PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/25/21 EST. NO. 004 TIME 09:24 AM R.E. NAME: PAWAN GARG 10-1F8304 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/25/21 EST. NO. 004 TIME 09:24 AM R.E. NAME: PAWAN GARG 10-1F8304 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE FAILED STRIPING -2,000.00 001 RELEASE FAILED STRIP 2,000.00 004 2,000.00 0.00 TOTAL DEDUCTIONS 2,000.00 0.00 PROGRAM CAS145 PAGE 1 DATE 05/25/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1F8304 TIME 09:24 AM ESTIMATE NO. 004 BID OPENING 10/29/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/21 R.E. NAME: PAWAN GARG DATE OF THIS ESTIMATE 05/25/21 LOCATION PROGRESS ESTIMATE 10-AMA-49-4.0/4.2 ----------------- SERAFIX ENGINEERING STATE ROUTE (SR) 49 BETWEEN PM 4.0 CONTRACTORS, INC TO PM 4.206, AND SR-88 BETWEEN PM 7 CROW CANYON COURT SUITE 250 14.292 TO PM 14.360 IN THE CITY OF SAN RAMON CA 94583 JACKSON, IN AMADOR COUNTY. FED. AID NO. N O N E INSTALL/UPGRADE CURB RAMPS, ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,000.0000 2,000.00 1.000 2,000 002 TIME-RELATED OVERHEAD (WDAY) WDAY 2,000.0000 180,000.00 22.000 44,000.00 62.000 124,000 003 CONSTRUCTION AREA SIGNS LS 10,000.0000 10,000.00 0.750 7,500 004 TRAFFIC CONTROL SYSTEM LS 90,000.0000 90,000.00 0.244 21,960.00 0.694 62,460 005 TEMPORARY TRAFFIC STRIPE (TAPE) LF 2.0000 24,400.00 5,835.000 11,670 006 TEMPORARY PAVEMENT MARKING (TAPE) SQFT 16.0000 8,640.00 282.000 4,512 007 CHANNELIZER (SURFACE MOUNTED) EA 50.0000 800.00 16.000 800 008 TEMPORARY PEDESTRIAN ACCESS ROUTE LS 6,500.0000 6,500.00 0.240 1,560.00 0.680 4,420 009 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 12,000.0000 12,000.00 0.240 2,880.00 0.690 8,280 010 TEMPORARY RAILING (TYPE K) LF 60.0000 40,800.00 360.000 21,600.00 680.000 40,800 011 ALTERNATIVE TEMPORARY CRASH EA 5,000.0000 10,000.00 1.000 5,000.00 4.000 20,000 CUSHION 012 JOB SITE MANAGEMENT LS 5,000.0000 5,000.00 0.450 2,250.00 0.690 3,450 013 PREPARE WATER POLLUTION CONTROL PROGRAM LS 2,500.0000 2,500.00 0.750 1,875 014 TEMPORARY DRAINAGE INLET PROTECTION EA 500.0000 4,500.00 9.000 4,500 015 TEMPORARY CONCRETE WASHOUT LS 3,000.0000 3,000.00 0.240 720.00 0.630 1,890 016 REMOVE CONCRETE (CY) CY 700.0000 33,600.00 15.500 10,850.00 39.600 27,720 017 TEMPORARY HIGH-VISIBILITY FENCE LF 8.0000 1,760.00 20.000 160.00 133.000 1,064 018 CLEARING AND GRUBBING (LS) LS 10,000.0000 10,000.00 0.500 5,000.00 1.000 10,000 019 ROADWAY EXCAVATION CY 350.0000 23,100.00 0.600 210.00 65.300 22,855 020 WOOD MULCH CY 300.0000 600.00 0.000 0 021 BONDED FIBER MATRIX (SQFT) SQFT 1.0000 1,660.00 0.000 0 022 FIBER ROLLS LF 10.0000 1,500.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 05/25/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1F8304 TIME 09:24 AM ESTIMATE NO. 004 BID OPENING 10/29/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/21 R.E. NAME: PAWAN GARG DATE OF THIS ESTIMATE 05/25/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 COMPOST (CY) CY 500.0000 650.00 0.000 0 024 REPLACE ASPHALT CONCRETE SURFACING CY 900.0000 37,800.00 17.280 15,552.00 32.980 29,682 025 HOT MIX ASPHALT (TYPE A) TON 1,500.0000 6,900.00 5.510 8,265.00 5.510 8,265 026 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 260.0000 5,200.00 9.000 2,340.00 9.000 2,340 027 REMOVE ASPHALT CONCRETE DIKE LF 20.0000 500.00 25.000 500.00 25.000 500 028 GRIND EXISTING CONCRETE SQYD 1,000.0000 1,000.00 0.500 500.00 1.000 1,000 PAVEMENT 029 GRIND EXISTING BRIDGE DECK SQYD 225.0000 2,700.00 6.000 1,350.00 12.000 2,700 030 STRUCTURAL CONCRETE, BRIDGE CY 3,500.0000 17,500.00 2.500 8,750.00 5.000 17,500 (F) 031 STRUCTURAL CONCRETE, BARRIER SLAB CY 1,500.0000 