PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 01/23/24 EST. NO. 006 TIME 02:28 PM R.E. NAME: CHRIS HANSON 10-1F4004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 01/23/24 EST. NO. 006 TIME 02:28 PM R.E. NAME: CHRIS HANSON 10-1F4004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE MISSING WPCP 4 WEEKS -40,000.00 002 SWPPP 40,000.00 004 0.00 0.00 TOTAL DEDUCTIONS 0.00 0.00 PROGRAM CAS145 PAGE 1 DATE 01/23/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1F4004 TIME 02:28 PM ESTIMATE NO. 006 BID OPENING 11/09/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/24 R.E. NAME: CHRIS HANSON DATE OF THIS ESTIMATE 01/23/24 LOCATION RERUN PROGRESS ESTIMATE 10-VAR ----------------------- TENNYSON ELECTRIC INC. SAN JOAQUIN COUNTY AT VARIOUS LOCATIONS 7275 NATIONAL DR STE A2 LIVERMORE CA 94550 FED. AID NO. N O N E INSTALL CMSS, CCTV, TMSS, VCS, RWIS AND FO ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 4,500.0000 4,500.00 1.000 4,500 002 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS 15,000.0000 15,000.00 0.060 900.00 0.580 8,700 003 TIME-RELATED OVERHEAD (WDAY) WDAY 450.0000 58,500.00 7.000 3,150.00 75.000 33,750 004 DISPUTE RESOLUTION ADVISOR ON-SITE EA 2,000.0000 8,000.00 0.000 0 MEETING 005 HOURLY OFF-SITE HR 200.0000 2,000.00 0.000 0 DISPUTE-RESOLUTION-ADVISOR-RELATED TASKS 006 CONSTRUCTION AREA SIGNS LS 35,000.0000 35,000.00 0.010 350.00 0.460 16,100 007 TRAFFIC CONTROL SYSTEM LS 585,000.0000 585,000.00 0.060 35,100.00 0.580 339,300 008 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 1,500.0000 30,000.00 0.000 0 009 TYPE III BARRICADE EA 250.0000 1,500.00 0.000 0 010 CHANNELIZER (SURFACE MOUNTED) EA 55.0000 605.00 7.000 385 011 PORTABLE DELINEATOR EA 50.0000 2,200.00 0.000 0 012 TEMPORARY BARRIER SYSTEM LF 65.0000 71,500.00 1,100.000 71,500 013 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 25,000.0000 25,000.00 0.060 1,500.00 0.580 14,500 014 TEMPORARY CRASH CUSHION MODULE EA 275.0000 3,850.00 14.000 3,850 015 ALTERNATIVE TEMPORARY CRASH CUSHION EA 5,000.0000 10,000.00 2.000 10,000 016 JOB SITE MANAGEMENT LS 65,000.0000 65,000.00 0.060 3,900.00 0.580 37,700 017 PREPARE WATER POLLUTION CONTROL PROGRAM LS 5,000.0000 5,000.00 0.750 3,750 018 TEMPORARY DRAINAGE INLET PROTECTION EA 350.0000 26,950.00 0.000 0 019 TEMPORARY FIBER ROLL LF 11.0000 27,500.00 0.000 0 020 TEMPORARY SILT FENCE LF 20.0000 8,600.00 0.000 0 021 STREET SWEEPING LS 25,000.0000 25,000.00 0.000 0 022 TEMPORARY CONCRETE WASHOUT LS 6,500.0000 6,500.00 0.480 3,120.00 1.000 6,500 PROGRAM CAS145 PAGE 2 DATE 01/23/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1F4004 TIME 02:28 PM ESTIMATE NO. 006 BID OPENING 11/09/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/24 R.E. NAME: CHRIS HANSON DATE OF THIS ESTIMATE 01/23/24 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 CONTRACTOR-SUPPLIED BIOLOGIST (LS) LS 25,000.0000 25,000.00 0.060 1,500.00 0.580 14,500 024 NATURAL RESOURCE PROTECTION PLAN LS 5,000.0000 5,000.00 1.000 5,000 025 TEMPORARY HIGH-VISIBILITY FENCE LF 20.0000 8,600.00 0.000 0 026 CLEARING AND GRUBBING (LS) LS 46,500.0000 46,500.00 1.000 46,500 027 ROADWAY EXCAVATION CY 300.0000 96,000.00 314.500 94,350 028 IMPORTED BORROW (CY) CY 120.0000 8,520.00 70.600 8,472 029 CHECK AND TEST EXISTING IRRIGATION LS 2,500.0000 2,500.00 1.000 2,500 FACILITIES 030 OPERATE EXISTING IRRIGATION FACILITIES LS 10,000.0000 10,000.00 0.060 600.00 0.580 5,800 031 CONTROL AND NEUTRAL CONDUCTORS LS 15,000.0000 15,000.00 1.000 15,000 (ARMOR-CLAD) 032 1" REMOTE CONTROL VALVE EA 1,000.0000 1,000.00 1.000 1,000 033 3" GATE VALVE EA 1,000.0000 1,000.00 1.000 1,000 034 3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LF 10.0000 500.00 50.000 500 (F) LINE) 035 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LF 15.0000 2,100.00 140.000 2,100 (F) LINE) 036 3" PLASTIC PIPE (CLASS 315) (SUPPLY LF 30.0000 1,500.00 50.000 1,500 (F) LINE) 037 BALL VALVE EA 1,000.0000 1,000.00 1.000 1,000 038 8" WELDED STEEL PIPE CONDUIT