PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 12/19/25 EST. NO. 010 TIME 04:36 PM R.E. NAME: DAVID ABLEDU 10-1F9604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 12/19/25 EST. NO. 010 TIME 04:36 PM R.E. NAME: DAVID ABLEDU 10-1F9604 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE B2GNOW-NON COMPLIANC -20,000.00 005 EST.5 RELSE PARTIAL 10,000.00 006 EST.5, B2GNOW COMPL 10,000.00 007 B2GNOW NONCOMPLIANCE -20,000.00 010 -20,000.00 -20,000.00 LABOR COMPLIANCE VIOLATION MISSING PAYROLL -10,000.00 006 EST6 RCVD PAYROLL 10,000.00 008 MISSING PAYROLL -10,000.00 008 EST.8, RCVD PAYROLL 10,000.00 009 0.00 0.00 TOTAL DEDUCTIONS -20,000.00 -20,000.00 PROGRAM CAS145 PAGE 1 DATE 12/19/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1F9604 TIME 04:36 PM ESTIMATE NO. 010 BID OPENING 10/29/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/25 R.E. NAME: DAVID ABLEDU DATE OF THIS ESTIMATE 12/19/25 LOCATION PROGRESS ESTIMATE 10-VAR ----------------- STUDEBAKER ELECTRIC, INC. SAN JOAQUIN COUNTY AT VARIOUS LOCATIONS 3237 RIPPEY ROAD, STE 100 LOOMIS CA 95650 FED. AID NO. N O N E INSTALL FIBER OPTIC SYSTEM & MODIFY INTELL ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 3,600.0000 3,600.00 1.000 3,600 002 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS 24,000.0000 24,000.00 0.050 1,200.00 0.750 18,000 003 TIME-RELATED OVERHEAD (WDAY) WDAY 3,512.0000 719,960.00 20.000 70,240.00 148.000 519,776 004 DISPUTE RESOLUTION ADVISOR ON-SITE EA 2,000.0000 12,000.00 1.000 2,000.00 3.000 6,000 MEETING 005 HOURLY OFF-SITE HR 200.0000 2,000.00 1.500 300.00 10.000 2,000 DISPUTE-RESOLUTION-ADVISOR-RELATED TASKS 006 CONSTRUCTION AREA SIGNS LS 40,800.0000 40,800.00 0.750 30,600 007 TRAFFIC CONTROL SYSTEM LS 426,600.0000 426,600.00 0.200 85,320.00 0.780 332,748 008 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 2,222.0000 59,994.00 20.000 44,440 009 PORTABLE RADAR SPEED FEEDBACK SIGN DAY 21.5000 6,020.00 5.000 107.50 210.000 4,515 SYSTEM 010 TEMPORARY PEDESTRIAN ACCESS ROUTE LS 7,200.0000 7,200.00 0.000 0 011 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 7,100.0000 7,100.00 0.090 639.00 0.790 5,609 012 JOB SITE MANAGEMENT LS 9,600.0000 9,600.00 0.090 864.00 0.790 7,584 013 WATER POLLUTION CONTROL PROGRAM LS 2,400.0000 2,400.00 1.000 2,400 014 STREET SWEEPING LS 6,000.0000 6,000.00 0.900 5,400 015 TEMPORARY CONCRETE WASHOUT LS 2,400.0000 2,400.00 1.000 2,400 016 BIRD EXCLUSION DEVICES LS 9,600.0000 9,600.00 0.000 0 017 TEMPORARY HIGH-VISIBILITY FENCE LF 5.1000 7,650.00 0.000 0 018 DRY SEED (SQFT) SQFT 0.2400 11,736.00 0.000 0 019 FIBER ROLLS LF 7.8000 70,200.00 0.000 0 020 COMPOST (CY) CY 152.4000 24,384.00 0.000 0 021 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 3,000.0000 3,000.00 0.090 270.00 0.590 1,770 SYSTEM ELEMENTS DURING CONSTRUCTION 022 TRAFFIC MONITORING STATION SYSTEM LS 872,400.0000 872,400.00 0.070 61,068.00 0.970 846,228 PROGRAM CAS145 PAGE 2 DATE 12/19/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1F9604 TIME 04:36 PM ESTIMATE NO. 010 BID OPENING 10/29/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/25 R.E. NAME: DAVID ABLEDU DATE OF THIS ESTIMATE 12/19/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 MODIFYING ROADSIDE WEATHER INFORMATION LS 333,500.0000 333,500.00 0.900 300,150 SYSTEMS 024 CAMERA SYSTEMS LS 228,250.0000 228,250.00 0.430 98,147 025 FIBER OPTIC CABLE SYSTEMS LS 2,207,000.0000 2,207,000.00 0.020 44,140.00 0.702 1,549,314 026 MODIFYING CAMERA SYSTEMS LS 391,300.0000 391,300.00 0.150 58,695.00 0.280 109,564 027 MODIFYING SIGNAL AND LIGHTING SYSTEMS LS 179,240.0000 179,240.00 0.250 44,810.00 0.681 122,062 028 MODIFYING TRAFFIC MONITORING STATIONS LS 476,800.0000 476,800.00 0.090 42,912.00 0.800 381,440 PROGRAM CAS145 PAGE 3 DATE 12/19/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1F9604 TIME 04:36 PM ESTIMATE NO. 010 BID OPENING 10/29/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/25 R.E. NAME: DAVID ABLEDU DATE OF THIS ESTIMATE 12/19/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 412,565.50 4,393,747.94 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 71,988.29 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 412,565.50 4,465,736.23 029 MOBILIZATION LS 154,000.0000 154,000.00 1.000 154,000 ORIGINAL CONTRACT AMOUNT 6,298,734.00 TOTAL WORK COMPLETED 412,565.50 4,619,736.23 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS -20,000.00 -20,000.00 TOTAL 392,565.50 4,599,736.23 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 01/24/25 205 03/24/25 03/24/25 02/17/26 143 46 0 0 72% 70% PROGRESS IS SATISFACTORY DAVID ABLEDU RESIDENT ENGINEER