PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/18/20 EST. NO. 002 TIME 12:08 PM R.E. NAME: RANBIR BHULLAR 10-1C6904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/18/20 EST. NO. 002 TIME 12:08 PM R.E. NAME: RANBIR BHULLAR 10-1C6904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 06/18/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1C6904 TIME 12:08 PM ESTIMATE NO. 002 BID OPENING 08/29/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/20 R.E. NAME: RANBIR BHULLAR DATE OF THIS ESTIMATE 06/18/20 LOCATION PROGRESS ESTIMATE 10-TUO-0-0.0/ .0 ----------------- CCFG CONSTRUCTION IN TUOLUMNE COUNTY ON STATE ROUTE 17750 WARD FERRY RD. 49, 108, AND 120 AT VARIOUS SONORA CA 95370 LOCATIONS FED. AID NO. N O N E DRAINAGE SYSTEM RESTORATION ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,225.0000 1,225.00 0.170 208.25 0.390 477 002 CONSTRUCTION AREA SIGNS LS 20,000.0000 20,000.00 0.170 3,400.00 0.390 7,800 003 TRAFFIC CONTROL SYSTEM LS 260,000.0000 260,000.00 0.170 44,200.00 0.390 101,400 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 12,000.0000 12,000.00 0.170 2,040.00 0.390 4,680 005 JOB SITE MANAGEMENT LS 300,000.0000 300,000.00 0.170 51,000.00 0.390 117,000 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 595.0000 595.00 0.170 101.15 0.390 232 007 TEMPORARY CREEK DIVERSION SYSTEMS LS 48,979.4400 48,979.44 0.170 8,326.50 0.390 19,101 008 CONTRACTOR-SUPPLIED BIOLOGIST (LS) LS 108,850.0000 108,850.00 0.170 18,504.50 0.390 42,451 009 NATURAL RESOURCE PROTECTION PLAN LS 4,800.0000 4,800.00 0.170 816.00 0.390 1,872 010 CLEARING AND GRUBBING (LS) LS 40,000.0000 40,000.00 0.000 0 011 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 450.0000 1,800.00 0.000 0 012 HYDROMULCH SQFT 0.1000 2,090.00 0.000 0 013 FIBER ROLLS LF 3.7400 7,816.60 0.000 0 014 HYDROSEED SQFT 0.3400 7,106.00 0.000 0 015 COMPOST (CY) CY 242.5200 14,066.16 0.000 0 016 INCORPORATE MATERIALS SQFT 0.1900 3,971.00 0.000 0 017 HOT MIX ASPHALT (TYPE A) TON 400.0000 52,000.00 6.080 2,432.00 31.080 12,432 018 TACK COAT TON 1,000.0000 200.00 0.060 60 019 STRUCTURAL CONCRETE, HEADWALL CY 2,300.0000 34,500.00 0.000 0 (F) 020 STRUCTURAL CONCRETE, DRAINAGE INLET CY 1,600.0000 3,200.00 0.000 0 (F) 021 CONCRETE BACKFILL (PIPE TRENCH) CY 670.0000 12,060.00 0.000 0 (F) 022 18" REINFORCED CONCRETE PIPE (CLASS V) LF 315.0000 81,900.00 112.000 35,280 PROGRAM CAS145 PAGE 2 DATE 06/18/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1C6904 TIME 12:08 PM ESTIMATE NO. 002 BID OPENING 08/29/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/20 R.E. NAME: RANBIR BHULLAR DATE OF THIS ESTIMATE 06/18/20 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 24" REINFORCED CONCRETE PIPE (CLASS V) LF 375.0000 251,250.00 48.000 18,000.00 222.000 83,250 024 36" REINFORCED CONCRETE PIPE (CLASS V) LF 440.0000 48,400.00 0.000 0 025 24" CORRUGATED STEEL PIPE (.064" THICK) LF 685.0000 10,275.00 0.000 0 026 8" CORRUGATED STEEL PIPE DOWNDRAIN LF 200.0000 2,800.00 0.000 0 (.064" THICK) 027 24" CONCRETE FLARED END SECTION EA 2,500.0000 5,000.00 0.000 0 028 36" PRECAST CONCRETE PIPE INLET LF 500.0000 6,500.00 3.500 1,750.00 7.000 3,500 029 REMOVE INLET EA 2,900.0000 14,500.00 1.000 2,900.00 2.000 5,800 030 REMOVE HEADWALL EA 2,900.0000 8,700.00 2.000 5,800.00 2.000 5,800 031 CLEANING, INSPECTING, AND PREPARING LF 21.1100 29,765.10 808.000 17,056.88 808.000 17,056 CULVERT (LF) 032 18" CURED-IN-PLACE PIPELINER LF 231.1100 27,733.20 0.000 0 033 24" CURED-IN-PLACE PIPELINER LF 193.7700 89,134.20 0.000 0 034 30" CURED-IN-PLACE PIPELINER LF 265.7500 63,780.00 0.000 0 035 36" CURED-IN-PLACE PIPELINER LF 263.5100 113,309.30 0.000 0 036 50" CURED-IN-PLACE PIPELINER LF 1,258.3600 62,918.00 0.000 0 037 MINOR CONCRETE (MISCELLANEOUS CY 1,500.0000 3,000.00 0.500 750.00 1.000 1,500 CONSTRUCTION) 038 MISCELLANEOUS IRON AND STEEL LB 4.0000 3,776.00 236.000 944 (F) 039 PAVEMENT MARKER (RETROREFLECTIVE) EA 20.0000 160.00 8.000 160 040 OBJECT MARKER (TYPE L-2) EA 100.0000 3,200.00 0.000 0 041 PAINT TRAFFIC STRIPE (2-COAT) LF 8.0000 8,640.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 06/18/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1C6904 TIME 12:08 PM ESTIMATE NO. 002 BID OPENING 08/29/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/20 R.E. NAME: RANBIR BHULLAR DATE OF THIS ESTIMATE 06/18/20 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 177,285.28 460,798.16 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 51,296.65 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 177,285.28 512,094.81 042 MOBILIZATION LS 190,000.0000 190,000.00 0.200 38,000.00 0.950 180,500 ORIGINAL CONTRACT AMOUNT 1,960,000.00 TOTAL WORK COMPLETED 215,285.28 692,594.81 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 215,285.28 692,594.81 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 10/04/19 90 04/20/20 04/20/20 09/03/20 33 102 0 0 34% 37% PROGRESS IS SATISFACTORY RANBIR BHULLAR RESIDENT ENGINEER PROGRAM CAS145 DATE 06/18/20