105,000.00 35.500 53,250.00 70.000 105,000 (F) 032 DRILL AND BOND DOWEL LF 50.0000 3,050.00 33.000 1,650.00 65.500 3,275 033 BAR REINFORCING STEEL (EPOXY COATED) LB 4.0000 5,920.00 740.000 2,960.00 1,480.000 5,920 (F) (BRIDGE) 034 SPOT BLAST CLEAN AND PAINT UNDERCOAT SQFT 900.0000 9,900.00 0.000 0 035 CLEAN AND PAINT BRIDGE RAILING LS 30,000.0000 30,000.00 0.000 0 036 PUBLIC SAFETY PLAN LS 5,000.0000 5,000.00 0.244 1,220.00 0.704 3,520 037 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 15.0000 1,920.00 64.000 960 038 FURNISH POLYESTER CONCRETE OVERLAY CF 150.0000 3,150.00 10.500 1,575 039 PLACE POLYESTER CONCRETE OVERLAY SQFT 150.0000 19,200.00 64.000 9,600 (F) 040 BRIDGE REMOVAL (PORTION), LOCATION A LS 15,000.0000 15,000.00 0.500 7,500.00 1.000 15,000 041 BRIDGE REMOVAL (PORTION), LOCATION B LS 15,000.0000 15,000.00 0.500 7,500.00 1.000 15,000 042 BRIDGE REMOVAL (PORTION), LOCATION C LS 15,000.0000 15,000.00 1.000 15,000 043 ADJUST INLET EA 3,000.0000 3,000.00 1.000 3,000 044 DETECTABLE WARNING SURFACE SQFT 60.0000 13,680.00 149.000 8,940.00 228.000 13,680 045 MINOR CONCRETE (MISCELLANEOUS CY 850.0000 82,450.00 67.700 57,545.00 80.700 68,595 CONSTRUCTION) 046 PRE/POST CONSTRUCTION SURVEYS EA 8,000.0000 16,000.00 0.500 4,000 047 PREPARE AND STAIN CONCRETE SQFT 55.0000 25,025.00 0.000 0 048 REMOVE PAVEMENT MARKER EA 2.0000 1,320.00 126.000 252 049 PAVEMENT MARKER (RETROREFLECTIVE) EA 10.0000 6,600.00 126.000 1,260 PROGRAM CAS145 PAGE 3 DATE 05/25/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1F8304 TIME 09:24 AM ESTIMATE NO. 004 BID OPENING 10/29/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/21 R.E. NAME: PAWAN GARG DATE OF THIS ESTIMATE 05/25/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 CONCRETE BARRIER LF 14.0000 2,394.00 49.000 686 051 RECONSTRUCT METAL RAILING (BRIDGE) LF 1.0000 171.00 31.000 31 052 THERMOPLASTIC PAVEMENT MARKING SQFT 1.0000 410.00 0.000 0 053 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.5000 585.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3) 054 6" THERMOPLASTIC TRAFFIC STRIPE LF 3.0000 13,050.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 055 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.5000 6,765.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 056 8" THERMOPLASTIC TRAFFIC STRIPE LF 6.0000 1,080.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 057 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 5,300.00 3,763.000 3,763 058 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 8.0000 3,680.00 336.000 2,688 059 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 3,000.0000 3,000.00 0.240 720.00 0.690 2,070 SYSTEM ELEMENTS DURING CONSTRUCTION 060 MODIFYING SIGNAL AND LIGHTING SYSTEMS LS 25,000.0000 25,000.00 0.700 17,500 PROGRAM CAS145 PAGE 4 DATE 05/25/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1F8304 TIME 09:24 AM ESTIMATE NO. 004 BID OPENING 10/29/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/21 R.E. NAME: PAWAN GARG DATE OF THIS ESTIMATE 05/25/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 294,732.00 714,158.00 ADJUSTMENT OF COMPENSATION 0.00 -2,040.00 EXTRA WORK 0.00 23,200.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 294,732.00 735,318.00 061 MOBILIZATION LS 100,000.0000 100,000.00 0.050 5,000.00 1.000 100,000 ORIGINAL CONTRACT AMOUNT 1,082,260.00 TOTAL WORK COMPLETED 299,732.00 835,318.00 MATERIALS ON HAND ON SITE -8,097.98 0.00 DEDUCTIONS 2,000.00 0.00 TOTAL 293,634.02 835,318.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/02/20 90 02/08/21 02/08/21 06/30/21 62 9 0 0 74% 69% PROGRESS IS SATISFACTORY PAWAN GARG RESIDENT ENGINEER PROGRAM CAS145 DATE 05/25/21