PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/23/07 EST. NO.10 TIME 12:52 PM R.E. NAME: DEOL, HARMINDER 10-3A1204 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 002 0001 10,920.00 A.C. @ L.S.(+) 100407 N 1 0 004 0001 1,657.33 E.W. @ F.A.(+) 041907 Y 0092.0 0002 1,657.33 042007 Y 0093.0 0007 579.45 042707 Y 0098.0 0012 4,933.01 052207 Y 0103.0 0013 2,110.06 052107 Y 0104.0 005 0001 19,200.00 A.C. @ L.S.(+) 062607 N 140 0 006 0001 2,237.50 E.W. @ F.A.(+) 041907 Y 0075.0 0002 600.00 062807 Y 0131.0 010 0001 546.06 E.W. @ L.S.(+) 051807 Y 0115.0 44,440.74 TOTAL THIS ESTIMATE 98,299.54 TOTAL PREVIOUS ESTIMATE 142,740.28 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/23/07 EST. NO.10 TIME 12:52 PM R.E. NAME: DEOL, HARMINDER 10-3A1204 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE AC STABILITY 07-2036 -479.70 05 BASLINE CPM -1,497,419.90 07 CPM SCHEDULE -291,243.00 07 MISSING PAYROLLS -5,000.00 07 RELEASE CPM 788,662.90 07 RELEASE CPM 500,000.00 08 0.00 -505,479.70 TOTAL DEDUCTIONS 0.00 -505,479.70 PROGRAM CAS145 PAGE 1 DATE 10/23/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-3A1204 TIME 12:52 PM ESTIMATE NO. 10 BID OPENING 10/31/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/07 R.E. NAME: DEOL, HARMINDER DATE OF THIS ESTIMATE 10/23/07 LOCATION RERUN PROGRESS ESTIMATE 10-SJ-5-R13.9/R15.6 ----------------------- NEHEMIAH CONSTRUCTION INC IN SAN JOAQUIN COUNTY IN LATHROP 4790 E 2ND STREET FROM 0.1 KM NORTH OF PARADISE CUT BENICIA CA 94501 OVERFLOW BRIDGE TO 0.7 KM NORTH OF ROUTE 5 AND 120 SEPERATION OVERHEAD FED. AID NO. N O N E WIDEN ROADWAY AND BRIDGES ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 3,500.0000 3,500.00 0.700 2,450.00 02 TIME-RELATED OVERHEAD WDAY 2,800.0000 1,400,000.00 21.000 58,800.00 198.000 554,400.00 03 TEMPORARY FENCE (TYPE ESA) M 20.0000 38,200.00 925.000 18,500.00 S) 04 PREPARE STORM WATER POLLUTION LS 11,250.0000 11,250.00 1.000 11,250.00 PREVENTION PLAN 05 WATER POLLUTION CONTROL LS 20,000.0000 20,000.00 0.042 840.00 0.396 7,920.00 06 TEMPORARY CONCRETE WASHOUT FACILITY EA 1,000.0000 4,000.00 2.000 2,000.00 07 TEMPORARY CONSTRUCTION ENTRANCE EA 1,000.0000 2,000.00 2.000 2,000.00 08 ASBESTOS HEALTH & SAFETY PLAN LS 2,000.0000 2,000.00 1.000 2,000.00 09 ASBESTOS SURVEY LS 2,000.0000 2,000.00 1.000 2,000.00 10 CONSTRUCTION AREA SIGNS LS 15,000.0000 15,000.00 0.010 150.00 0.590 8,850.00 S) 11 TRAFFIC CONTROL SYSTEM LS 110,000.0000 110,000.00 0.046 5,060.00 0.396 43,560.00 S) 12 CHANNELIZER (SURFACE MOUNTED) EA 35.0000 2,660.00 76.000 2,660.00 S) 13 PORTABLE CHANGEABLE MESSAGE SIGN LS 10,000.0000 10,000.00 0.046 460.00 0.356 3,560.00 S) 14 TEMPORARY RAILING (TYPE K) M 140.0000 502,600.00 3,584.500 501,830.00 S) 15 TEMPORARY CRASH CUSHION MODULE EA 300.0000 21,000.00 86.000 25,800.00 S) 16 TEMPORARY CRASH CUSHION EA 3,500.0000 7,000.00 2.000 7,000.00 S) (ALTERNATIVE TERMINAL SYSTEM) 17 TEMPORARY TRAFFIC SCREEN M 25.0000 89,750.00 3,560.400 