PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/25/11 EST. NO.39 TIME 11:25 AM R.E. NAME: RIZZUTTO, SHAWN 11-167884 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 014 0065 747.71 E.W. @ F.A.(+) 041311 N 0758.0 038 0009 302.73 E.W. @ F.A.(+) 032411 N 0783.0 041 0004 530.20 E.W. @ F.A.(+) 031811 N 0782.0 072 0004 723.52 E.W. @ F.A.(+) 022211 N 0769.0 0007 17,363.27 022411 N 0772.0 079 0005 920.58 E.W. @ F.A.(+) 082310 N 0695.0 0006 883.63 082410 N 0730.0 0007 1,336.11 082510 N 0731.0 0008 999.45 082610 N 0732.0 0009 1,334.63 090110 N 0733.0 0010 2,861.07 090910 N 0784.0 0011 1,787.93 091010 N 0785.0 0012 1,770.17 091310 N 0786.0 0013 2,155.63 091410 N 0787.0 0014 1,630.14 093010 N 0788.0 0015 1,629.12 100110 N 0789.0 082 0001 1,298.92 E.W. @ F.A.(+) 032811 N 0777.0 0002 723.65 040411 N 0778.0 38,998.46 TOTAL THIS ESTIMATE 2,770,572.16 TOTAL PREVIOUS ESTIMATE 2,809,570.62 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/25/11 EST. NO.39 TIME 11:25 AM R.E. NAME: RIZZUTTO, SHAWN 11-167884 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE FAILED TESTS -1,500.00 03 FAILED TESTS 01 -3,346.47 04 NO CERTS ITEM 19-21 -3,155.00 04 FAILED TESTS 001 578.28 05 NO CERTS ITEM 19-21 3,155.00 05 FAILED CLASS 4 -01 -4,377.00 07 FAILED TEST 02 -858.85 07 CLASS 2 -180,381.41 08 CLASS 4 -328,653.90 08 FAILED TEST 03 -4,289.46 08 PERMEABLE MATL -429,522.00 08 CLASS 2 180,381.41 09 CLASS 4 328,653.90 09 FAILED TESTS 03 -705.32 09 FAILED TESTS 02 -143.15 09 PERMEABLE MATL 429,522.00 09 FAILED TEST 04 -3,242.33 10 FAILED TEST 05 -839.46 11 MISSING MTR ST PILES -10,000.00 11 FAILED TEST 06 -2,530.96 12 MISSING MTR ST PILES 10,000.00 12 TENSILE STRENGTH TST -10,000.00 12 TENSILE STRENGHT TST 10,000.00 14 FAILED CLASS 4, 01 364.75 15 FAILED CLASS 2, 01 -1,231.20 15 FAILED TEST 07 -1,121.65 15 FAILED TEST 08 -816.88 16 FAILED CLASS 2 -1,200.00 17 FAILED TEST 09 -471.15 17 FAILED TEST 10 -533.86 18 FAILED TEST 11 -533.86 19 FAILED TEST 12 -2,262.42 20 FAILED TEST 13 -4,890.46 21 FAILED CONC PAV 01 -194,638.50 24 FAILED CONC PAV 02 -697,747.27 25 FAILED CONC PAV 03 -286,252.50 26 FAILED CLASS II -1,200.00 27 FAILED CONC PAV 04 -727,208.87 27 FAILED CONC PAV 04 -348,502.82 28 FAILED TEST 14 -819.06 28 FAILED TEST 15 -559.38 29 DOWELBARDEDUCTION TS -48,490.63 30 FAILED TESTS 01-05 1,902,544.68 30 HAND INSERTED TB -5,804.61 30 FAILED REV-SCHEDULE -282,820.85 32 FAILED TEST 16 -745.32 32 FAILED RE SCHEDULE -198,876.65 33 FAILED TEST 17 -1,574.17 33 FAILED REV SCHEDULE -138,754.74 34 PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 2 DATE 05/25/11 EST. NO.39 TIME 