PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 04/25/22 EST. NO. 001 TIME 07:49 AM R.E. NAME: CHRIS HANSON 10-1C9604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 04/25/22 EST. NO. 001 TIME 07:49 AM R.E. NAME: CHRIS HANSON 10-1C9604 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 04/25/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1C9604 TIME 07:49 AM ESTIMATE NO. 001 BID OPENING 10/05/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/22 R.E. NAME: CHRIS HANSON DATE OF THIS ESTIMATE 04/25/22 LOCATION PROGRESS ESTIMATE 10-SJ-120-R0.6/T6.8 ----------------- ECONOLITE SYSTEMS, INC. IN AND NEAR MANTECA AND LATHROP, 1250 N. TUSTIN AVE FROM ROUTE 5 TO ROUTE 99; ALSO ON ANAHEIM CA 92807 ROUTE 5 AT PM R13.34 AND ON ROUTE 99 AT PM 4.56. INSTALL FIBER OPTIC CABLE AS PART OF THE TRANSPORTATION FED. AID NO. N O N E UPGRADE EXISTING COMMUNICATION ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,896.9300 1,896.93 1.000 1,896.93 1.000 1,896 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 19,578.2300 19,578.23 0.000 0 003 TIME-RELATED OVERHEAD (WDAY) WDAY 2,544.6800 559,829.60 0.000 0 004 DISPUTE RESOLUTION ADVISOR ON-SITE EA 2,000.0000 12,000.00 0.000 0 MEETING 005 HOURLY OFF-SITE HR 200.0000 2,000.00 0.000 0 DISPUTE-RESOLUTION-ADVISOR-RELATED TASKS 006 CONSTRUCTION AREA SIGNS LS 29,601.0600 29,601.06 0.000 0 007 TRAFFIC CONTROL SYSTEM LS 403,074.4100 403,074.41 0.000 0 008 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 1,230.2800 36,908.40 0.000 0 009 TYPE III BARRICADE EA 125.8900 1,510.68 0.000 0 010 PORTABLE RADAR SPEED FEEDBACK SIGN EA 57.2200 2,288.80 0.000 0 SYSTEM DAY 011 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 17,166.6700 17,166.67 0.000 0 012 JOB SITE MANAGEMENT LS 37,963.3400 37,963.34 0.000 0 013 PREPARE WATER POLLUTION CONTROL PROGRAM LS 30,522.6500 30,522.65 0.750 22,891.99 0.750 22,891 014 TEMPORARY DRAINAGE INLET PROTECTION EA 196.8400 11,810.40 0.000 0 015 TEMPORARY FIBER ROLL LF 4.1500 1,245.00 0.000 0 016 TEMPORARY CONCRETE WASHOUT LS 6,323.0600 6,323.06 0.000 0 017 TEMPORARY HIGH-VISIBILITY FENCE LF 3.2000 928.00 0.000 0 018 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 572.2200 1,144.44 0.000 0 019 HYDROMULCH SQFT 0.2600 1,684.80 0.000 0 020 FIBER ROLLS LF 4.1500 8,715.00 0.000 0 021 HYDROSEED SQFT 0.3100 2,008.80 0.000 0 022 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 34,333.3300 34,333.33 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 2 DATE 04/25/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1C9604 TIME 07:49 AM ESTIMATE NO. 001 BID OPENING 10/05/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/22 R.E. NAME: CHRIS HANSON DATE OF THIS ESTIMATE 04/25/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 FIBER OPTIC CABLE SYSTEMS LS 2,616,442.1100 2,616,442.11 0.000 0 024 MODIFYING SIGNAL AND LIGHTING SYSTEMS LS 68,338.3000 68,338.30 0.000 0 PROGRAM CAS145 PAGE 3 DATE 04/25/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1C9604 TIME 07:49 AM ESTIMATE NO. 001 BID OPENING 10/05/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/22 R.E. NAME: CHRIS HANSON DATE OF THIS ESTIMATE 04/25/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 24,788.92 24,788.92 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 24,788.92 24,788.92 025 MOBILIZATION LS 57,647.3900 57,647.39 0.000 0 ORIGINAL CONTRACT AMOUNT 3,964,961.40 TOTAL WORK COMPLETED 24,788.92 24,788.92 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 24,788.92 24,788.92 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/14/21 220 02/07/22 02/07/22 03/10/23 0 51 0 0 1% 0% PROGRESS IS SATISFACTORY CHRIS HANSON RESIDENT ENGINEER