PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/26/16 EST. NO. 001 TIME 10:12 AM R.E. NAME: DEOL, SUKHI 10-1E2704 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/26/16 EST. NO. 001 TIME 10:12 AM R.E. NAME: DEOL, SUKHI 10-1E2704 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 07/26/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1E2704 TIME 10:12 AM ESTIMATE NO. 001 BID OPENING 02/03/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/16 R.E. NAME: DEOL, SUKHI DATE OF THIS ESTIMATE 07/26/16 LOCATION PROGRESS ESTIMATE 10-MER-99-13.1/R36.7 ----------------- STOUDENMIRE CORPORATION IN MERCED COUNTY AT VARIOUS 1680 EL CAMINO REAL SUITE 4 LOCATIONS IN AND NEAR MERCED FROM ATASCADERO CA 93422 CHILDS AVENUE OVERCROSSING TO GRIFFITH ROAD OVERCROSSING FED. AID NO. N O N E TREAT BRIDGE DECKS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,500.0000 1,500.00 0.000 0 002 CONSTRUCTION AREA SIGNS LS 8,500.0000 8,500.00 0.500 4,250.00 0.500 4,250 003 TRAFFIC CONTROL SYSTEM LS 106,553.0000 106,553.00 0.000 0 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 6,000.0000 6,000.00 0.000 0 005 JOB SITE MANAGEMENT LS 2,000.0000 2,000.00 0.000 0 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 2,000.0000 2,000.00 0.000 0 007 TEMPORARY CONCRETE WASHOUT LS 3,500.0000 3,500.00 0.000 0 008 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 1.5000 7,770.00 0.000 0 STRIPE (HAZARDOUS WASTE) 009 PUBLIC SAFETY PLAN LS 7,000.0000 7,000.00 0.000 0 010 RAPID SETTING CONCRETE (PATCH) CF 45.0000 517.50 0.000 0 011 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 2.0000 1,000.00 0.000 0 012 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 6.0000 720.00 0.000 0 013 REMOVE PAVEMENT MARKER EA 1.0000 200.00 0.000 0 014 REMOVE DEBRIS LS 263.4500 263.45 0.000 0 015 REMOVE UNSOUND CONCRETE CF 55.0000 632.50 0.000 0 016 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.2000 27,634.60 0.000 0 017 TREAT BRIDGE DECK SQFT 0.3000 41,451.90 0.000 0 (F) 018 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 15.0000 23,085.00 0.000 0 019 BRIDGE REMOVAL (PORTION) LS 15,000.0000 15,000.00 0.000 0 020 STRUCTURAL CONCRETE, BRIDGE CY 1,500.0000 3,600.00 0.000 0 (F) 021 STRUCTURAL CONCRETE, APPROACH SLAB CY 1,620.0000 103,680.00 0.000 0 (TYPE R) 022 PAVING NOTCH EXTENSION CF 350.0000 13,300.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 07/26/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1E2704 TIME 10:12 AM ESTIMATE NO. 001 BID OPENING 02/03/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/16 R.E. NAME: DEOL, SUKHI DATE OF THIS ESTIMATE 07/26/16 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 CLEAN EXPANSION JOINT LF 20.2200 12,981.24 0.000 0 024 JOINT SEAL (MR 1/2") LF 62.3600 21,950.72 0.000 0 025 JOINT SEAL (MR 1") LF 65.6800 4,597.60 0.000 0 026 JOINT SEAL (MR 2") LF 67.1900 18,006.92 0.000 0 027 BAR REINFORCING STEEL (BRIDGE) LB 10.0000 1,460.00 0.000 0 (F) 028 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.8000 7,072.00 0.000 0 029 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 250.00 0.000 0 030 THERMOPLASTIC PAVEMENT MARKING SQFT 14.0000 1,680.00 0.000 0 031 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.6500 40.95 0.000 0 (BROKEN 17-7) 032 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.6500 1,241.50 0.000 0 (BROKEN 18-12) 033 PAVEMENT MARKER (RETROREFLECTIVE) EA 11.0000 2,200.00 0.000 0 034 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,500.0000 1,500.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 3 DATE 07/26/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1E2704 TIME 10:12 AM ESTIMATE NO. 001 BID OPENING 02/03/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/16 R.E. NAME: DEOL, SUKHI DATE OF THIS ESTIMATE 07/26/16 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 4,250.00 4,250.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 4,250.00 4,250.00 035 MOBILIZATION LS 40,000.0000 40,000.00 0.000 0 ORIGINAL CONTRACT AMOUNT 488,888.88 TOTAL WORK COMPLETED 4,250.00 4,250.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 4,250.00 4,250.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/12/16 145 00/00/00 04/28/16 11/23/16 58 0 0 0 1% 40% PROGRESS IS SATISFACTORY DEOL, SUKHI RESIDENT ENGINEER PROGRAM CAS145 DATE 07/26/16