11:25 AM R.E. NAME: RIZZUTTO, SHAWN 11-167884 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- FAILED TEST 18 -378.54 34 FAILED REV SCHEDULE -342,308.06 35 FAILED TEST 19 -499.42 35 FAILED TEST 18 378.54 35 FAILED REV SCHEDULE 962,760.30 37 LCCA DOWEL -298,565.00 37 FAILED CONC PAV RETU 334,905.77 38 FAILED LONG TRANS -6,806.82 38 0.00 -415,915.37 LABOR COMPLIANCE VIOLATION O/S PRS JUNE -10,000.00 02 O/S PRS AUG -10,000.00 04 PRS RECD JUNE 10,000.00 04 O/S PRS SEPT -10,000.00 05 O/S PRS OCT -10,000.00 06 O/S PRS NOV -10,000.00 07 O/S PRS DEC -10,000.00 08 O/S PRS JAN -10,000.00 10 PRS RECD AUG 10,000.00 10 PRS RECD SEPT 08 10,000.00 11 O/S PRS MARCH -10,000.00 12 PRS RECD JAN 10,000.00 12 PRS RECD DEC 10,000.00 12 PRS RECD OCT 10,000.00 12 O/S PRS APRIL -10,000.00 13 O/S PRS MAY 09 -10,000.00 14 PRS RECD MAR 10,000.00 14 PRTL PRS RECD APR 7,000.00 14 PRTL PRS RECD NOV 5,000.00 14 O/S PRS JUNE -10,000.00 15 PRS RECD MAY 10,000.00 15 PRS RECD APRIL 3,000.00 15 PRS RECD NOV 5,000.00 16 O/S PRS AUG -10,000.00 17 O/S PRS OCT -1,000.00 19 PRTL PRS RECD AUG 7,000.00 19 O/S PRS DEC -2,000.00 21 PRS RECD AUG 3,000.00 21 PRS RECD OCT 1,000.00 21 O/S PRS JAN -2,000.00 22 PRTL PRS RECD JUNE 7,000.00 22 PRTL PRS RECD DEC 1,000.00 22 O/S PRS FEB -1,000.00 23 PRS RECD DEC 1,000.00 23 PRTL PRS RECD JAN 1,000.00 23 PRTL PRS RECD JUNE 2,000.00 23 O/S PRS MARCH 10 -1,000.00 24 PRS RECD JUNE 09 1,000.00 24 O/S PRS APRIL -1,000.00 25 PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 3 DATE 05/25/11 EST. NO.39 TIME 11:25 AM R.E. NAME: RIZZUTTO, SHAWN 11-167884 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- O/S PRS MAY -1,000.00 26 PRS RECD FEB 1,000.00 26 O/S PRS JUNE -1,000.00 27 PRS RECD JAN 1,000.00 27 PRS RECD MARCH 1,000.00 27 PRS RECD APRIL 1,000.00 27 O/S PRS JULY -2,000.00 28 O/S PRS AUG -1,000.00 29 O/S PRS SEPT -1,000.00 31 O/S PRS OCT -1,000.00 32 PRS RECD JUNE 1,000.00 32 PRS RECD AUG 1,000.00 32 PRS RECD SEPT 1,000.00 32 O/S PRS NOV -2,000.00 33 PRS RECD JULY 2,000.00 33 O/S PRS DEC -2,000.00 35 PRS RECD MAY 1,000.00 35 O/S PRS JAN -2,000.00 36 PRS RECD NOV 10 2,000.00 36 PRTL PRS RECD DEC 10 1,000.00 36 O/S PRS FEB -3,000.00 37 O/S PRS MAR -3,000.00 38 PRS RECD OCT 10 1,000.00 38 O/S PRS APRIL 2011 -5,000.00 39 PRTL PRS RECD JAN 1,000.00 39 -4,000.00 -13,000.00 LIQUIDATED DAMAGES 8 DAYS OF LDS -90,400.00 37 8 DAYS OF LDS 90,400.00 38 0.00 0.00 TOTAL DEDUCTIONS -4,000.00 -428,915.37 PROGRAM CAS145 PAGE 1 DATE 05/25/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-167884 TIME 11:25 AM ESTIMATE NO. 39 BID OPENING 