89,010.00 S) 18 REMOVE METAL BEAM GUARD RAILING M 25.0000 1,875.00 75.000 1,875.00 S) 19 REMOVE SINGLE THRIE BEAM BARRIER M 25.0000 2,300.00 103.430 2,585.75 S) 20 REMOVE DOUBLE THRIE BEAM BARRIER M 75.0000 75,750.00 1,024.890 76,866.75 S) 21 REMOVE YELLOW THERMOPLASTIC TRAFFIC M 4.0000 11,760.00 2,979.000 11,916.00 S) STRIPE 22 REMOVE PAINTED TRAFFIC STRIPE M 3.0000 14,280.00 0.000 0.00 S) PROGRAM CAS145 PAGE 2 DATE 10/23/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-3A1204 TIME 12:52 PM ESTIMATE NO. 10 BID OPENING 10/31/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/07 R.E. NAME: DEOL, HARMINDER DATE OF THIS ESTIMATE 10/23/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 REMOVE PAINTED PAVEMENT MARKING M2 100.0000 1,200.00 0.000 0.00 S) 24 REMOVE THERMOPLASTIC TRAFFIC STRIPE M 4.0000 8,760.00 2,190.000 8,760.00 S) 25 REMOVE THERMOPLASTIC PAVEMENT MARKING M2 200.0000 2,400.00 11.700 2,340.00 S) 26 REMOVE PAVEMENT MARKER EA 4.0000 12,440.00 2,602.000 10,408.00 S) 27 REMOVE ROADSIDE SIGN EA 500.0000 2,000.00 4.000 2,000.00 28 REMOVE SIGN STRUCTURE EA 2,000.0000 2,000.00 1.000 2,000.00 29 REMOVE PIPE M 100.0000 1,600.00 16.000 1,600.00 30 REMOVE INLET EA 500.0000 4,000.00 5.000 2,500.00 31 SALVAGE METAL BRIDGE RAILING M 100.0000 76,000.00 358.000 35,800.00 32 RECONSTRUCT SINGLE THRIE BEAM BARRIER M 200.0000 4,000.00 10.000 2,000.00 33 RECONSTRUCT METAL BEAM GUARD RAILING M 125.0000 1,000.00 0.000 0.00 S) 34 ACCESS OPENING, SOFFIT EA 1,000.0000 10,000.00 0.000 0.00 35 BRIDGE REMOVAL (PORTION), LOCATION A LS 170,000.0000 170,000.00 0.530 90,100.00 0.780 132,600.00 36 BRIDGE REMOVAL (PORTION), LOCATION B LS 60,000.0000 60,000.00 0.050 3,000.00 0.850 51,000.00 37 CLEARING AND GRUBBING LS 75,000.0000 75,000.00 1.000 75,000.00 38 ROADWAY EXCAVATION M3 150.0000 718,500.00 4,704.000 705,600.00 39 LEAD COMPLIANCE PLAN LS 5,000.0000 5,000.00 1.000 5,000.00 40 STRUCTURE EXCAVATION (BRIDGE) M3 700.0000 329,000.00 470.000 329,000.00 F) 41 STRUCTURE EXCAVATION (TYPE A) M3 200.0000 76,000.00 380.000 76,000.00 F) 42 STRUCTURE EXCAVATION (TYPE D) M3 200.0000 44,000.00 119.000 23,800.00 119.000 23,800.00 F) 43 STRUCTURE EXCAVATION (RETAINING WALL) M3 200.0000 20,000.00 70.000 14,000.00 100.000 20,000.00 F) 44 STRUCTURE BACKFILL (BRIDGE) M3 100.0000 43,000.00 117.200 11,720.00 F) 45 STRUCTURE BACKFILL (RETAINING WALL) M3 20.0000 2,000.00 0.000 0.00 F) 46 IMPORTED MATERIAL (SHOULDER BACKING) TONN 30.0000 44,400.00 1,080.000 32,400.00 47 STRAW (EROSION CONTROL) TONN 400.0000 4,000.00 1.080 432.00 1.080 432.00 S) 48 COMPOST M3 260.0000 13,260.00 8.180 2,126.80 8.180 2,126.80 S) 49 FIBER (EROSION CONTROL) KG 1.0000 2,040.00 334.000 334.00 334.000 334.00 S) PROGRAM CAS145 PAGE 3 DATE 10/23/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-3A1204 TIME 12:52 PM ESTIMATE NO. 10 BID OPENING 10/31/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/07 R.E. NAME: DEOL, HARMINDER DATE OF THIS ESTIMATE 