PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 04/25/22 EST. NO. 002 TIME 07:52 AM R.E. NAME: TROY SCHEIBER 10-1F1704 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 11,990.00 E.W. @ F.A.(+) 032822 N 1 0 11,990.00 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 11,990.00 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 04/25/22 EST. NO. 002 TIME 07:52 AM R.E. NAME: TROY SCHEIBER 10-1F1704 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 04/25/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1F1704 TIME 07:52 AM ESTIMATE NO. 002 BID OPENING 09/02/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/22 R.E. NAME: TROY SCHEIBER DATE OF THIS ESTIMATE 04/25/22 LOCATION PROGRESS ESTIMATE 10-SJ-26-1.1/1.1 ----------------- 10-SJ-99-19.3/19.3 ANDREW M. JORDAN INC, DBA A & IN SAN JOAQUIN COUNTY IN STOCKTON B CONSTRUCTION AT ROUTE 26/99 SEPARATION 1350 4TH STREET; BERKELEY CA 94710 FED. AID NO. N O N E INCREASE BRIDGE VERTICAL CLEARANCE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,200.0000 1,200.00 1.000 1,200 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 5,000.0000 5,000.00 1.000 5,000 003 TIME-RELATED OVERHEAD (WDAY) WDAY 3,200.0000 640,000.00 15.000 48,000.00 28.000 89,600 004 DISPUTE RESOLUTION ADVISOR ON-SITE EA 2,000.0000 12,000.00 1.000 2,000.00 1.000 2,000 MEETING 005 HOURLY OFF-SITE HR 200.0000 2,000.00 3.500 700.00 3.500 700 DISPUTE-RESOLUTION-ADVISOR-RELATED TASKS 006 CONSTRUCTION AREA SIGNS LS 35,000.0000 35,000.00 0.500 17,500 007 TRAFFIC CONTROL SYSTEM LS 160,000.0000 160,000.00 0.080 12,800.00 0.140 22,400 008 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 009 FLASHING ARROW SIGN EA 900.0000 4,500.00 3.000 2,700.00 4.000 3,600 010 TYPE III BARRICADE EA 50.0000 1,200.00 5.000 250.00 5.000 250 011 TEMPORARY TRAFFIC STRIPE (TAPE) LF 1.6800 42,672.00 5,020.000 8,433.60 22,354.000 37,554 012 TEMPORARY PAVEMENT MARKING (TAPE) SQFT 12.0000 11,880.00 199.000 2,388.00 199.000 2,388 013 CHANNELIZER (SURFACE MOUNTED) EA 36.0000 7,920.00 83.000 2,988.00 194.000 6,984 014 PORTABLE RADAR SPEED FEEDBACK SIGN EA 41.0000 8,200.00 0.000 0 SYSTEM DAY 015 TEMPORARY PAVEMENT MARKER EA 4.0000 2,040.00 382.000 1,528 016 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 25,000.0000 25,000.00 0.080 2,000.00 0.140 3,500 017 END OF QUEUE MONITORING AND EA 250.0000 15,000.00 33.000 8,250.00 40.000 10,000 WARNING WITH TRUCK MOUNTED CHANGEABLE MESSAGE SIGN DAY 018 TEMPORARY FLASHING BEACON LS 4,000.0000 4,000.00 0.000 0 019 TEMPORARY RAILING (TYPE K) LF 36.0000 131,760.00 1,200.000 43,200.00 1,920.000 69,120 020 TEMPORARY CRASH CUSHION MODULE EA 200.0000 15,600.00 11.000 2,200.00 39.000 7,800 021 TEMPORARY RADAR SPEED FEEDBACK EA 2,200.0000 13,200.00 2.000 4,400 SIGN SYSTEM PROGRAM CAS145 PAGE 2 DATE 04/25/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1F1704 TIME 07:52 AM ESTIMATE NO. 002 BID OPENING 09/02/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/22 