 PAGE 3 DATE 06/17/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1C5404 TIME 10:34 AM ESTIMATE NO. 003 BID OPENING 09/13/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/19 R.E. NAME: COLIN DORAN DATE OF THIS ESTIMATE 06/17/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 REMOVE PAVEMENT MARKER EA 0.2500 105.00 0.000 0 051 DELINEATOR (CLASS 1) EA 40.0000 560.00 0.000 0 052 GUARD RAILING DELINEATOR EA 15.0000 900.00 0.000 0 053 PAVEMENT MARKER (RETROREFLECTIVE) EA 5.0000 3,350.00 0.000 0 054 OBJECT MARKER (TYPE K) EA 40.0000 40.00 0.000 0 055 REMOVE ROADSIDE SIGN EA 80.0000 2,320.00 5.000 400 056 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 13.0000 962.00 0.000 0 (0.063"-UNFRAMED) 057 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 10.0000 1,900.00 0.000 0 (0.063"-UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 058 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 10.5000 840.00 0.000 0 (0.080"-UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 059 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 16.0000 3,040.00 0.000 0 (0.063"-FRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 060 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 17.0000 3,060.00 0.000 0 (0.080"-FRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 061 RETROREFLECTIVE SHEETING (TYPE XI) SQFT 4.0000 2,520.00 0.000 0 062 ROADSIDE SIGN - ONE POST EA 275.0000 6,325.00 0.000 0 063 ROADSIDE SIGN - TWO POST EA 375.0000 3,375.00 0.000 0 064 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 80.0000 880.00 0.000 0 METHOD) 065 INSTALL SIGN (MAST-ARM HANGER METHOD) EA 275.0000 825.00 0.000 0 066 MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 25.0000 37,500.00 0.000 0 067 VEGETATION CONTROL (MINOR CONCRETE) SQYD 34.0000 28,560.00 0.000 0 068 END ANCHOR ASSEMBLY (TYPE SFT) EA 750.0000 2,250.00 0.000 0 069 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 3,300.0000 16,500.00 0.000 0 070 THERMOPLASTIC PAVEMENT MARKING SQFT 5.0000 6,750.00 0.000 0 071 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 410.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 6-1) 072 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.7500 2,415.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 073 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.2500 17,875.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) PROGRAM CAS145 PAGE 4 DATE 06/17/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1C5404 TIME 10:34 AM ESTIMATE NO. 003 BID OPENING 09/13/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/19 R.E. NAME: COLIN DORAN DATE OF THIS ESTIMATE 06/17/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 074 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.6000 6,976.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 075 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 630.00 0.000 0 076 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 5.0000 1,050.00 0.000 0 077 12" RUMBLE STRIP STA 85.0000 12,750.00 0.000 0 (ASPHALT CONCRETE PAVEMENT) 078 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,500.0000 1,500.00 0.200 300.00 0.400 600 SYSTEM ELEMENTS DURING CONSTRUCTION 079 SIGNAL AND LIGHTING SYSTEM LS 400,000.0000 400,000.00 0.000 0 080 TRAFFIC MONITORING STATION SYSTEM LS 50,000.0000 50,000.00 0.000 0 081 MODIFYING EXISTING ELECTRICAL SYSTEM LS 159,000.0000 159,000.00 0.000 0 082 REMOVING EXISTING ELECTRICAL SYSTEM LS 6,200.0000 6,200.00 0.000 0 PROGRAM CAS145 PAGE 5 DATE 06/17/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1C5404 TIME 10:34 AM ESTIMATE NO. 003 BID OPENING 09/13/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/19 R.E. NAME: COLIN DORAN DATE OF THIS ESTIMATE 06/17/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 186,772.00 565,807.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 12,412.88 12,412.88 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 199,184.88 578,219.88 083 MOBILIZATION LS 178,000.0000 178,000.00 0.750 133,500 ORIGINAL CONTRACT AMOUNT 3,328,856.50 TOTAL WORK COMPLETED 199,184.88 711,719.88 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 199,184.88 711,719.88 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 11/08/18 65 03/21/19 05/01/19 08/21/19 17 71 0 0 21% 26% PROGRESS IS SATISFACTORY COLIN DORAN RESIDENT ENGINEER PROGRAM CAS145 DATE 06/17/19