PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 09/20/19 EST. NO. 001 TIME 10:23 AM R.E. NAME: BAL BAHADUR PAUL 10-1H6204 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 09/20/19 EST. NO. 001 TIME 10:23 AM R.E. NAME: BAL BAHADUR PAUL 10-1H6204 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 09/20/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1H6204 TIME 10:23 AM ESTIMATE NO. 001 BID OPENING 05/07/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/19 R.E. NAME: BAL BAHADUR PAUL DATE OF THIS ESTIMATE 09/20/19 LOCATION PROGRESS ESTIMATE 10-SJ-4-R19.4/19.4 ----------------- 10-SJ-99-2.3/36.7 MYERS & SONS CONSTRUCTION, LLC IN SAN JOAQUIN COUNTY ON ROUTE 99 4600 NORTHGATE BLVD, STE 100 FROM JACK TONE ROAD IN RIPON AND TO SACRAMENTO CA 95834 COLLIER ROAD IN LODI FED. AID NO. N O N E BRIDGE RAILING REPAIR ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,500.0000 1,500.00 1.000 1,500.00 1.000 1,500 002 CONSTRUCTION AREA SIGNS LS 10,000.0000 10,000.00 0.500 5,000.00 0.500 5,000 003 TRAFFIC CONTROL SYSTEM LS 140,000.0000 140,000.00 0.140 19,600.00 0.140 19,600 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 18,000.0000 18,000.00 0.140 2,520.00 0.140 2,520 005 JOB SITE MANAGEMENT LS 2,500.0000 2,500.00 0.140 350.00 0.140 350 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,000.0000 1,000.00 0.500 500.00 0.500 500 007 TEMPORARY CONCRETE WASHOUT LS 2,500.0000 2,500.00 0.000 0 008 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 1.0000 3,840.00 0.000 0 STRIPE (HAZARDOUS WASTE) 009 HOT MIX ASPHALT (TYPE A) TON 1,300.0000 74,100.00 0.000 0 010 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 235.0000 7,050.00 0.000 0 011 TACK COAT TON 1,800.0000 360.00 0.000 0 012 REMOVE ASPHALT CONCRETE DIKE LF 20.0000 600.00 0.000 0 013 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 38.0000 19,760.00 240.000 9,120.00 240.000 9,120 014 DRILL AND BOND (DOWEL BAR) EA 68.0000 4,352.00 0.000 0 015 INDIVIDUAL SLAB REPLACEMENT (RSC) CY 1,320.0000 126,720.00 0.000 0 016 GRIND EXISTING CONCRETE SQYD 197.0000 15,760.00 0.000 0 PAVEMENT 017 STRUCTURAL CONCRETE, BRIDGE CY 12,000.0000 14,400.00 0.000 0 (F) 018 STRUCTURAL CONCRETE, APPROACH SLAB CY 1,280.0000 482,560.00 0.000 0 (TYPE R) 019 CLEAN EXPANSION JOINT LF 50.0000 16,450.00 0.000 0 020 JOINT SEAL (MR 1/2") LF 42.0000 7,350.00 0.000 0 021 JOINT SEAL (MR 1") LF 70.0000 17,920.00 0.000 0 022 JOINT SEAL (MR 2") LF 155.0000 16,120.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 09/20/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1H6204 TIME 10:23 AM ESTIMATE NO. 001 BID OPENING 05/07/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/19 R.E. NAME: BAL BAHADUR PAUL DATE OF THIS ESTIMATE 09/20/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 BAR REINFORCING STEEL (BRIDGE) LB 10.0000 900.00 0.000 0 (F) 024 PUBLIC SAFETY PLAN LS 5,000.0000 5,000.00 0.500 2,500.00 0.500 2,500 025 INJECT CRACK (EPOXY) LF 185.0000 925.00 0.000 0 026 RAPID SETTING CONCRETE (PATCH) CF 200.0000 2,600.00 0.000 0 027 REMOVE ASPHALT CONCRETE SURFACING SQFT 2.1500 