10/23/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 1,000.0000 8,000.00 1.000 1,000.00 1.000 1,000.00 S) 51 PURE LIVE SEED (EROSION CONTROL) KG 130.0000 7,150.00 8.680 1,128.40 8.680 1,128.40 S) 52 COMMERCIAL FERTILIZER (EROSION CONTROL) KG 2.0000 680.00 54.080 108.16 54.080 108.16 S) 53 STABILIZING EMULSION (EROSION CONTROL) KG 3.0000 780.00 40.720 122.16 40.720 122.16 S) 54 NPS 3 SUPPLY LINE (BRIDGE) M 100.0000 40,000.00 170.000 17,000.00 55 100 MM CONDUIT (FUTURE UTILITY) M 20.0000 8,000.00 400.000 8,000.00 400.000 8,000.00 56 MAINTENANCE VEHICLE PULLOUT EA 5,000.0000 5,000.00 0.800 4,000.00 S) 57 CLASS 2 AGGREGATE BASE M3 140.0000 484,400.00 3,300.000 462,000.00 58 AGGREGATE BASE (APPROACH SLAB) M3 200.0000 7,400.00 0.000 0.00 59 ASPHALT CONCRETE (TYPE B) TONN 87.0000 594,210.00 4,113.000 357,831.00 60 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 150.0000 55,500.00 137.850 20,677.50 AREA) 61 PLACE ASPHALT CONCRETE DIKE (TYPE F) M 50.0000 3,250.00 0.000 0.00 62 SHOULDER RUMBLE STRIP STA 400.0000 8,400.00 0.000 0.00 (AC, ROLLED-IN INDENTATIONS) 63 FURNISH STEEL PIPE PILING (610 MM) M 410.0000 899,950.00 279.500 114,595.00 2,170.630 889,958.30 64 DRIVE STEEL PIPE PILE (610 MM) EA 3,000.0000 369,000.00 12.000 36,000.00 120.000 360,000.00 S) 65 FURNISH PILING (CLASS 625) M 200.0000 74,800.00 372.000 74,400.00 66 DRIVE PILE (CLASS 625) EA 2,000.0000 40,000.00 20.000 40,000.00 S) 67 FURNISH PILING (CLASS 400) (ALT X) M 160.0000 52,800.00 500.600 80,096.00 68 DRIVE PILE (CLASS 400) (ALT X) EA 1,500.0000 34,500.00 25.000 37,500.00 S) 69 PRESTRESSING CAST-IN-PLACE CONCRETE LS 52,000.0000 52,000.00 0.900 46,800.00 1.000 52,000.00 S) 70 SEAL COURSE CONCRETE M3 800.0000 76,000.00 95.700 76,560.00 71 STRUCTURAL CONCRETE, BRIDGE FOOTING M3 500.0000 100,000.00 29.200 14,600.00 195.800 97,900.00 F) 72 STRUCTURAL CONCRETE, BRIDGE M3 760.0000 1,314,800.00 270.000 205,200.00 1,012.000 769,120.00 F) 73 STRUCTURAL CONCRETE, RETAINING WALL M3 800.0000 36,000.00 30.000 24,000.00 45.000 36,000.00 F) 74 STRUCTURAL CONCRETE, APPROACH SLAB M3 1,000.0000 40,000.00 0.000 0.00 F) (TYPE N) 75 STRUCTURAL CONCRETE, APPROACH SLAB M3 1,000.0000 250,000.00 0.000 0.00 (TYPE R) 76 STRUCTURAL CONCRETE, APPROACH SLAB M3 1,000.0000 24,000.00 0.000 0.00 F) (TYPE N MODIFIED) PROGRAM CAS145 PAGE 4 DATE 10/23/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-3A1204 TIME 12:52 PM ESTIMATE NO. 10 BID OPENING 10/31/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/07 R.E. NAME: DEOL, HARMINDER DATE OF THIS ESTIMATE 10/23/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 77 MINOR CONCRETE (MINOR STRUCTURE) M3 1,200.0000 20,400.00 7.430 8,916.00 F) 78 MINOR CONCRETE (BACKFILL) M3 400.0000 56,000.00 137.040 54,816.00 79 PAVING NOTCH EXTENSION M3 2,500.0000 20,000.00 0.000 0.00 80 DIAPHRAGM BOLSTER EA 2,000.0000 20,000.00 0.000 0.00 81 DRILL AND BOND DOWEL M 70.0000 38,500.00 35.000 2,450.00 82 DRILL AND BOND DOWEL (EPOXY