PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/19/24 EST. NO. 001 TIME 10:15 AM R.E. NAME: IQBAL AULAKH 10-1P7304 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/19/24 EST. NO. 001 TIME 10:15 AM R.E. NAME: IQBAL AULAKH 10-1P7304 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 06/19/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1P7304 TIME 10:15 AM ESTIMATE NO. 001 BID OPENING 02/14/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/24 R.E. NAME: IQBAL AULAKH DATE OF THIS ESTIMATE 06/19/24 LOCATION PROGRESS ESTIMATE 10-VAR ----------------- MCCUEN CONSTRUCTION, INC. AMADOR AND EL DORADO COUNTIES AT VARIOUS 3269 SWETZER ROAD LOCATIONS LOOMIS CA 95650 FED. AID NO. N O N E BRIDGE REHABILITATION AND POLYESTER CONCRE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,500.0000 2,500.00 1.000 2,500.00 1.000 2,500 002 TIME-RELATED OVERHEAD (WDAY) WDAY 1,240.0000 62,000.00 9.000 11,160.00 9.000 11,160 003 CONSTRUCTION AREA SIGNS LS 12,500.0000 12,500.00 0.500 6,250.00 0.500 6,250 004 TRAFFIC CONTROL SYSTEM LS 69,456.7000 69,456.70 0.180 12,502.21 0.180 12,502 005 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 387.5000 3,100.00 0.000 0 006 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 4,100.0000 4,100.00 0.000 0 007 JOB SITE MANAGEMENT LS 7,000.0000 7,000.00 0.180 1,260.00 0.180 1,260 008 WATER POLLUTION CONTROL PROGRAM LS 1,000.0000 1,000.00 0.750 750.00 0.750 750 009 TEMPORARY DRAINAGE INLET PROTECTION EA 90.0000 180.00 2.000 180.00 2.000 180 010 STREET SWEEPING LS 5,000.0000 5,000.00 0.180 900.00 0.180 900 011 TEMPORARY CONCRETE WASHOUT LS 1,500.0000 1,500.00 0.000 0 012 ASBESTOS COMPLIANCE PLAN LS 975.0000 975.00 1.000 975.00 1.000 975 013 ASBESTOS SURVEYING, SAMPLING AND LS 9,750.0000 9,750.00 0.000 0 ANALYSIS 014 HOT MIX ASPHALT (TYPE A) TON 1,591.0000 89,096.00 0.000 0 015 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 60.0000 6,000.00 0.000 0 016 TACK COAT TON 2,000.0000 2,000.00 0.000 0 017 REMOVE ASPHALT CONCRETE DIKE LF 10.0000 1,000.00 0.000 0 018 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 18.6000 18,600.00 0.000 0 019 GRIND EXISTING BRIDGE DECK SQYD 6,340.0000 8,876.00 0.000 0 020 CLEAN EXPANSION JOINT LF 62.5100 8,876.42 0.000 0 021 SNOWPLOW DEFLECTOR EA 75.0000 750.00 0.000 0 022 JOINT SEAL (MR 1") LF 95.5000 13,561.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 06/19/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1P7304 TIME 10:15 AM ESTIMATE NO. 001 BID OPENING 02/14/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/24 R.E. NAME: IQBAL AULAKH DATE OF THIS ESTIMATE 06/19/24 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 PUBLIC SAFETY PLAN LS 3,500.0000 3,500.00 0.750 2,625.00 0.750 2,625 024 RAPID SETTING CONCRETE (PATCH) CF 74.0000 10,952.00 20.000 1,480.00 20.000 1,480 025 REPAIR SPALLED SURFACE AREA SQFT 56.0000 896.00 0.000 0 026 REMOVE UNSOUND CONCRETE CF 72.0000 10,656.00 20.000 1,440.00 20.000 1,440 027 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.6700 19,710.06 0.000 0 028 FURNISH POLYESTER CONCRETE OVERLAY CF 89.7100 263,926.82 0.000 0 029 PLACE POLYESTER CONCRETE OVERLAY SQFT 8.0300 236,226.54 0.000 0 (F) 030 GALVANIC ANODES EA 29.3500 4,461.20 0.000 0 031 REMOVE PAVEMENT MARKER EA 15.0000 1,350.00 90.000 1,350.00 90.000 1,350 032 PAVEMENT MARKER (RETROREFLECTIVE) EA 25.0000 2,250.00 0.000 0 033 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 13.0000 247.00 0.000 0 (0.063"-UNFRAMED) 034 ROADSIDE SIGN - ONE POST EA 500.0000 1,000.00 0.000 0 035 6" THERMOPLASTIC TRAFFIC STRIPE LF 7.0000 1,890.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 036 6" THERMOPLASTIC TRAFFIC STRIPE LF 7.0000 19,950.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 037 REMOVE PAINTED TRAFFIC STRIPE LF 3.2500 13,455.00 4,000.000 13,000.00 4,000.000 13,000 038 6" RUMBLE STRIP (ASPHALT CONCRETE STA 4,900.0000 4,900.00 0.000 0 PAVEMENT) 039 12" RUMBLE STRIP (ASPHALT CONCRETE STA 4,900.0000 4,900.00 0.000 0 PAVEMENT) 040 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 24.5000 25,235.00 0.000 0 (WARRANTY) 041 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 10,000.0000 10,000.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 3 DATE 06/19/24 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1P7304 TIME 10:15 AM ESTIMATE NO. 001 BID OPENING 02/14/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/24 R.E. NAME: IQBAL AULAKH DATE OF THIS ESTIMATE 06/19/24 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 56,372.21 56,372.21 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 56,372.21 56,372.21 042 MOBILIZATION LS 99,066.0000 99,066.00 0.500 49,533.00 0.500 49,533 ORIGINAL CONTRACT AMOUNT 1,062,392.74 TOTAL WORK COMPLETED 105,905.21 105,905.21 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 105,905.21 105,905.21 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/10/24 50 06/03/24 06/03/24 09/12/24 9 0 0 0 10% 18% PROGRESS IS SATISFACTORY IQBAL AULAKH RESIDENT ENGINEER