R.E. NAME: TROY SCHEIBER DATE OF THIS ESTIMATE 04/25/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 022 JOB SITE MANAGEMENT LS 8,000.0000 8,000.00 0.080 640.00 0.140 1,120 023 PREPARE STORM WATER POLLUTION PREVENTION LS 1,700.0000 1,700.00 1.000 1,700 PLAN 024 RAIN EVENT ACTION PLAN EA 500.0000 40,000.00 0.000 0 025 STORM WATER SAMPLING AND ANALYSIS DAY EA 285.0000 7,410.00 0.000 0 026 STORM WATER ANNUAL REPORT EA 2,000.0000 6,000.00 0.000 0 027 TEMPORARY DRAINAGE INLET PROTECTION EA 250.0000 500.00 2.000 500.00 2.000 500 028 TEMPORARY FIBER ROLL LF 3.2500 5,265.00 740.000 2,405.00 740.000 2,405 029 TEMPORARY CONSTRUCTION ENTRANCE EA 5,000.0000 20,000.00 0.000 0 030 STREET SWEEPING LS 40,000.0000 40,000.00 0.080 3,200.00 0.140 5,600 031 TEMPORARY CONCRETE WASHOUT LS 5,000.0000 5,000.00 0.000 0 032 ASBESTOS COMPLIANCE PLAN LS 1,200.0000 1,200.00 1.000 1,200.00 1.000 1,200 033 TREATED WOOD WASTE LB 0.3000 4,170.00 0.000 0 034 ROADWAY EXCAVATION CY 200.0000 14,400.00 5.900 1,180.00 5.900 1,180 035 SHOULDER BACKING TON 65.0000 2,080.00 0.000 0 036 STRUCTURE EXCAVATION (BRIDGE) CY 300.0000 37,500.00 35.000 10,500.00 35.000 10,500 (F) 037 STRUCTURE BACKFILL (BRIDGE) CY 100.0000 8,800.00 0.000 0 (F) 038 IMPORTED BORROW (CY) CY 120.0000 24,000.00 0.000 0 039 WOOD MULCH CY 90.0000 6,300.00 0.000 0 040 HOT MIX ASPHALT (TYPE A) TON 175.0000 470,750.00 0.000 0 041 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 11.0000 3,410.00 0.000 0 042 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 11.0000 2,970.00 0.000 0 043 REMOVE ASPHALT CONCRETE DIKE LF 11.0000 6,270.00 0.000 0 044 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 12.0000 67,440.00 0.000 0 045 REMOVE BASE AND SURFACING CY 120.0000 3,840.00 0.000 0 046 16" CAST-IN-DRILLED-HOLE CONCRETE PILING LF 400.0000 88,000.00 0.000 0 047 STRUCTURAL CONCRETE, BRIDGE FOOTING CY 1,500.0000 48,000.00 0.000 0 (F) 048 STRUCTURAL CONCRETE, BRIDGE CY 2,000.0000 124,000.00 0.000 0 (F) PROGRAM CAS145 PAGE 3 DATE 04/25/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1F1704 TIME 07:52 AM ESTIMATE NO. 002 BID OPENING 09/02/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/22 R.E. NAME: TROY SCHEIBER DATE OF THIS ESTIMATE 04/25/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 049 STRUCTURAL CONCRETE, BRIDGE CY 1,100.0000 308,000.00 0.000 0 (F) (POLYMER FIBER) 050 STRUCTURAL CONCRETE, APPROACH SLAB CY 600.0000 192,000.00 0.000 0 (TYPE R MODIFIED) 051 STRUCTURAL CONCRETE, DRAINAGE INLET CY 800.0000 3,600.00 0.000 0 (F) 052 DRILL AND BOND DOWEL LF 30.0000 12,420.00 0.000 0 053 JOINT SEAL (MR 1/2") LF 85.0000 14,280.00 0.000 0 054 JOINT SEAL (MR 1 1/2") LF 180.0000 15,120.00 0.000 0 055 BAR REINFORCING STEEL (BRIDGE) LB 1.3000 137,605.00 0.000 0 (F) 056 FURNISH STRUCTURAL STEEL (BRIDGE) LB 2.5500 773,415.00 0.000 0 (F) 057 ERECT STRUCTURAL STEEL (BRIDGE) LB 0.2500 75,825.00 0.000 0 (F) 058 FURNISH SIGN STRUCTURE (BRIDGE MOUNTED LB 12.0000 