02/14/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/11 R.E. NAME: RIZZUTTO, SHAWN DATE OF THIS ESTIMATE 05/25/11 LOCATION PROGRESS ESTIMATE 11-IMP-78-R12.1/R15.2 ----------------- SKANSKA IN IMPERIAL COUNTY IN AND NEAR 861 MAIN STREET BRAWLEY ON ROUTE 78 AND ON OLD BRAWLEY,CA 92227 ROUTE 111 FED. AID NO. HPLU-6211(67)E CONSTRUCT FOUR-LANE EXPRESSWAY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 15,000.0000 15,000.00 0.925 13,875.00 02 TIME-RELATED OVERHEAD WDAY 3,600.0000 2,340,000.00 650.000 2,340,000.00 03 TEMPORARY FENCE (TYPE ESA) M 18.0000 21,060.00 1,225.820 22,064.76 04 PREPARE CODE OF SAFE WORKING PRACTICES LS 50,000.0000 50,000.00 0.750 37,500.00 05 CONSTRUCTION SITE MANAGEMENT LS 180,000.0000 180,000.00 0.966 173,880.00 06 PREPARE STORM WATER POLLUTION LS 6,700.0000 6,700.00 0.886 5,936.20 PREVENTION PLAN 07 TEMPORARY EROSION CONTROL M2 0.2500 78,250.00 247,581.300 61,895.33 08 TEMPORARY FIBER ROLL M 15.0000 99,300.00 5,512.900 82,693.50 09 TEMPORARY CONCRETE WASHOUT FACILITY EA 3,000.0000 21,000.00 7.000 21,000.00 10 TEMPORARY CONSTRUCTION ENTRANCE EA 9,000.0000 99,000.00 14.000 126,000.00 11 MOVE-IN/MOVE-OUT EA 900.0000 5,400.00 5.000 4,500.00 (TEMPORARY EROSION CONTROL) 12 STREET SWEEPING LS 100,000.0000 100,000.00 0.966 96,600.00 13 CONSTRUCTION AREA SIGNS LS 20,500.0000 20,500.00 0.786 16,113.00 S) 14 TRAFFIC CONTROL SYSTEM LS 107,000.0000 107,000.00 0.966 103,362.00 S) 15 TYPE III BARRICADE EA 265.0000 16,430.00 96.000 25,440.00 S) 16 TEMPORARY TRAFFIC STRIPE (TAPE) M 7.0000 6,650.00 0.000 0.00 S) 17 CHANNELIZER (SURFACE MOUNTED) EA 43.0000 1,290.00 30.000 1,290.00 S) (LEFT IN PLACE) 18 PORTABLE CHANGEABLE MESSAGE SIGN EA 14,000.0000 56,000.00 3.865 54,110.00 S) 19 TEMPORARY RAILING (TYPE K) M 45.0000 34,200.00 1,239.880 55,794.60 S) 20 TRAFFIC PLASTIC DRUM EA 103.0000 16,480.00 160.000 16,480.00 S) 21 TEMPORARY CRASH CUSHION MODULE EA 455.0000 12,740.00 28.000 12,740.00 S) 22 CUT AND CAP TILE DRAIN EA 255.0000 23,460.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 05/25/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-167884 TIME 11:25 AM ESTIMATE NO. 39 BID OPENING 02/14/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/11 R.E. NAME: RIZZUTTO, SHAWN DATE OF THIS ESTIMATE 05/25/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 ABANDON MANHOLE EA 1,350.0000 9,450.00 8.000 10,800.00 24 REMOVE FENCE M 13.0000 15,730.00 1,318.900 17,145.70 25 REMOVE BARRICADE EA 15.0000 300.00 20.000 300.00 26 REMOVE TRAFFIC STRIPE AND PAVEMENT M2 31.0000 6,200.00 21.830 676.73 579.770 17,972.87 S) MARKING 27 REMOVE CHANNELIZERS EA 22.0000 616.00 28.000 