31,867.30 14,313.500 30,774.03 14,313.500 30,774 028 REMOVE UNSOUND CONCRETE CF 195.0000 2,535.00 0.000 0 029 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.2500 21,192.75 0.000 0 030 FURNISH POLYESTER CONCRETE OVERLAY CF 99.0000 57,123.00 0.000 0 031 PLACE POLYESTER CONCRETE OVERLAY SQFT 9.5000 54,729.50 0.000 0 (F) 032 TREAT BRIDGE DECK SQFT 0.4000 31,892.00 0.000 0 (F) 033 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 60.0000 53,280.00 0.000 0 034 BRIDGE REMOVAL (PORTION), LOCATION A LS 14,500.0000 14,500.00 0.000 0 035 BRIDGE REMOVAL (PORTION), LOCATION B LS 7,700.0000 7,700.00 0.000 0 036 PREPARE AND STAIN CONCRETE SQFT 125.0000 2,750.00 0.000 0 037 REMOVE PAVEMENT MARKER EA 1.0000 230.00 0.000 0 038 PAVEMENT MARKER (RETROREFLECTIVE) EA 30.0000 6,900.00 0.000 0 039 CONCRETE BARRIER (TYPE 25 MODIFIED) LF 1,000.0000 19,000.00 0.000 0 040 SALVAGE SINGLE THRIE BEAM BARRIER LF 50.0000 1,550.00 0.000 0 041 6" THERMOPLASTIC TRAFFIC STRIPE LF 9.0000 35,640.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 042 THERMOPLASTIC CROSSWALK AND PAVEMENT SQFT 33.0000 5,940.00 0.000 0 MARKING (ENHANCED WET NIGHT VISIBILITY) 043 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 2,560.00 0.000 0 044 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 2.0000 360.00 0.000 0 045 12" RUMBLE STRIP STA 3,334.0000 5,001.00 0.000 0 (ASPHALT CONCRETE PAVEMENT) 046 10" TRAFFIC STRIPE TAPE WITH CONTRAST LF 12.0000 46,080.00 0.000 0 (WARRANTY) 047 10" TRAFFIC STRIPE TAPE WITH CONTRAST LF 12.0000 3,600.00 0.000 0 (BROKEN 36-12)(WARRANTY) 048 10" TRAFFIC STRIPE TAPE WITH CONTRAST LF 12.0000 22,920.00 0.000 0 (BROKEN 17-7)(WARRANTY) 049 12" TRAFFIC STRIPE TAPE WITH CONTRAST LF 15.0000 4,050.00 0.000 0 (BROKEN 12-3)(WARRANTY) PROGRAM CAS145 PAGE 3 DATE 09/20/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1H6204 TIME 10:23 AM ESTIMATE NO. 001 BID OPENING 05/07/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/19 R.E. NAME: BAL BAHADUR PAUL DATE OF THIS ESTIMATE 09/20/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 12" TRAFFIC STRIPE TAPE WITH CONTRAST LF 30.0000 10,500.00 0.000 0 (WARRANTY) 051 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 2,500.0000 2,500.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 4 DATE 09/20/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1H6204 TIME 10:23 AM ESTIMATE NO. 001 BID OPENING 05/07/19 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/19 R.E. NAME: BAL BAHADUR PAUL DATE OF THIS ESTIMATE 09/20/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 71,864.03 71,864.03 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 71,864.03 71,864.03 052 MOBILIZATION LS 140,900.0000 140,900.00 0.500 70,450.00 0.500 70,450 ORIGINAL CONTRACT AMOUNT 1,577,567.55 TOTAL WORK COMPLETED 142,314.03 142,314.03 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 142,314.03 142,314.03 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/15/19 95 09/03/19 09/03/19 01/30/20 15 0 0 0 9% 16% PROGRESS IS SATISFACTORY BAL BAHADUR PAUL RESIDENT ENGINEER PROGRAM CAS145 DATE 09/20/19