CARTRIDGE) EA 65.0000 9,100.00 0.000 0.00 83 CORE CONCRETE (301 MM - 350 MM) M 200.0000 1,800.00 0.000 0.00 S) 84 JOINT SEAL (MR 40 MM) M 200.0000 2,000.00 0.000 0.00 S) 85 JOINT SEAL (MR 50 MM) M 200.0000 6,400.00 0.000 0.00 S) 86 BAR REINFORCING STEEL (BRIDGE) KG 2.2000 715,000.00 50,826.000 111,817.20 191,426.000 421,137.20 SF) 87 BAR REINFORCING STEEL (RETAINING WALL) KG 2.8000 7,560.00 1,900.000 5,320.00 2,700.000 7,560.00 SF) 88 FURNISH SIGN STRUCTURE (TRUSS) KG 11.0000 208,417.00 0.000 0.00 F) 89 INSTALL SIGN STRUCTURE (TRUSS) KG 1.0000 18,947.00 0.000 0.00 SF) 90 1524 MM CAST-IN-DRILLED-HOLE M 6,000.0000 42,000.00 7.000 42,000.00 7.000 42,000.00 S) CONCRETE PILE (SIGN FOUNDATION) 91 ROADSIDE SIGN - ONE POST EA 500.0000 2,000.00 0.000 0.00 92 450 MM REINFORCED CONCRETE PIPE M 300.0000 63,000.00 204.700 61,410.00 93 600 MM REINFORCED CONCRETE PIPE M 300.0000 180,000.00 590.400 177,120.00 94 JACKED 450 MM REINFORCED CONCRETE PIPE M 1,600.0000 36,800.00 0.000 0.00 (CLASS IV) 95 JACKED 600 MM REINFORCED CONCRETE PIPE M 1,600.0000 72,000.00 0.000 0.00 (CLASS V) 96 600 MM BITUMINOUS COATED CORRUGATED M 500.0000 3,500.00 0.000 0.00 STEEL PIPE DOWNDRAIN (2.01 MM THICK) 97 600 MM ANCHOR ASSEMBLY EA 400.0000 2,000.00 0.000 0.00 98 900 MM PRECAST CONCRETE PIPE INLET M 400.0000 4,800.00 11.950 4,780.00 99 ROCK SLOPE PROTECTION (LIGHT, METHOD B) M3 100.0000 1,100.00 0.000 0.00 00 ROCK SLOPE PROTECTION M3 100.0000 38,000.00 0.000 0.00 (BACKING NO. 1, METHOD B) 01 ROCK SLOPE PROTECTION (1/2T, METHOD B) M3 100.0000 45,000.00 0.000 0.00 02 ROCK SLOPE PROTECTION (1/4T, METHOD B) M3 100.0000 96,000.00 0.000 0.00 PROGRAM CAS145 PAGE 5 DATE 10/23/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-3A1204 TIME 12:52 PM ESTIMATE NO. 10 BID OPENING 10/31/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/07 R.E. NAME: DEOL, HARMINDER DATE OF THIS ESTIMATE 10/23/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 03 ROCK SLOPE PROTECTION FABRIC M2 8.0000 7,360.00 0.000 0.00 04 MISCELLANEOUS IRON AND STEEL KG 8.0000 20,072.00 1,958.000 15,664.00 SF) 05 MISCELLANEOUS METAL KG 10.0000 21,000.00 0.000 0.00 SF)(RESTRAINER - PIPE TYPE) 06 BRIDGE DECK DRAINAGE SYSTEM KG 14.0000 111,300.00 0.000 0.00 SF) 07 DELINEATOR (CLASS 1) EA 50.0000 1,050.00 10.000 500.00 08 METAL BEAM GUARD RAILING (STEEL POST) M 150.0000 7,500.00 0.000 0.00 S) 09 CHAIN LINK RAILING (TYPE 7 MODIFIED) M 400.0000 17,600.00 0.000 0.00 SF) 10 SINGLE THRIE BEAM BARRIER (STEEL POST) M 200.0000 18,400.00 0.000 0.00 S) 11 TRANSITION RAILING (TYPE STB) EA 1,000.0000 2,000.00 0.000 0.00 S) 12 TRANSITION RAILING (TYPE WB) EA 1,000.0000 2,000.00 0.000 0.00 S) 13 END CAP (TYPE A) EA 500.0000 1,000.00 0.000 0.00 S) 14 END CAP (TYPE TC) EA 500.0000 1,500.00 0.000 0.00 S) 15 END ANCHOR ASSEMBLY (TYPE SFT) EA 2,000.0000 2,000.00 0.000 0.00 S) 16 ALTERNATIVE FLARED TERMINAL SYSTEM EA 750.0000 750.00 0.000 0.00 S) 17 CONCRETE BARRIER (TYPE 60C) M 250.0000 275,000.00 