PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/23/18 EST. NO. 001 TIME 02:30 PM R.E. NAME: MUHAMMAD RAHMAN 10-1G7704 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/23/18 EST. NO. 001 TIME 02:30 PM R.E. NAME: MUHAMMAD RAHMAN 10-1G7704 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 07/23/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1G7704 TIME 02:30 PM ESTIMATE NO. 001 BID OPENING 10/18/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/18 R.E. NAME: MUHAMMAD RAHMAN DATE OF THIS ESTIMATE 07/23/18 LOCATION RERUN PROGRESS ESTIMATE 10-MER-33-R13.2/26.5 ----------------------- GRANITE CONSTRUCTION COMPANY IN MERCED COUNTY AT AND NEAR SANTA . NELLA FROM ROUTE 152/33 SEPARATION 2716 S. GRANITE COURT TO SOUTH JUNCTION ROUTE FRESNO CA 93706 140/SULLIVAN ROAD FED. AID NO. N O N E SLURRY SEAL, HMA, AND RHMA OVERLAY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 3,500.0000 3,500.00 0.500 1,750.00 0.500 1,750 002 CONSTRUCTION AREA SIGNS LS 8,400.0000 8,400.00 0.490 4,116.00 0.490 4,116 003 TRAFFIC CONTROL SYSTEM LS 375,000.0000 375,000.00 0.240 90,000.00 0.240 90,000 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 10,000.0000 10,000.00 0.240 2,400.00 0.240 2,400 005 JOB SITE MANAGEMENT LS 18,000.0000 18,000.00 0.240 4,320.00 0.240 4,320 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,000.0000 1,000.00 0.500 500.00 0.500 500 007 TEMPORARY CONCRETE WASHOUT LS 100.0000 100.00 0.000 0 008 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 1.0000 9,550.00 9,547.000 9,547.00 9,547.000 9,547 STRIPE (HAZARDOUS WASTE) 009 SHOULDER BACKING TON 55.0000 161,700.00 0.000 0 010 SLURRY SEAL TON 145.0000 89,900.00 0.000 0 011 PREPAVING INERTIAL PROFILER LS 750.0000 750.00 1.000 750.00 1.000 750 012 PREPAVING GRINDING DAY EA 8,700.0000 87,000.00 10.000 87,000.00 10.000 87,000 013 HOT MIX ASPHALT (TYPE A) TON 102.0000 782,340.00 617.670 63,002.34 617.670 63,002 014 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 81.0000 782,460.00 0.000 0 015 DATA CORE LS 5,000.0000 5,000.00 0.000 0 016 TACK COAT TON 520.0000 26,520.00 0.000 0 017 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 3.0000 158,700.00 9,142.220 27,426.66 9,142.220 27,426 018 SURVEY MONUMENT (TYPE D) EA 1,300.0000 6,500.00 0.000 0 019 ADJUST MONUMENT COVER TO GRADE EA 1,300.0000 10,400.00 0.000 0 020 REMOVE PAVEMENT MARKER EA 2.0000 6,500.00 2,452.000 4,904.00 2,452.000 4,904 021 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.0000 9,750.00 0.000 0 022 THERMOPLASTIC PAVEMENT MARKING SQFT 4.5000 10,395.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 07/23/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1G7704 TIME 02:30 PM ESTIMATE NO. 001 BID OPENING 10/18/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/18 R.E. NAME: MUHAMMAD RAHMAN DATE OF THIS ESTIMATE 07/23/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 THERMOPLASTIC TRAFFIC STRIPE LF 0.2400 49,440.00 0.000 0 (SPRAYABLE) 024 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.8500 3,306.50 0.000 0 025 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 3.0000 5,580.00 0.000 0 026 6" RUMBLE STRIP STA 35.0000 30,450.00 0.000 0 (ASPHALT CONCRETE PAVEMENT) 027 12" RUMBLE STRIP STA 35.0000 15,400.00 0.000 0 (ASPHALT CONCRETE PAVEMENT) 028 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,500.0000 1,500.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 029 MODIFYING EXISTING ELECTRICAL SYSTEM LS 40,000.0000 40,000.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 07/23/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1G7704 TIME 02:30 PM ESTIMATE NO. 001 BID OPENING 10/18/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/18 R.E. NAME: MUHAMMAD RAHMAN DATE OF THIS ESTIMATE 07/23/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 295,716.00 295,716.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 295,716.00 295,716.00 030 MOBILIZATION LS 284,000.5000 284,000.50 0.750 213,000.38 0.750 213,000 ORIGINAL CONTRACT AMOUNT 2,993,142.00 TOTAL WORK COMPLETED 508,716.38 508,716.38 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 508,716.38 508,716.38 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 11/28/17 70 06/25/18 06/25/18 10/04/18 17 2 0 0 17% 24% PROGRESS IS SATISFACTORY MUHAMMAD RAHMAN RESIDENT ENGINEER PROGRAM CAS145 DATE 07/23/18