PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 09/02/25 EST. NO. 001 TIME 03:46 PM R.E. NAME: DAVID ABLEDU 10-1R7204 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 09/02/25 EST. NO. 001 TIME 03:46 PM R.E. NAME: DAVID ABLEDU 10-1R7204 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 09/02/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1R7204 TIME 03:46 PM ESTIMATE NO. 001 BID OPENING 03/05/25 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/25 R.E. NAME: DAVID ABLEDU DATE OF THIS ESTIMATE 09/02/25 LOCATION PROGRESS ESTIMATE 10-VAR ----------------- MCCUEN CONSTRUCTION, INC. SAN JOAQUIN COUNTY AT VARIOUS LOCATIONS 3269 SWETZER ROAD LOOMIS CA 95650 FED. AID NO. N O N E PLACE POLYESTER CONCRETE OVERLAY, TRAFFIC ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 3,095.0000 3,095.00 0.500 1,547.50 0.500 1,547 002 TIME-RELATED OVERHEAD (WDAY) WDAY 1,500.0000 150,000.00 33.000 49,500.00 33.000 49,500 003 DISPUTE RESOLUTION ADVISOR ON-SITE EA 2,000.0000 8,000.00 0.000 0 MEETING 004 HOURLY OFF-SITE HR 200.0000 2,000.00 0.000 0 DISPUTE-RESOLUTION-ADVISOR-RELATED TASKS 005 CONSTRUCTION AREA SIGNS LS 8,200.0000 8,200.00 0.750 6,150.00 0.750 6,150 006 TRAFFIC CONTROL SYSTEM LS 220,500.0000 220,500.00 0.000 0 007 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 550.0000 5,500.00 0.000 0 008 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 14,400.0000 14,400.00 0.000 0 009 JOB SITE MANAGEMENT LS 15,000.0000 15,000.00 0.330 4,950.00 0.330 4,950 010 WATER POLLUTION CONTROL PROGRAM LS 750.0000 750.00 0.500 375.00 0.500 375 011 TEMPORARY DRAINAGE INLET PROTECTION EA 150.0000 1,650.00 0.000 0 012 STREET SWEEPING LS 15,000.0000 15,000.00 0.000 0 013 ASBESTOS COMPLIANCE PLAN LS 1,985.0000 1,985.00 0.500 992.50 0.500 992 014 REMOVE YELLOW PAINTED TRAFFIC STRIPE LF 20.0000 9,200.00 0.000 0 (HAZARDOUS WASTE) 015 ASBESTOS SURVEYING, SAMPLING AND LS 13,880.0000 13,880.00 1.000 13,880.00 1.000 13,880 ANALYSIS 016 HOT MIX ASPHALT (TYPE A) TON 305.0000 149,450.00 0.000 0 017 TACK COAT TON 650.0000 1,105.00 0.000 0 018 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 20.0000 71,600.00 0.000 0 019 GRIND EXISTING BRIDGE DECK SQYD 18.1200 31,800.60 0.000 0 020 CLEAN EXPANSION JOINT LF 20.0000 22,200.00 0.000 0 021 JOINT SEAL (MR 1") LF 118.5900 125,231.04 0.000 0 022 JOINT SEAL (MR 2") LF 319.6400 17,260.56 0.000 0 PROGRAM CAS145 PAGE 2 DATE 09/02/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1R7204 TIME 03:46 PM ESTIMATE NO. 001 BID OPENING 03/05/25 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/25 R.E. NAME: DAVID ABLEDU DATE OF THIS ESTIMATE 09/02/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 PUBLIC SAFETY PLAN LS 7,815.0000 7,815.00 0.000 0 024 RAPID SETTING CONCRETE (PATCH) CF 82.0000 29,930.00 0.000 0 025 REMOVE UNSOUND CONCRETE CF 50.0000 18,250.00 0.000 0 026 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.3900 47,034.00 0.000 0 027 FURNISH POLYESTER CONCRETE OVERLAY CF 84.6200 934,458.66 0.000 0 028 PLACE POLYESTER CONCRETE OVERLAY SQFT 3.6600 420,555.96 0.000 0 (F) 029 TREAT BRIDGE DECK SQFT 1.7400 9,907.56 0.000 0 (F) 030 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 138.7500 8,880.00 0.000 0 031 REMOVE CHIP SEAL SQFT 0.5500 11,123.20 0.000 0 032 BRIDGE REMOVAL (PORTION) LS 5,850.0000 5,850.00 0.000 0 033 REMOVE PAVEMENT MARKER EA 4.0000 880.00 0.000 0 034 PAVEMENT MARKER (RETROREFLECTIVE) EA 20.0000 4,400.00 0.000 0 035 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 29.0000 406.00 0.000 0 (0.063"-UNFRAMED) 036 ROADSIDE SIGN - ONE POST EA 850.0000 1,700.00 0.000 0 037 CONCRETE BARRIER (PORTION) LF 3,425.0000 6,850.00 0.000 0 038 6" THERMOPLASTIC TRAFFIC STRIPE LF 5.0000 5,050.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 039 6" THERMOPLASTIC TRAFFIC STRIPE LF 5.0000 5,350.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 040 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 3.0000 20,640.00 0.000 0 041 12" RUMBLE STRIP (ASPHALT CONCRETE STA 3,340.0000 19,038.00 0.000 0 PAVEMENT) 042 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 13.0000 57,980.00 0.000 0 (WARRANTY) 043 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 3.5000 18,935.00 0.000 0 (WARRANTY) (BROKEN 36-12) 044 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 80,000.0000 80,000.00 0.500 40,000.00 0.500 40,000 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 3 DATE 09/02/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-1R7204 TIME 03:46 PM ESTIMATE NO. 001 BID OPENING 03/05/25 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/25 R.E. NAME: DAVID ABLEDU DATE OF THIS ESTIMATE 09/02/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 117,395.00 117,395.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 117,395.00 117,395.00 045 MOBILIZATION LS 259,000.0000 259,000.00 0.750 194,250.00 0.750 194,250 ORIGINAL CONTRACT AMOUNT 2,861,840.58 TOTAL WORK COMPLETED 311,645.00 311,645.00 MATERIALS ON HAND ON SITE 292,293.25 292,293.25 DEDUCTIONS 0.00 0.00 TOTAL 603,938.25 603,938.25 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 05/23/25 100 07/07/25 07/07/25 11/26/25 33 0 0 0 11% 33% PROGRESS IS SATISFACTORY DAVID ABLEDU RESIDENT ENGINEER