PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/22/06 EST. NO.09 TIME 01:03 PM R.E. NAME: SAWAGED, HASSAN 11-077304 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 004 0001 1,117.89 E.W. @ F.A.(+) 103105 N 0001 0 0002 1,977.16 110105 N 0002 0 0003 2,094.23 110205 N 0003 0 0004 4,436.64 112805 N 0004 0 0005 887.82 113005 N 0005 0 0006 2,629.56 120105 N 0006 0 0007 2,938.77 112905 N 0007 0 0008 3,123.50 120505 N 0008 0 0009 3,956.25 120605 N 0009 0 0010 224.40 121405 N 0010 0 23,386.22 TOTAL THIS ESTIMATE 6,489.86 TOTAL PREVIOUS ESTIMATE 29,876.08 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/22/06 EST. NO.09 TIME 01:03 PM R.E. NAME: SAWAGED, HASSAN 11-077304 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION O/S PRS MAY -10,000.00 03 O/S PRS JUNE -10,000.00 04 PRS JUNE CORRECTION 10,000.00 06 PRS MAY CORRECTION 10,000.00 06 O/S PRS FEB -8,176.80 09 -8,176.80 -8,176.80 TOTAL DEDUCTIONS -8,176.80 -8,176.80 PROGRAM CAS145 PAGE 1 DATE 03/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-077304 TIME 01:03 PM ESTIMATE NO. 09 BID OPENING 08/26/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/06 R.E. NAME: SAWAGED, HASSAN DATE OF THIS ESTIMATE 03/22/06 LOCATION PROGRESS ESTIMATE 11-SD-15-M13.0/R50.9 ----------------- HANSON SJH CONSTRUCTION IN SAN DIEGO COUNTY AT VARIOUS P.O. BOX 639060 LOCATIONS SAN DIEGO,CA 92163-9069 FED. AID NO. ACIM-015 -4(197)13E RESURFACE ASPHALT CONCRETE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 9,000.0000 9,000.00 0.250 2,250.00 02 TIME-RELATED OVERHEAD LS 38,500.0000 38,500.00 0.121 4,658.50 03 PREPARE WATER POLLUTION CONTROL LS 1,500.0000 1,500.00 0.750 1,125.00 S) PROGRAM 04 WATER POLLUTION CONTROL LS 21,000.0000 21,000.00 0.000 0.00 05 TEMPORARY EROSION CONTROL M2 0.8500 459.00 231.750 196.99 S) 06 TEMPORARY FIBER ROLL M 8.0000 5,920.00 39.000 312.00 07 CONSTRUCTION AREA SIGNS LS 15,000.0000 15,000.00 0.500 7,500.00 S) 08 TRAFFIC CONTROL SYSTEM LS 183,500.0000 183,500.00 0.182 33,397.00 S) 09 TYPE III BARRICADE EA 10.0000 100.00 0.000 0.00 S) 10 CHANNELIZER (SURFACE MOUNTED) EA 47.6000 714.00 0.000 0.00 S) (LEFT IN PLACE) 11 TRAFFIC PLASTIC DRUMS EA 10.0000 540.00 0.000 0.00 S) 12 PORTABLE CHANGEABLE MESSAGE SIGN EA 8,500.0000 25,500.00 0.150 1,275.00 S) 13 REMOVE METAL BEAM GUARD RAILING M 32.6400 4,896.00 181.000 5,907.84 14 REMOVE CHANNELIZERS EA 10.3000 154.50 0.000 0.00 15 REMOVE ROADSIDE SIGN EA 155.0000 930.00 1.000 155.00 16 REMOVE ASPHALT CONCRETE DIKE M 0.7000 16,520.00 0.000 0.00 17 REMOVE DELINEATOR EA 10.3000 679.80 0.000 0.00 18 RESET ROADSIDE SIGN EA 310.0000 930.00 3.000 930.00 19 RELOCATE ROADSIDE SIGN EA 290.0000 580.00 0.000 0.00 20 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 2.6000 650,000.00 649.500 1,688.70 S) 21 ROADWAY EXCAVATION M3 74.5000 126,650.00 0.000 0.00 22 STABILIZING EMULSION (EROSION CONTROL) KG 185.0000 1,017.50 0.000 0.00 S) PROGRAM CAS145 PAGE 2 DATE 03/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-077304 TIME 01:03 PM ESTIMATE NO. 09 BID OPENING 08/26/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/06 R.E. NAME: SAWAGED, HASSAN DATE OF THIS ESTIMATE 03/22/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 CLASS 2 AGGREGATE BASE M3 365.0000 5,840.00 16.000 5,840.00 24 ASPHALTIC EMULSION (FOG SEAL COAT) TONN 265.0000 9,540.00 0.000 0.00 25 REPLACE ASPHALT CONCRETE SURFACING M3 400.0000 7,600.00 0.000 0.00 26 ASPHALT CONCRETE (TYPE A) TONN 55.7500 223,000.00 123.430 6,881.22 27 RUBBERIZED ASPHALT CONCRETE (TYPE G) TONN 81.7500 1,847,550.00 0.000 0.00 28 PLACE ASPHALT CONCRETE DIKE M 4.9000 115,640.00 0.000 0.00 29 ASPHALTIC EMULSION (PAINT BINDER) TONN 265.0000 19,610.00 0.030 7.95 30 