PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/23/17 EST. NO. 002 TIME 11:00 AM R.E. NAME: KEVIN KEISTER 10-1C5504 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/23/17 EST. NO. 002 TIME 11:00 AM R.E. NAME: KEVIN KEISTER 10-1C5504 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 10/23/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1C5504 TIME 11:00 AM ESTIMATE NO. 002 BID OPENING 04/18/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/17 R.E. NAME: KEVIN KEISTER DATE OF THIS ESTIMATE 10/23/17 LOCATION PROGRESS ESTIMATE 10-MER-152-R2.4/R6.0 ----------------- DREAMBUILDER CONSTRUCTION IN MERCED COUNTY ALONG STATE ROUTE CORP. 152 FROM PM R2.4 TO PM R6.0 1324 LAWSON LN PLACENTIA CA 92870 FED. AID NO. HSNH-P152(93)E INSTALL MEDIAN BARRIERS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 7,100.0000 7,100.00 1.000 7,100 002 CONSTRUCTION AREA SIGNS LS 4,500.0000 4,500.00 0.340 1,530.00 0.540 2,430 003 TRAFFIC CONTROL SYSTEM LS 39,555.0000 39,555.00 0.340 13,448.70 0.540 21,359 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 5,500.0000 5,500.00 0.340 1,870.00 0.540 2,970 005 JOB SITE MANAGEMENT LS 4,000.0000 4,000.00 0.340 1,360.00 0.540 2,160 006 PREPARE STORM WATER POLLUTION PREVENTION LS 2,000.0000 2,000.00 1.000 2,000 PLAN 007 STORM WATER ANNUAL REPORT EA 2,000.0000 4,000.00 1.000 2,000 008 TEMPORARY HYDRAULIC MULCH SQYD 0.2800 280.00 0.000 0 (BONDED FIBER MATRIX) 009 TEMPORARY DRAINAGE INLET PROTECTION EA 120.0000 1,680.00 0.000 0 010 TEMPORARY FIBER ROLL LF 5.0000 5,000.00 0.000 0 011 STREET SWEEPING LS 3,400.0000 3,400.00 0.000 0 012 TEMPORARY CONCRETE WASHOUT LS 2,200.0000 2,200.00 0.000 0 013 CLEARING AND GRUBBING (LS) LS 2,500.0000 2,500.00 0.000 0 014 ROADWAY EXCAVATION CY 50.0000 20,000.00 692.440 34,622.00 692.440 34,622 015 STRUCTURE EXCAVATION CY 300.0000 210,000.00 294.950 88,485.00 390.210 117,063 (F) 016 IMPORTED BORROW (CY) CY 108.0000 64,800.00 0.000 0 017 HYDROMULCH SQFT 0.0400 18,280.00 0.000 0 018 18" CORRUGATED STEEL PIPE (.138" THICK) LF 340.0000 3,060.00 0.000 0 019 36" PRECAST CONCRETE PIPE INLET LF 570.0000 8,550.00 0.000 0 020 INLET DEPRESSION EA 2,000.0000 28,000.00 0.000 0 021 REMOVE CULVERT (LF) LF 230.0000 2,300.00 0.000 0 022 REMOVE INLET EA 1,350.0000 5,400.00 3.000 4,050.00 3.000 4,050 PROGRAM CAS145 PAGE 2 DATE 10/23/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1C5504 TIME 11:00 AM ESTIMATE NO. 002 BID OPENING 04/18/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/17 R.E. NAME: KEVIN KEISTER DATE OF THIS ESTIMATE 10/23/17 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 MINOR CONCRETE (MISCELLANEOUS CY 516.0000 206,400.00 0.000 0 CONSTRUCTION) 024 MISCELLANEOUS IRON AND STEEL LB 2.9500 2,784.80 0.000 0 (F) 025 ADJUST MONUMENT COVER TO GRADE EA 800.0000 2,400.00 0.000 0 026 DOUBLE THRIE BEAM BARRIER (STEEL POST) LF 47.2800 903,048.00 2,500.000 118,200.00 2,500.000 118,200 027 ALTERNATIVE CRASH CUSHION EA 37,000.0000 74,000.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 10/23/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1C5504 TIME 11:00 AM ESTIMATE NO. 002 BID OPENING 04/18/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/17 R.E. NAME: KEVIN KEISTER DATE OF THIS ESTIMATE 10/23/17 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 263,565.70 313,954.70 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 263,565.70 313,954.70 028 MOBILIZATION LS 168,323.2000 168,323.20 0.200 33,664.64 0.950 159,907 ORIGINAL CONTRACT AMOUNT 1,799,061.00 TOTAL WORK COMPLETED 297,230.34 473,861.74 MATERIALS ON HAND ON SITE 312,285.04 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 297,230.34 786,146.78 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 05/30/17 65 08/28/17 08/28/17 12/01/17 38 2 0 0 26% 58% PROGRESS IS SATISFACTORY KEVIN KEISTER RESIDENT ENGINEER PROGRAM CAS145 DATE 10/23/17