42,600.00 0.000 0 (F) WITHOUT WALKWAY) 059 INSTALL SIGN STRUCTURE (BRIDGE MOUNTED LB 6.0000 21,300.00 0.000 0 (F) WITHOUT WALKWAY) 060 CLEAN AND PAINT STRUCTURAL STEEL LS 135,200.0000 135,200.00 0.000 0 061 BRIDGE REMOVAL (PORTION) LS 213,763.5000 213,763.50 0.550 117,569.93 0.550 117,569 062 18" REINFORCED CONCRETE PIPE (CLASS IV) LF 180.0000 16,200.00 0.000 0 063 18" CONCRETE FLARED END SECTION EA 1,800.0000 3,600.00 0.000 0 064 REMOVE CULVERT (LF) LF 30.0000 2,700.00 0.000 0 065 REMOVE INLET EA 1,200.0000 2,400.00 0.000 0 066 REMOVE FLARED END SECTION (EA) EA 650.0000 1,300.00 0.000 0 067 ROCK SLOPE PROTECTION CY 310.0000 4,340.00 0.000 0 (60 LB, CLASS II, METHOD B) (CY) 068 ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 7.0000 238.00 0.000 0 069 MINOR CONCRETE (CURB, SIDEWALK AND CY 700.0000 60,900.00 0.000 0 CURB RAMP) 070 REMOVE CONCRETE CY 210.0000 11,760.00 32.000 6,720 (CURB, GUTTER, AND SIDEWALK) (CY) 071 PRE/POST CONSTRUCTION SURVEYS EA 3,450.0000 6,900.00 0.000 0 072 MISCELLANEOUS IRON AND STEEL LB 3.0000 2,838.00 0.000 0 (F) 073 MISCELLANEOUS METAL (BRIDGE) LB 20.0000 9,060.00 0.000 0 (F) 074 TEMPORARY FENCE (TYPE CL-6) LF 22.0000 704.00 32.000 704.00 32.000 704 075 TEMPORARY CHAIN LINK GATE EA 1,800.0000 7,200.00 4.000 7,200.00 4.000 7,200 (TYPE CL-6, 20' WIDE) PROGRAM CAS145 PAGE 4 DATE 04/25/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1F1704 TIME 07:52 AM ESTIMATE NO. 002 BID OPENING 09/02/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/22 R.E. NAME: TROY SCHEIBER DATE OF THIS ESTIMATE 04/25/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 076 REMOVE PAVEMENT MARKER EA 1.5000 825.00 537.000 805 077 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.5000 3,195.00 0.000 0 078 REMOVE ROADSIDE SIGN EA 150.0000 450.00 0.000 0 079 FURNISH LAMINATED PANEL SIGN (1"-TYPE A) SQFT 30.0000 17,700.00 0.000 0 080 MIDWEST GUARDRAIL SYSTEM (WOOD POST) LF 44.0000 15,400.00 0.000 0 081 VEGETATION CONTROL MAT (RUBBER) SQYD 53.0000 12,720.00 0.000 0 082 CHAIN LINK RAILING (TYPE 7) LF 120.0000 25,560.00 0.000 0 (F) 083 TRANSITION RAILING (TYPE WB-31) EA 6,000.0000 12,000.00 0.000 0 084 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 085 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 086 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 4,100.0000 8,200.00 0.000 0 087 CONCRETE BARRIER (TYPE 60MGF) LF 500.0000 90,000.00 0.000 0 088 CONCRETE BARRIER (TYPE 732SW) LF 300.0000 64,500.00 0.000 0 (F) 089 CONCRETE BARRIER (TYPE 842) LF 160.0000 34,400.00 0.000 0 (F) 090 REMOVE GUARDRAIL LF 16.0000 3,360.00 0.000 0 091 SALVAGE METAL BRIDGE RAILING LF 22.0000 4,730.00 0.000 0 092 REMOVE CONCRETE BARRIER LF 50.0000 9,000.00 150.000 7,500.00 150.000 7,500 093 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.5000 360.