PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 01/18/23 EST. NO. 016 TIME 01:55 PM R.E. NAME: HARMINDER DEOL 10-1C8104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 007 0001 20,786.83 E.W. @ L.S.(+) 112122 N 001 0 010 0001 25,080.00 E.W. @ L.S.(+) 112222 N 001 0 012 0001 4,972.77 A.C. @ L.S.(+) 122022 N 001 0 013 0001 -5,000.00 A.C. @ L.S.(-) 121522 N 001 0 45,839.60 TOTAL THIS ESTIMATE 148,431.61 TOTAL PREVIOUS ESTIMATE 194,271.21 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 01/18/23 EST. NO. 016 TIME 01:55 PM R.E. NAME: HARMINDER DEOL 10-1C8104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE MISS ANNUAL CEM-4401 -10,000.00 005 CEM-4401 SUBMITTED 10,000.00 007 MISS FINAL CEM-4401 -10,000.00 015 OUT OF STATE INSPECT -5,000.00 015 RECD FINAL CEM-4401 10,000.00 016 REVERSE OUT STATEFEE 5,000.00 016 15,000.00 0.00 TOTAL DEDUCTIONS 15,000.00 0.00 PROGRAM CAS145 PAGE 1 DATE 01/18/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1C8104 TIME 01:55 PM ESTIMATE NO. 016 BID OPENING 05/25/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/01/22 R.E. NAME: HARMINDER DEOL DATE OF THIS ESTIMATE 01/18/23 LOCATION SEMI-FINAL ESTIMATE 10-MER-0-0.0/ .0 ------------------- PACIFIC INFRASTRUCTURE IN MERCED, SAN JOAQUIN, MARIPOSA CONSTRUCTION LLC AND STANISLAUS COUNTIES AT VARIOUS 871 COTTING COURT STE A; LOCATIONS VACAVILLE CA 95688 FED. AID NO. N O N E BRIDGE PREVENTATIVE MAINTENANCE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 5,000.0000 5,000.00 1.000 5,000 002 TIME-RELATED OVERHEAD (WDAY) WDAY 1,300.0000 221,000.00 189.000 245,700 003 CONSTRUCTION AREA SIGNS LS 35,000.0000 35,000.00 1.000 35,000 004 TRAFFIC CONTROL SYSTEM LS 100,000.0000 100,000.00 1.000 100,000 005 CHANNELIZER (SURFACE MOUNTED) EA 45.0000 270.00 6.000 270 006 PORTABLE RADAR SPEED FEEDBACK SIGN EA 10.0000 5,300.00 60.000 600 SYSTEM DAY 007 PORTABLE FLASHING BEACONS (EA) EA 2,500.0000 2,500.00 1.000 2,500 008 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 15,000.0000 15,000.00 1.000 15,000 009 TEMPORARY RAILING (TYPE K) LF 65.0000 6,500.00 100.000 6,500 010 ALTERNATIVE TEMPORARY CRASH CUSHION EA 5,000.0000 10,000.00 2.000 10,000 011 JOB SITE MANAGEMENT LS 475,000.0000 475,000.00 1.000 475,000 012 PREPARE STORM WATER POLLUTION PREVENTION LS 10,000.0000 10,000.00 1.000 10,000 PLAN 013 STORM WATER ANNUAL REPORT EA 2,000.0000 4,000.00 2.000 4,000 014 TEMPORARY DRAINAGE INLET PROTECTION EA 500.0000 500.00 1.000 500 015 TEMPORARY FIBER ROLL LF 3.0000 2,460.00 100.000 300 016 TEMPORARY SILT FENCE LF 2.0000 16,440.00 2,379.000 4,758 017 TEMPORARY HIGH-VISIBILITY FLAGGING EA 25.0000 6,250.00 114.000 2,850 POLE 018 TEMPORARY CONSTRUCTION ROADWAY SQYD 45.0000 9,900.00 220.000 9,900 019 STREET SWEEPING LS 500.0000 500.00 1.000 500 020 TEMPORARY CONCRETE WASHOUT LS 500.0000 500.00 1.000 500 021 WATER QUALITY SAMPLING AND ANALYSIS DAY EA 300.0000 24,000.00 38.000 11,400 022 WATER QUALITY MONITORING REPORT EA 500.0000 10,000.00 38.000 19,000 PROGRAM CAS145 PAGE 2 DATE 01/18/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1C8104 TIME 01:55 PM ESTIMATE NO. 016 BID OPENING 05/25/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/01/22 R.E. NAME: HARMINDER DEOL DATE OF THIS ESTIMATE 01/18/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 WATER QUALITY ANNUAL REPORT EA 750.0000 1,500.00 1.000 750 024 TEMPORARY CREEK DIVERSION SYSTEMS LS 55,000.0000 55,000.00 1.000 55,000 025 WORK AREA MONITORING (BRIDGE) LS 15,000.0000 15,000.00 1.000 15,000 026 TREATED WOOD WASTE LB 8.0000 14,000.00 337.500 2,700 027 CONTRACTOR-SUPPLIED BIOLOGIST (LS) LS 65,000.0000 65,000.00 1.000 65,000 028 NATURAL RESOURCE PROTECTION PLAN LS 25,000.0000 25,000.00 1.000 25,000 029 BIRD EXCLUSION LS 5,000.0000 5,000.00 1.000 5,000 030 REMOVE ROCK, DEBRIS, AND SEDIMENT CY 455.0000 172,900.00 350.000 159,250 031 TEMPORARY HIGH-VISIBILITY FENCE LF 6.0000 9,420.00 958.000 5,748 032 STRUCTURE EXCAVATION (TYPE D) CY 240.0000 48,000.00 200.000 48,000 (F) 033 STRUCTURE EXCAVATION