PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 04/23/21 EST. NO. 001 TIME 11:48 AM R.E. NAME: CHRIS HANSON 10-1C9404 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 04/23/21 EST. NO. 001 TIME 11:48 AM R.E. NAME: CHRIS HANSON 10-1C9404 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 04/23/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1C9404 TIME 11:48 AM ESTIMATE NO. 001 BID OPENING 07/07/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/21 R.E. NAME: CHRIS HANSON DATE OF THIS ESTIMATE 04/23/21 LOCATION PROGRESS ESTIMATE 10-SJ-5-26.4/27.0 ----------------- GOLDEN STATE BRIDGE, INC. SAN JOAQUIN SR 5 BRIDGE DECK 3701 MALLARD DRIVE REHABILITATION AT STOCKTON CHANNEL BENICIA CA 94510 VIADUCT FED. AID NO. N O N E REHABILITATE BRIDGE DECK ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 4,000.0000 4,000.00 0.500 2,000.00 0.500 2,000 002 TIME-RELATED OVERHEAD (WDAY) WDAY 3,750.0000 356,250.00 23.000 86,250.00 23.000 86,250 003 CONSTRUCTION AREA SIGNS LS 10,000.0000 10,000.00 0.200 2,000.00 0.200 2,000 004 TRAFFIC CONTROL SYSTEM LS 200,000.0000 200,000.00 0.000 0 005 TYPE III BARRICADE EA 100.0000 1,200.00 0.000 0 006 PORTABLE RADAR SPEED FEEDBACK SIGN EA 200.0000 19,000.00 21.000 4,200.00 21.000 4,200 SYSTEM DAY 007 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 20,000.0000 20,000.00 0.240 4,800.00 0.240 4,800 008 JOB SITE MANAGEMENT LS 9,000.0000 9,000.00 0.240 2,160.00 0.240 2,160 009 PREPARE WATER POLLUTION CONTROL PROGRAM LS 3,000.0000 3,000.00 0.750 2,250.00 0.750 2,250 010 TEMPORARY CONCRETE WASHOUT LS 5,000.0000 5,000.00 0.240 1,200.00 0.240 1,200 011 WATER QUALITY SAMPLING AND ANALYSIS DAY EA 650.0000 13,000.00 0.000 0 012 WATER QUALITY MONITORING REPORT EA 1,200.0000 3,600.00 0.000 0 013 WATER QUALITY ANNUAL REPORT EA 2,000.0000 2,000.00 0.000 0 014 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 1.0000 4,190.00 0.000 0 STRIPE (HAZARDOUS WASTE) 015 BAT EXCLUSION LS 10,000.0000 10,000.00 0.000 0 016 BIRD EXCLUSION LS 8,000.0000 8,000.00 0.000 0 017 STRUCTURAL CONCRETE, BRIDGE (RSC) CY 75,000.0000 67,500.00 0.000 0 (F) 018 RAPID SETTING CONCRETE (PATCH) CF 110.0000 1,321,100.00 2,315.390 254,692.90 2,315.390 254,692 019 REMOVE UNSOUND CONCRETE CF 75.0000 900,750.00 2,315.390 173,654.25 2,315.390 173,654 020 BRIDGE REMOVAL (PORTION) LS 100,000.0000 100,000.00 0.000 0 021 MISCELLANEOUS METAL (BRIDGE) LB 35.0000 127,750.00 0.000 0 (F) 022 REMOVE PAVEMENT MARKER EA 1.0000 540.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 04/23/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1C9404 TIME 11:48 AM ESTIMATE NO. 001 BID OPENING 07/07/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/21 R.E. NAME: CHRIS HANSON DATE OF THIS ESTIMATE 04/23/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 PAVEMENT MARKER (RETROREFLECTIVE) EA 5.0000 3,350.00 0.000 0 024 THERMOPLASTIC PAVEMENT MARKING SQFT 15.0000 2,250.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 025 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.5000 4,095.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 026 6" AUDIBLE TRAFFIC STRIPE SYSTEMS LF 2.5000 19,650.00 0.000 0 027 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 25,400.00 0.000 0 028 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 0.5000 75.00 0.000 0 029 8" TRAFFIC STRIPE TAPE WITH CONTRAST LF 4.0000 6,760.00 0.000 0 (WARRANTY) (BROKEN 12-3) 030 CONTRAST STRIPE PAINT (1-COAT) LF 0.5000 3,495.00 0.000 0 031 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 2.0000 26,400.00 0.000 0 (WARRANTY) (BROKEN 36-12) 032 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,000.0000 1,000.00 0.240 240.00 0.240 240 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 3 DATE 04/23/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1C9404 TIME 11:48 AM ESTIMATE NO. 001 BID OPENING 07/07/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/21 R.E. NAME: CHRIS HANSON DATE OF THIS ESTIMATE 04/23/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 533,447.15 533,447.15 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 533,447.15 533,447.15 033 MOBILIZATION LS 360,000.0000 360,000.00 0.750 270,000.00 0.750 270,000 ORIGINAL CONTRACT AMOUNT 3,638,355.00 TOTAL WORK COMPLETED 803,447.15 803,447.15 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 803,447.15 803,447.15 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 11/20/20 95 03/03/21 01/14/21 08/02/21 23 42 0 0 22% 24% PROGRESS IS SATISFACTORY CHRIS HANSON RESIDENT ENGINEER PROGRAM CAS145 DATE 04/23/21