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 6-1) 094 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.6500 6,350.50 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 095 PAVEMENT MARKING TAPE (WARRANTY) SQFT 9.0000 378.00 0.000 0 096 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 11,300.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 097 8" THERMOPLASTIC TRAFFIC STRIPE LF 2.0000 2,020.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 098 8" THERMOPLASTIC TRAFFIC STRIPE LF 2.0000 3,720.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3) 099 THERMOPLASTIC CROSSWALK AND PAVEMENT SQFT 9.5000 6,270.00 0.000 0 MARKING (ENHANCED WET NIGHT VISIBILITY) 100 12" THERMOPLASTIC TRAFFIC STRIPE LF 2.5000 2,950.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) PROGRAM CAS145 PAGE 5 DATE 04/25/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1F1704 TIME 07:52 AM ESTIMATE NO. 002 BID OPENING 09/02/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/22 R.E. NAME: TROY SCHEIBER DATE OF THIS ESTIMATE 04/25/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 101 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.3900 6,513.00 11,884.000 4,634.76 11,884.000 4,634 102 12" TRAFFIC STRIPE TAPE WITH CONTRAST LF 2.5000 825.00 0.000 0 (WARRANTY) 103 CONTRAST STRIPE PAINT (1-COAT) LF 4.0000 1,720.00 0.000 0 104 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 3.5000 3,010.00 0.000 0 (WARRANTY) 105 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 4.0000 2,360.00 0.000 0 (WARRANTY) (BROKEN 36-12) 106 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 10,000.0000 10,000.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 107 MODIFYING LIGHTING SYSTEMS LS 126,000.0000 126,000.00 0.000 0 108 MODIFYING SIGNAL AND LIGHTING SYSTEMS LS 88,000.0000 88,000.00 0.000 0 109 MODIFYING FIBER OPTIC CABLE SYSTEMS LS 160,000.0000 160,000.00 0.060 9,600.00 1.000 160,000 110 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 111 TRAFFIC CONTROL SUPERVISOR DAY 800.0000 144,000.00 21.000 16,800.00 28.000 22,400 112 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 113 REMOVE BRIDGE MOUNTED SIGN EA 3,500.0000 10,500.00 1.000 3,500.00 1.000 3,500 PROGRAM CAS145 PAGE 6 DATE 04/25/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1F1704 TIME 07:52 AM ESTIMATE NO. 002 BID OPENING 09/02/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/22 R.E. NAME: TROY SCHEIBER DATE OF THIS ESTIMATE 04/25/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 323,043.29 640,763.91 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 11,990.00 11,990.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 335,033.29 652,753.91 114 MOBILIZATION LS 570,000.0000 570,000.00 0.250 142,500.00 0.750 427,500 ORIGINAL CONTRACT AMOUNT 5,718,762.00 TOTAL WORK COMPLETED 477,533.29 1,080,253.91 MATERIALS ON HAND ON SITE 269,793.00 269,793.00 DEDUCTIONS 0.00 0.00 TOTAL 747,326.29 1,350,046.91 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 11/30/21 200 00/00/00 00/00/00 12/27/22 29 32 0 0 19% 15% PROGRESS IS SATISFACTORY TROY SCHEIBER RESIDENT ENGINEER