PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/22/01 EST. NO.06 TIME 10:50 AM R.E. NAME: MARIO D CASTILLO 10-379404 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/22/01 EST. NO.06 TIME 10:50 AM R.E. NAME: MARIO D CASTILLO 10-379404 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 05/22/01 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-379404 TIME 10:50 AM ESTIMATE NO. 06 BID OPENING 07/19/00 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/01 R.E. NAME: MARIO D CASTILLO DATE OF THIS ESTIMATE 05/22/01 LOCATION PROGRESS ESTIMATE 10-SJ-12-15.1/18.4 ----------------- GRANITE CONSTRUCTION COMPANY IN SAN JOAQUIN COUNTY IN LODI FROM P O BOX 50085 LOWER SACRAMENTO ROAD TO ROUTE 99 WATSONVILLE CA 950775085 KETTLEMAN LANE AND FROM ROUTE 99 TO CLUFF AVENUE, VICTOR ROAD FED. AID NO. ACNH-P012(84)E RESURFACE ASPHALT CONCRETE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 001 CONSTRUCTION AREA SIGNS LS 6,000.0000 6,000.00 0.200 1,200.00 0.670 4,020.00 (S) 002 TRAFFIC CONTROL SYSTEM LS 160,000.0000 160,000.00 0.260 41,600.00 0.670 107,200.00 (S) 003 PORTABLE CHANGEABLE MESSAGE SIGN LS 55,000.0000 55,000.00 0.260 14,300.00 0.670 36,850.00 (S) 004 REMOVE THERMOPLASTIC PAVEMENT MARKING M2 16.0000 14,080.00 841.130 13,458.08 005 REMOVE ASPHALT CONCRETE DIKE M 5.0000 1,100.00 221.300 1,106.50 006 RESET MAILBOX EA 150.0000 600.00 0.000 0.00 007 RELOCATE ROADSIDE SIGN EA 240.0000 480.00 0.000 0.00 008 ADJUST WATER VALVE COVER TO GRADE EA 290.0000 37,700.00 0.000 0.00 009 ADJUST MONUMENT COVER TO GRADE EA 290.0000 1,450.00 0.000 0.00 010 ADJUST MANHOLE TO GRADE EA 380.0000 26,980.00 0.000 0.00 011 ADJUST DETECTOR HANDHOLE COVER TO GRADE EA 300.0000 8,100.00 0.000 0.00 012 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 3.8000 95,380.00 21,907.000 83,246.60 (S) (45 MM MAXIMUM) 013 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 5.9000 19,765.00 3,345.800 19,740.22 (S) (105 MM MAXIMUM) 014 REMOVE CONCRETE (CURB, SIDEWALK, M3 196.0000 17,836.00 69.830 13,686.68 CURB RAMP AND DRIVEWAY) 015 MODIFY BRIDGE RAILING EA 3,000.0000 6,000.00 0.000 0.00 016 REMOVE TREE EA 1,000.0000 2,000.00 2.000 2,000.00 017 ROADWAY EXCAVATION M3 65.0000 13,000.00 57.000 3,705.00 018 IMPORTED MATERIAL (SHOULDER BACKING) TONN 30.0000 8,400.00 0.000 0.00 019 ASPHALT CONCRETE (TYPE B) TONN 40.5000 1279,800.00 11,235.770 455,048.69 23,596.200 955,646.10 020 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 25.0000 1,675.00 0.000 0.00 AREA) 021 PLACE ASPHALT CONCRETE DIKE (TYPE E) M 19.0000 3,040.00 0.000 0.00 022 ASPHALTIC EMULSION (PAINT BINDER) TONN 10.0000 390.00 17.000 170.00 35.820 358.20 PROGRAM CAS145 PAGE 2 DATE 05/22/01 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-379404 TIME 10:50 AM ESTIMATE NO. 06 BID OPENING 07/19/00 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/01 R.E. NAME: MARIO D CASTILLO DATE OF THIS ESTIMATE 05/22/01 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 023 MINOR CONCRETE (CURB, SIDEWALK, M3 500.0000 85,000.00 150.540 75,270.00 CURB RAMP, AND DRIVEWAY) 024 METAL BEAM GUARD RAILING (WOOD POST) M 172.0000 2,752.00 0.000 0.00 (S) 025 TERMINAL SECTION (TYPE B) EA 150.0000 300.00 0.000 0.00 (S) 026 TERMINAL SYSTEM (TYPE SRT) EA 3,000.0000 6,000.00 0.000 0.00 (S) 027 THERMOPLASTIC PAVEMENT MARKING M2 28.0000 24,640.00 0.000 0.00 (S) 028 THERMOPLASTIC TRAFFIC STRIPE (SPRAYABLE) M 0.5400 11,664.00 0.000 0.00 (S) 029 PAVEMENT MARKER (NON-REFLECTIVE) EA 2.0000 122.00 0.000 0.00 (S) 030 PAVEMENT MARKER (REFLECTIVE) EA 3.0000 6,300.00 0.000 0.00 (S) PROGRAM CAS145 PAGE 3 DATE 05/22/01 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-379404 TIME 10:50 AM ESTIMATE NO. 06 BID OPENING 07/19/00 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/01 R.E. NAME: MARIO D CASTILLO DATE OF THIS ESTIMATE 05/22/01 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 512,318.69 1,316,287.38 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 59,224.37 SUBTOTAL AMOUNT EARNED 512,318.69 1,375,511.75 ORIGINAL CONTRACT AMOUNT 1,895,554.00 TOTAL WORK COMPLETED 512,318.69 1,375,511.75 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 512,318.69 1,375,511.75 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 08/24/00 90 09/11/00 09/11/00 07/11/01 57 68 3 47 70% 11% PROGRESS IS SATISFACTORY MARIO D CASTILLO RESIDENT ENGINEER PROGRAM CAS145 PAGE 9 DATE 05/22/01