PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/25/21 EST. NO. 001 TIME 09:39 AM R.E. NAME: IQBAL AULAKH 10-1J1704 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/25/21 EST. NO. 001 TIME 09:39 AM R.E. NAME: IQBAL AULAKH 10-1J1704 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 05/25/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1J1704 TIME 09:39 AM ESTIMATE NO. 001 BID OPENING 12/17/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/21 R.E. NAME: IQBAL AULAKH DATE OF THIS ESTIMATE 05/25/21 LOCATION PROGRESS ESTIMATE 10-AMA-88-32.3/38.0 ----------------- GEORGE REED, INC IN AMADOR COUNTY AT AND NEAR BARTON 140 EMPIRE AVE FROM 0.4 MILE WEST OF SILVER DRIVE MODESTO CA 95354 TO 0.2 MILE WEST OF SHAKE RIDGE ROAD FED. AID NO. N O N E HOT MIX ASPHALT OVERLAY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 3,000.0000 3,000.00 1.000 3,000.00 1.000 3,000 002 TIME-RELATED OVERHEAD (WDAY) WDAY 250.0000 15,000.00 12.000 3,000.00 12.000 3,000 003 CONSTRUCTION AREA SIGNS LS 6,300.0000 6,300.00 0.500 3,150.00 0.500 3,150 004 TRAFFIC CONTROL SYSTEM LS 160,000.0000 160,000.00 0.200 32,000.00 0.200 32,000 005 PORTABLE RADAR SPEED FEEDBACK SIGN EA 50.0000 3,000.00 0.200 10.00 0.200 10 SYSTEM DAY 006 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 7,500.0000 7,500.00 0.200 1,500.00 0.200 1,500 007 JOB SITE MANAGEMENT LS 2,500.0000 2,500.00 0.200 500.00 0.200 500 008 PREPARE WATER POLLUTION CONTROL PROGRAM LS 650.0000 650.00 0.750 487.50 0.750 487 009 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 0.1500 4,605.00 30,700.000 4,605.00 30,700.000 4,605 STRIPE (HAZARDOUS WASTE) 010 TREATED WOOD WASTE LB 0.5000 90.00 0.000 0 011 SHOULDER BACKING TON 12.0000 39,960.00 0.000 0 012 FULL WIDTH SEGMENT CORRECTION EA 3,500.0000 7,000.00 2.000 7,000.00 2.000 7,000 013 PARTIAL WIDTH SEGMENT CORRECTION EA 3,500.0000 7,000.00 2.000 7,000.00 2.000 7,000 014 HOT MIX ASPHALT (TYPE A) TON 111.0000 1,276,500.00 206.000 22,866.00 206.000 22,866 015 DATA CORE LS 2,000.0000 2,000.00 0.000 0 016 TACK COAT TON 400.0000 15,200.00 0.000 0 017 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 25.0000 83,000.00 4,150.000 103,750.00 4,150.000 103,750 018 DELINEATOR (CLASS 2) EA 45.0000 450.00 0.000 0 019 REMOVE ROADSIDE SIGN (WOOD POST) EA 100.0000 400.00 0.000 0 020 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 20.0000 820.00 0.000 0 (0.063"-UNFRAMED) 021 ROADSIDE SIGN - ONE POST EA 300.0000 1,800.00 0.000 0 022 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 05/25/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1J1704 TIME 09:39 AM ESTIMATE NO. 001 BID OPENING 12/17/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/21 R.E. NAME: IQBAL AULAKH DATE OF THIS ESTIMATE 05/25/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 024 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 025 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 026 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 027 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.1000 6,290.00 62,900.000 6,290.00 62,900.000 6,290 028 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 1.5000 2,040.00 1,360.000 2,040.00 1,360.000 2,040 029 6" RUMBLE STRIP (ASPHALT CONCRETE STA 40.0000 16,400.00 0.000 0 PAVEMENT - SINUSOIDAL) 030 12" RUMBLE STRIP (ASPHALT CONCRETE STA 40.0000 10,800.00 0.000 0 PAVEMENT - SINUSOIDAL) 031 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 032 PAINT TRAFFIC STRIPE (2-COAT) LF 0.3100 28,706.00 0.000 0 033 PAINT PAVEMENT MARKING (2-COAT) SQFT 4.0000 5,440.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 05/25/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1J1704 TIME 09:39 AM ESTIMATE NO. 001 BID OPENING 12/17/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/21 R.E. NAME: IQBAL AULAKH DATE OF THIS ESTIMATE 05/25/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 197,198.50 197,198.50 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 197,198.50 197,198.50 034 MOBILIZATION LS 22,000.0000 22,000.00 0.750 16,500.00 0.750 16,500 ORIGINAL CONTRACT AMOUNT 1,728,451.00 TOTAL WORK COMPLETED 213,698.50 213,698.50 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 213,698.50 213,698.50 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 01/19/21 60 05/03/21 05/03/21 07/27/21 14 0 0 0 12% 23% PROGRESS IS SATISFACTORY IQBAL AULAKH RESIDENT ENGINEER PROGRAM CAS145 DATE 05/25/21