LF 500.0000 15,000.00 30.000 15,000 039 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 650.0000 2,600.00 0.000 0 040 COMPOST (CY) CY 400.0000 64,000.00 0.000 0 041 CLASS 2 AGGREGATE BASE (CY) CY 175.0000 17,500.00 100.000 17,500 042 HOT MIX ASPHALT (TYPE A) TON 275.0000 38,500.00 110.000 30,250 043 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 35.0000 2,800.00 0.000 0 044 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 35.0000 5,950.00 0.000 0 045 TACK COAT TON 100.0000 10.00 0.000 0 046 JOINTED PLAIN CONCRETE PAVEMENT CY 1,300.0000 234,000.00 174.200 226,460 047 60" CAST-IN-DRILLED-HOLE CONCRETE PILE LF 2,250.0000 198,000.00 88.000 198,000 (SIGN FOUNDATION) 048 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 049 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 01/23/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1F4004 TIME 02:28 PM ESTIMATE NO. 006 BID OPENING 11/09/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/24 R.E. NAME: CHRIS HANSON DATE OF THIS ESTIMATE 01/23/24 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 CONCRETE BACKFILL (PIPE TRENCH) CY 400.0000 4,800.00 12.000 4,800 (F) 051 12" REINFORCED CONCRETE PIPE LF 150.0000 25,500.00 163.000 24,450 052 12" CONCRETE FLARED END SECTION EA 1,100.0000 2,200.00 2.000 2,200.00 2.000 2,200 053 CULVERT SLURRY-CEMENT BACKFILL CY 650.0000 4,550.00 0.000 0 054 MINOR CONCRETE (DIKE) CY 6,500.0000 10,400.00 1.610 10,465 055 MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 60.0000 40,200.00 662.500 39,750 056 MIDWEST GUARDRAIL SYSTEM (8' STEEL POST) LF 72.0000 10,800.00 150.000 10,800 057 VEGETATION CONTROL (MINOR CONCRETE) SQYD 125.0000 52,500.00 0.000 0 058 END ANCHOR ASSEMBLY (TYPE SFT-M) EA 2,650.0000 10,600.00 4.000 10,600 059 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 5,500.0000 16,500.00 3.000 16,500 060 ALTERNATIVE CRASH CUSHION SYSTEM EA 45,000.0000 45,000.00 1.000 45,000 061 CONCRETE BARRIER (TYPE 60M) LF 200.0000 28,000.00 140.000 28,000 062 CONCRETE BARRIER (TYPE 60MC) LF 425.0000 178,500.00 420.000 178,500 063 CONCRETE BARRIER TRANSITION LF 2,000.0000 8,400.00 4.200 8,400 (F) 064 REMOVE GUARDRAIL LF 10.0000 3,500.00 350.000 3,500 065 REMOVE CONCRETE BARRIER LF 750.0000 4,500.00 5.500 4,125 066 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 8,500.0000 8,500.00 0.060 510.00 0.580 4,930 SYSTEM ELEMENTS DURING CONSTRUCTION 067 ROADSIDE WEATHER INFORMATION SYSTEM LS 125,000.0000 125,000.00 0.120 15,000.00 0.120 15,000 068 TRAFFIC MONITORING STATION SYSTEM LS 765,000.0000 765,000.00 0.400 306,000 069 CHANGEABLE MESSAGE SIGN SYSTEM LS 625,000.0000 625,000.00 0.020 12,500.00 0.550 343,750 070 CAMERA SYSTEMS LS 225,000.0000 225,000.00 0.040 9,000.00 0.420 94,500 071 FIBER OPTIC CABLE SYSTEMS LS 4,165,500.0000 4,165,500.00 0.150 624,825.00 0.720 2,999,160 072 REMOVING TRAFFIC MONITORING STATIONS LS 60,000.0000 60,000.00 0.000 0 073 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 074 FURNISH SIGN STRUCTURE (VERSATILE TRUSS) LB 8.0000 480,000.00 0.000 0 075 INSTALL SIGN STRUCTURE (VERSATILE TRUSS) LB 1.0000 60,000.00 0.000 0 076 ALUMINUM WALKWAY GRATING (VERSATILE SQFT 60.0000 49,800.00 0.000 0 TRUSS) PROGRAM CAS145 PAGE 4 DATE 01/23/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1F4004 TIME 02:28 PM ESTIMATE NO. 006 BID OPENING 11/09/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/24 R.E. NAME: CHRIS HANSON DATE OF THIS ESTIMATE 01/23/24 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 714,155.00 5,387,397.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 714,155.00 5,387,397.00 077 MOBILIZATION LS 565,000.0000 565,000.00 1.000 565,000 ORIGINAL CONTRACT AMOUNT 9,394,535.00 TOTAL WORK COMPLETED 714,155.00 5,952,397.00 MATERIALS ON HAND ON SITE 257,807.00 257,807.00 DEDUCTIONS 0.00 0.00 TOTAL 971,962.00 6,210,204.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 03/03/23 130 07/05/23 08/14/23 04/09/24 75 60 0 0 63% 58% PROGRESS IS SATISFACTORY CHRIS HANSON RESIDENT ENGINEER