CY 445.0000 207,370.00 461.500 205,367 (F) (ROCK SLOPE PROTECTION) 034 HYDROMULCH SQFT 0.0500 3,000.00 6,736.000 336 035 FIBER ROLLS LF 3.0000 7,500.00 676.000 2,028 036 HYDROSEED SQFT 0.0500 3,000.00 6,736.000 336 037 COMPOST (CY) CY 85.0000 32,300.00 38.700 3,289 038 HOT MIX ASPHALT (TYPE A) TON 680.0000 2,720.00 7.970 5,419 039 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 45.0000 3,375.00 75.000 3,375 040 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 35.0000 525.00 15.000 525 041 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 25.0000 3,750.00 150.000 3,750 042 PLACE HOT MIX ASPHALT SQYD 325.0000 2,600.00 10.250 3,331 (MISCELLANEOUS AREA) 043 REMOVE ASPHALT CONCRETE PAVEMENT (SQFT) SQFT 22.0000 2,860.00 130.000 2,860 044 REMOVE ASPHALT CONCRETE DIKE LF 25.0000 6,000.00 240.000 6,000 045 STRUCTURAL CONCRETE, BRIDGE (REPAIR) CY 6,500.0000 123,500.00 21.980 142,870 046 BAR REINFORCING STEEL (BRIDGE) (REPAIR) LB 3.0000 5,130.00 1,710.000 5,130 (F) 047 STRUCTURAL STEEL (BRIDGE) LB 32.0000 21,120.00 660.000 21,120 (F) 048 CLEAN AND PAINT STRUCTURAL STEEL LS 10,000.0000 10,000.00 1.000 10,000 049 REMOVE UNSOUND CONCRETE (COLUMN) CF 425.0000 10,625.00 57.750 24,543 PROGRAM CAS145 PAGE 3 DATE 01/18/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1C8104 TIME 01:55 PM ESTIMATE NO. 016 BID OPENING 05/25/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/01/22 R.E. NAME: HARMINDER DEOL DATE OF THIS ESTIMATE 01/18/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 REMOVE UNSOUND CONCRETE CF 340.0000 2,720.00 8.000 2,720 051 REMOVE RIVETS EA 225.0000 5,400.00 24.000 5,400 052 GALVANIC ANODES EA 45.0000 43,830.00 72.000 3,240 053 12" CORRUGATED STEEL PIPE LF 225.0000 13,500.00 60.000 13,500 054 REMOVE SLOPE PROTECTION MATERIALS CY 345.0000 196,650.00 473.750 163,443 055 ROCK SLOPE PROTECTION CY 325.0000 286,650.00 423.440 137,618 (1/4 T, CLASS V, METHOD B) (CY) 056 ROCK SLOPE PROTECTION CY 425.0000 56,525.00 295.070 125,404 (300 LB, CLASS IV, METHOD B) (CY) 057 PARTIALLY GROUTED ROCK SLOPE PROTECTION CY 445.0000 48,060.00 0.000 0 (60 LB, CLASS II, METHOD B) (CY) 058 ROCK SLOPE PROTECTION CY 240.0000 226,800.00 727.000 174,480 (1/2 T, CLASS VII, METHOD B) (CY) 059 ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 4.0000 9,300.00 1,654.100 6,616 060 FENCE (TYPE BW, METAL POST) LF 39.0000 47,190.00 613.000 23,907 061 TEMPORARY FENCE (TYPE BW) LF 6.0000 7,320.00 697.000 4,182 062 REMOVE FENCE (TYPE BW) LF 30.0000 36,300.00 613.000 18,390 063 OBJECT MARKER (TYPE P) EA 55.0000 110.00 2.000 110 064 MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 125.0000 16,250.00 125.000 15,625 065 VEGETATION CONTROL (MINOR CONCRETE) SQYD 165.0000 11,880.00 68.000 11,220 066 TRANSITION RAILING (TYPE WB-31) EA 3,500.0000 3,500.00 1.000 3,500 067 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 4,500.0000 4,500.00 1.000 4,500 068 CONCRETE BARRIER TRANSITION LF 2,500.0000 8,750.00 5.500 13,750 069 REMOVE GUARDRAIL LF 45.0000 2,835.00 63.000 2,835 070 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 2,500.0000 2,500.00 1.000 2,500 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 4 DATE 01/18/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1C8104 TIME 01:55 PM ESTIMATE NO. 016 BID OPENING 05/25/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/01/22 R.E. NAME: HARMINDER DEOL DATE OF THIS ESTIMATE 01/18/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 0.00 2,513,951.10 ADJUSTMENT OF COMPENSATION -27.23 4,633.77 EXTRA WORK 45,866.83 189,637.44 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 45,839.60 2,708,222.31 071 MOBILIZATION LS 300,000.0000 300,000.00 1.000 300,000 ORIGINAL CONTRACT AMOUNT 3,146,885.00 TOTAL WORK COMPLETED 45,839.60 3,008,222.31 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 15,000.00 0.00 TOTAL 60,839.60 3,008,222.31 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/22/21 170 00/00/00 07/26/21 11/01/22 178 140 19 0 100% 100% HARMINDER DEOL RESIDENT ENGINEER