PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/03/17 EST. NO. 006 TIME 02:54 PM R.E. NAME: HASSAN JAKHAR 10-1F2404 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0018 535.96 E.W. @ F.A.(+) 051717 N 0001.2 0019 304.73 051817 N 0002.2 0020 285.97 053117 N 0003.2 0022 814.63 061217 N 0005.2 0023 815.79 061317 N 0006.2 0024 837.06 061417 N 0007.2 0025 863.17 061517 N 0008.2 0026 448.16 082417 N 0011.0 4,905.47 TOTAL THIS ESTIMATE 5,604.10 TOTAL PREVIOUS ESTIMATE 10,509.57 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/03/17 EST. NO. 006 TIME 02:54 PM R.E. NAME: HASSAN JAKHAR 10-1F2404 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION MISSING PAYROLLS -2,000.00 003 MISS PAYROLLS -10,000.00 005 0.00 -12,000.00 TOTAL DEDUCTIONS 0.00 -12,000.00 PROGRAM CAS145 PAGE 1 DATE 10/03/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1F2404 TIME 02:54 PM ESTIMATE NO. 006 BID OPENING 02/01/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/25/17 R.E. NAME: HASSAN JAKHAR DATE OF THIS ESTIMATE 10/03/17 LOCATION SEMI-FINAL ESTIMATE 10-STA-132-R2.4/R2.4 ------------------- MYERS AND SONS CONSTRUCTION, IN STANISLAUS COUNTY NEAR VERNALIS LP AT SAN JOAQUIN RIVER BRIDGE 4600 NORTHGATE BLVD SUITE 100 SACRAMENTO CA 95834 FED. AID NO. N O N E TREAT BRIDGE DECK AND REPLACE JOINT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,000.0000 2,000.00 1.000 2,000 002 CONSTRUCTION AREA SIGNS LS 3,000.0000 3,000.00 1.000 3,000 003 TRAFFIC CONTROL SYSTEM LS 43,000.0000 43,000.00 1.000 43,000 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 5,000.0000 5,000.00 1.000 5,000 005 JOB SITE MANAGEMENT LS 1,500.0000 1,500.00 1.000 1,500 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,000.0000 1,000.00 1.000 1,000 007 ASBESTOS COMPLIANCE PLAN LS 5,500.0000 5,500.00 1.000 5,500 008 ASBESTOS SURVEYING, SAMPLING, AND LS 5,500.0000 5,500.00 1.000 5,500 ANALYSIS 009 RAPID SETTING CONCRETE (PATCH) CF 30.0000 3,870.00 11.000 330 010 REMOVE ASPHALT CONCRETE DIKE LF 5.0000 1,700.00 340.000 1,700 011 REMOVE ASPHALT CONCRETE SURFACING SQFT 0.8500 51,488.75 60,575.000 51,488 012 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 6.0000 7,380.00 1,230.000 7,380 013 REMOVE UNSOUND CONCRETE CF 35.0000 4,515.00 11.000 385 014 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.2000 12,115.00 60,575.000 12,115 015 FURNISH POLYESTER CONCRETE OVERLAY CF 77.0000 397,012.00 6,675.730 514,031 016 PLACE POLYESTER CONCRETE OVERLAY SQFT 1.7000 87,652.00 57,560.000 97,852 (F) 017 TREAT BRIDGE DECK SQFT 0.3500 3,150.00 4,500.000 1,575 (F) 018 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 13.6500 1,365.00 50.000 682 019 BRIDGE REMOVAL (PORTION) LS 22,000.0000 22,000.00 0.770 16,940 020 HOT MIX ASPHALT (TYPE A) TON 285.0000 37,050.00 130.000 37,050 021 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 12.3000 4,182.00 343.000 4,218 022 TACK COAT TON 300.0000 120.00 0.400 120 PROGRAM CAS145 PAGE 2 DATE 10/03/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1F2404 TIME 02:54 PM ESTIMATE NO. 006 BID OPENING 02/01/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/25/17 R.E. NAME: HASSAN JAKHAR DATE OF THIS ESTIMATE 10/03/17 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 GRIND EXISTING BRIDGE DECK SQYD 23.0000 7,682.00 334.000 7,682 024 TEMPORARY DECKING LS 4,000.0000 4,000.00 1.000 4,000.00 1.000 4,000 025 STRUCTURAL CONCRETE, BRIDGE CY 3,150.0000 6,300.00 0.730 2,299 (F) 026 CLEAN EXPANSION JOINT LF 11.5000 2,783.00 242.000 2,783 027 JOINT SEAL (MR 1 1/2") LF 87.0000 10,266.00 118.000 10,266 028 JOINT SEAL (MR 2") LF 99.0000 12,276.00 124.000 12,276 029 CLEAN EXISTING SCUPPERS EA 419.0000 3,352.00 8.000 3,352 030 4" AUDIBLE TRAFFIC STRIPE SYSTEMS LF 1.6500 11,517.00 6,960.000 11,484 031 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.5000 675.00 144.000 648 PROGRAM CAS145 PAGE 3 DATE 10/03/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1F2404 TIME 02:54 PM ESTIMATE NO. 006 BID OPENING 02/01/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/25/17 R.E. NAME: HASSAN JAKHAR DATE OF THIS ESTIMATE 10/03/17 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 4,000.00 867,158.86 ADJUSTMENT OF COMPENSATION 0.00 5,604.10 EXTRA WORK 4,905.47 4,905.47 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 8,905.47 877,668.43 032 MOBILIZATION LS 75,000.0000 75,000.00 1.000 75,000 ORIGINAL CONTRACT AMOUNT 833,950.75 TOTAL WORK COMPLETED 8,905.47 952,668.43 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 -12,000.00 TOTAL 8,905.47 940,668.43 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/06/17 70 05/17/17 05/17/17 08/25/17 29 41 0 0 100% 100% HASSAN JAKHAR RESIDENT ENGINEER PROGRAM CAS145 DATE 10/03/17