PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/19/12 EST. NO.01 TIME 02:42 PM R.E. NAME: AKHONDZADEH, RAHIM 11-077604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/19/12 EST. NO.01 TIME 02:42 PM R.E. NAME: AKHONDZADEH, RAHIM 11-077604 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 06/19/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-077604 TIME 02:42 PM ESTIMATE NO. 01 BID OPENING 01/05/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/12 R.E. NAME: AKHONDZADEH, RAHIM DATE OF THIS ESTIMATE 06/19/12 LOCATION PROGRESS ESTIMATE 11-SD-5-36.3/37.4 ----------------- PENHALL COMPANY IN SAN DIEGO COUNTY IN SAN DIEGO P O BOX 310 AND SOLANA BEACH FROM VIA DE LA ROGERS MN 55374 VALLE UNDERCROSSING TO LOMAS SANTA FE DR. UNDERCROSSING FED. AID NO. N O N E SPECIAL GRIND FOR NOISE REDUCTION ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 001 CONSTRUCTION SITE MANAGEMENT LS 3,500.0000 3,500.00 0.350 1,225.00 0.350 1,225.00 002 PREPARE WATER POLLUTION CONTROL LS 875.0000 875.00 0.750 656.25 0.750 656.25 PROGRAM 003 CONSTRUCTION AREA SIGNS LS 4,400.0000 4,400.00 0.540 2,376.00 0.540 2,376.00 004 TRAFFIC CONTROL SYSTEM LS 60,000.0000 60,000.00 0.350 21,000.00 0.350 21,000.00 005 TEMPORARY PAVEMENT MARKER EA 2.0000 11,100.00 0.000 0.00 006 PORTABLE CHANGEABLE MESSAGE SIGN EA 1,400.0000 2,800.00 0.700 980.00 0.700 980.00 007 LEAD COMPLIANCE PLAN LS 785.0000 785.00 0.750 588.75 0.750 588.75 008 ASPHALTIC EMULSION (FOG SEAL COAT) TON 2,530.0000 2,530.00 0.000 0.00 009 REPAIR SPALLED JOINTS SQYD 1,100.0000 44,000.00 0.000 0.00 010 GRIND AND GROOVE EXISTING CONCRETE SQYD 7.7500 675,800.00 29,333.480 227,334.47 29,333.480 227,334.47 PAVEMENT 011 GRIND EXISTING ASPHALT CONCRETE SQYD 4.0000 1,600.00 0.000 0.00 PAVEMENT 012 GUARD RAILING DELINEATOR EA 32.8900 361.79 0.000 0.00 013 METAL BEAM GUARD RAILING LF 31.4600 1,887.60 0.000 0.00 014 END ANCHOR ASSEMBLY (TYPE SFT) EA 1,340.0000 1,340.00 0.000 0.00 015 ALTERNATIVE FLARED TERMINAL SYSTEM EA 4,400.0000 4,400.00 0.000 0.00 016 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.7800 7,113.60 0.000 0.00 017 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.5700 4,239.00 0.000 0.00 018 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.6100 3,983.30 0.000 0.00 (BROKEN 12-3) 019 THERMOPLASTIC PAVEMENT MARKING LF 11.2500 3,825.00 0.000 0.00 020 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.3300 11,352.00 0.000 0.00 (BROKEN 36-12) 021 4" THERMOPLASTIC TRAFFIC STRIPE LF 1.1100 710.40 0.000 0.00 (BROKEN 17-7) 022 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.7800 1,825.20 0.000 0.00 (BROKEN 36-12) PROGRAM CAS145 PAGE 2 DATE 06/19/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-077604 TIME 02:42 PM ESTIMATE NO. 01 BID OPENING 01/05/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/12 R.E. NAME: AKHONDZADEH, RAHIM DATE OF THIS ESTIMATE 06/19/12 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 023 PAINT TRAFFIC STRIPE (2-COAT) LF 0.2800 6,272.00 0.000 0.00 024 PAVEMENT MARKER (NON-REFLECTIVE) EA 1.5500 4,464.00 0.000 0.00 025 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.0000 8,040.00 0.000 0.00 026 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,500.0000 1,500.00 0.350 525.00 0.350 525.00 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 3 DATE 06/19/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-077604 TIME 02:42 PM ESTIMATE NO. 01 BID OPENING 01/05/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/12 R.E. NAME: AKHONDZADEH, RAHIM DATE OF THIS ESTIMATE 06/19/12 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 254,685.47 254,685.47 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 254,685.47 254,685.47 027 MOBILIZATION LS 25,000.0000 25,000.00 0.950 23,750.00 0.950 23,750.00 ORIGINAL CONTRACT AMOUNT 893,703.89 TOTAL WORK COMPLETED 278,435.47 278,435.47 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 278,435.47 278,435.47 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 03/22/12 60 05/07/12 04/09/12 07/02/12 21 8 7 0 29% 31% PROGRESS IS SATISFACTORY *** SUSPENDED ON 06/11/12. AKHONDZADEH, RAHIM RESIDENT ENGINEER PROGRAM CAS145 DATE 06/19/12