FURNISH SIGN STRUCTURE (TRUSS) KG 7.9500 56,445.00 7,100.000 56,445.00 7,100.000 56,445.00 F) 31 INSTALL SIGN STRUCTURE (TRUSS) KG 1.5300 10,863.00 7,100.000 10,863.00 7,100.000 10,863.00 SF) 32 1524 MM CAST-IN-DRILLED-HOLE CONCRETE M 2,841.0000 19,887.00 7.000 19,887.00 S) PILE (SIGN FOUNDATION) 33 METAL (RAIL MOUNTED SIGN) KG 16.8000 672.00 40.000 672.00 34 ROADSIDE SIGN - ONE POST EA 370.0000 4,070.00 4.000 1,480.00 6.000 2,220.00 35 ROADSIDE SIGN - TWO POST EA 675.0000 10,800.00 8.000 5,400.00 12.000 8,100.00 36 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 410.0000 410.00 0.000 0.00 METHOD) 37 INSTALL SIGN (MAST-ARM HANGER METHOD) EA 770.0000 1,540.00 0.000 0.00 38 INSTALL ROADSIDE SIGN PANEL ON EA 250.0000 4,500.00 14.000 3,500.00 14.000 3,500.00 EXISTING POST 39 INSTALL ROADSIDE SIGN EA 500.0000 2,500.00 0.000 0.00 (LAMINATED WOOD BOX POST) 40 DELINEATOR (CLASS 1) EA 41.0000 13,120.00 0.000 0.00 41 METAL BEAM GUARD RAIL DELINEATOR EA 31.0000 992.00 23.000 713.00 42 TERMINAL SYSTEM (TYPE SRT) EA 2,749.0000 27,490.00 9.000 24,741.00 S) 43 CRASH CUSHION (REACT 9SCBS) EA 48,812.0000 48,812.00 0.950 46,371.40 S) 44 CONCRETE BARRIER (TYPE 60C) M 280.0000 33,600.00 114.300 32,004.00 45 THERMOPLASTIC PAVEMENT MARKING M2 33.8000 35,828.00 42.160 1,425.01 S) 46 200 MM THERMOPLASTIC TRAFFIC STRIPE M 2.0400 23,868.00 235.000 479.40 S) 47 200 MM THERMOPLASTIC TRAFFIC STRIPE M 1.5300 244.80 0.000 0.00 S) (BROKEN 3.66 M - 0.92 M) 48 100 MM THERMOPLASTIC TRAFFIC STRIPE M 1.0200 1,611.60 0.000 0.00 S) (BROKEN 5.18 M - 2.14 M) 49 PAINT TRAFFIC STRIPE (2-COAT) M 0.4100 20,500.00 1,068.000 437.88 S) PROGRAM CAS145 PAGE 3 DATE 03/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-077304 TIME 01:03 PM ESTIMATE NO. 09 BID OPENING 08/26/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/06 R.E. NAME: SAWAGED, HASSAN DATE OF THIS ESTIMATE 03/22/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 PAVEMENT MARKER (NON-REFLECTIVE) EA 1.5300 5,355.00 0.000 0.00 S) 51 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.5700 18,921.00 57.000 203.49 S) 52 CHANGEABLE MESSAGE SIGN SYSTEM LS 41,820.0000 41,820.00 1.000 41,820.00 S) 53 INDUCTIVE LOOP DETECTOR EA 408.0000 138,720.00 10.000 4,080.00 10.000 4,080.00 S) 54 CLOSED CIRCUIT TELEVISION SYSTEM LS 47,340.0000 47,340.00 1.000 47,340.00 S) (LOCATION 7) 55 CLOSED CIRCUIT TELEVISION SYSTEM LS 47,340.0000 47,340.00 1.000 47,340.00 S) (LOCATION 8) 56 CLOSED CIRCUIT TELEVISION SYSTEM LS 47,340.0000 47,340.00 1.000 47,340.00 S) (LOCATION 9) 57 CLOSED CIRCUIT TELEVISION SYSTEM LS 47,340.0000 47,340.00 1.000 47,340.00 S) (LOCATION 11) 58 MODIFY SIGNAL AND LIGHTING LS 35,721.0000 35,721.00 0.858 30,648.62 S) PROGRAM CAS145 PAGE 4 DATE 03/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-077304 TIME 01:03 PM ESTIMATE NO. 09 BID OPENING 08/26/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/06 R.E. NAME: SAWAGED, HASSAN DATE OF THIS ESTIMATE 03/22/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 81,768.00 546,096.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 23,386.22 29,876.08 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 105,154.22 575,972.08 59 MOBILIZATION LS 148,500.0000 148,500.00 0.750 111,375.00 ORIGINAL CONTRACT AMOUNT 4,229,021.20 TOTAL WORK COMPLETED 105,154.22 687,347.08 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -8,176.80 -8,176.80 TOTAL 96,977.42 679,170.28 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE (S) PREVENTION PLAN N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 10/13/04 58 04/11/05 12/27/04 06/30/06 7 320 0 0 16% 12% PROGRESS IS SATISFACTORY SAWAGED, HASSAN RESIDENT ENGINEER PROGRAM CAS145 PAGE 7 DATE 03/22/06