1,021.380 255,345.00 18 CONCRETE BARRIER (TYPE 736) M 300.0000 116,700.00 0.000 0.00 F) 19 CONCRETE BARRIER (TYPE 736R) M 300.0000 114,600.00 0.000 0.00 F) 20 THERMOPLASTIC PAVEMENT MARKING M2 100.0000 1,200.00 0.000 0.00 S) 21 THERMOPLASTIC TRAFFIC STRIPE M 1.5000 18,000.00 0.000 0.00 S) (SPRAYABLE) 22 PAINT TRAFFIC STRIPE (2-COAT) M 0.3500 3,202.50 9,506.000 3,327.10 S) 23 PAINT PAVEMENT MARKING (2-COAT) M2 35.0000 420.00 11.700 409.50 S) 24 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.0000 7,040.00 401.000 1,604.00 S) 25 LIGHTING (TEMPORARY) LS 45,000.0000 45,000.00 0.480 21,600.00 S) 26 MODIFY LIGHTING AND SIGN ILLUMINATION LS 40,000.0000 40,000.00 0.000 0.00 S) (LOCATION 1) 27 MODIFY LIGHTING AND SIGN ILLUMINATION LS 240,000.0000 240,000.00 0.000 0.00 S) (LOCATION 2) 28 MODIFY CHANGEABLE MESSAGE SIGN SYSTEM LS 3,000.0000 3,000.00 0.000 0.00 S) 29 CHANGEABLE MESSAGE SIGN SYSTEM LS 85,000.0000 85,000.00 0.000 0.00 S) PROGRAM CAS145 PAGE 6 DATE 10/23/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-3A1204 TIME 12:52 PM ESTIMATE NO. 10 BID OPENING 10/31/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/07 R.E. NAME: DEOL, HARMINDER DATE OF THIS ESTIMATE 10/23/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 30 MODIFY TRAFFIC MONITORING STATION LS 60,000.0000 60,000.00 0.000 0.00 S) (LOCATION 1) 31 MODIFY TRAFFIC MONITORING STATION LS 50,000.0000 50,000.00 0.000 0.00 S) (LOCATION 2) 32 MODIFY TRAFFIC MONITORING STATION LS 35,000.0000 35,000.00 0.000 0.00 S) (LOCATION 3) 33 MODIFY TRAFFIC MONITORING STATION LS 35,000.0000 35,000.00 0.000 0.00 S) (LOCATION 4) 34 CLOSED CIRCUIT TELEVISION SYSTEM LS 17,000.0000 17,000.00 0.000 0.00 S) (LOCATION 1) 35 CLOSED CIRCUIT TELEVISION SYSTEM LS 20,000.0000 20,000.00 0.000 0.00 S) (LOCATION 2) 36 MODIFY WEATHER STATION AND VISIBILITY LS 2,000.0000 2,000.00 0.000 0.00 S) SENSOR (LOCATION 2) 37 MODIFY WEATHER STATION AND VISIBILITY LS 3,000.0000 3,000.00 0.000 0.00 S) SENSOR (LOCATION 1) PROGRAM CAS145 PAGE 7 DATE 10/23/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 10-3A1204 TIME 12:52 PM ESTIMATE NO. 10 BID OPENING 10/31/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/07 R.E. NAME: DEOL, HARMINDER DATE OF THIS ESTIMATE 10/23/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 809,793.72 7,374,494.62 ADJUSTMENT OF COMPENSATION 30,120.00 30,120.00 EXTRA WORK 14,320.74 112,620.28 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 854,234.46 7,517,234.90 38 MOBILIZATION LS 1210,000.0000 1,210,000.00 1.000 1,210,000.00 ORIGINAL CONTRACT AMOUNT 12,970,163.50 TOTAL WORK COMPLETED 854,234.46 8,727,234.90 MATERIALS ON HAND ON SITE 20,658.69 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 -505,479.70 TOTAL 854,234.46 8,242,413.89 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 11/30/06 500 01/08/07 01/08/07 01/09/09 198 0 0 0 66% 40% PROGRESS IS SATISFACTORY CCO DEOL, HARMINDER RESIDENT ENGINEER PROGRAM CAS145 DATE 10/23/07