616.00 28 REMOVE ROADSIDE SIGN EA 120.0000 1,200.00 12.000 1,440.00 29 ADJUST MANHOLE COVER TO GRADE EA 1,350.0000 2,700.00 4.000 5,400.00 30 MODIFY MANHOLE EA 3,900.0000 7,800.00 4.000 15,600.00 31 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 8.0000 10,960.00 0.000 0.00 S) 32 REMOVE CONCRETE BARRIER (TYPE K) M 28.0000 3,920.00 134.200 3,757.60 33 CLEARING AND GRUBBING LS 140,000.0000 140,000.00 1.000 140,000.00 34 DEVELOP WATER SUPPLY LS 15,000.0000 15,000.00 0.983 14,745.00 35 ROADWAY EXCAVATION M3 5.0000 3,605,000.00 676,431.209 3,382,156.05 36 ROADWAY EXCAVATION (INFECTIOUS SUBSTANCE M3 220.0000 976,800.00 0.000 0.00 AND ORGANIC MATERIAL) 37 LEAD COMPLIANCE PLAN LS 10,000.0000 10,000.00 1.000 10,000.00 38 STRUCTURE EXCAVATION (BRIDGE) M3 25.0000 116,500.00 4,660.000 116,500.00 F) 39 STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 62.0000 4,030.00 65.000 4,030.00 F) 40 STRUCTURE BACKFILL (BRIDGE) M3 80.0000 208,000.00 2,600.000 208,000.00 F) 41 STRUCTURE BACKFILL (SOLDIER PILE WALL) M3 93.0000 1,860.00 20.000 1,860.00 F) 42 LEAN CONCRETE BACKFILL M3 222.0000 3,330.00 15.000 3,330.00 F) 43 IMPORTED BORROW M3 16.0000 9,088,000.00 559,497.309 8,951,956.94 44 EROSION CONTROL (TYPE D) M2 0.8500 96,900.00 141,644.000 120,397.40 S) 45 NPS 3 SUPPLY LINE (BRIDGE) M 315.0000 307,125.00 1,100.940 346,796.10 46 100 MM PLASTIC PIPE (PR 200) M 200.0000 5,400.00 30.500 6,100.00 SF)(SUPPLY LINE) 47 300 MM PVC (C900) M 245.0000 254,800.00 0.000 0.00 SF) 48 WATER METER EA 4,900.0000 4,900.00 1.000 4,900.00 S) 49 300 MM GATE VALVE EA 4,200.0000 42,000.00 4.000 16,800.00 S) PROGRAM CAS145 PAGE 3 DATE 05/25/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-167884 TIME 11:25 AM ESTIMATE NO. 39 BID OPENING 02/14/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/11 R.E. NAME: RIZZUTTO, SHAWN DATE OF THIS ESTIMATE 05/25/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 100 MM GATE VALVE EA 1,300.0000 1,300.00 1.000 1,300.00 S) 51 200 MM CORRUGATED HIGH DENSITY M 100.0000 62,000.00 642.980 64,298.00 S) POLYETHYLENE PIPE CONDUIT 52 FINISHING ROADWAY LS 15,500.0000 15,500.00 0.200 3,100.00 0.800 12,400.00 53 CLASS 4 AGGREGATE SUBBASE M3 40.0000 4,400,000.00 111,192.420 4,447,696.80 54 CLASS 2 AGGREGATE BASE M3 53.0000 2,332,000.00 44,338.500 2,349,940.50 55 ASPHALTIC EMULSION (FOG SEAL COAT) TONN 1,100.0000 6,600.00 5.200 5,720.00 56 ASPHALT CONCRETE (TYPE A) TONN 78.0000 943,800.00 14,361.210 1,120,174.38 57 ASPHALT CONCRETE BASE (TYPE A) TONN 71.0000 3,400,900.00 52,981.940 3,761,717.74 58 PLACE ASPHALT CONCRETE DIKE M 9.0000 43,470.00 4,542.884 40,885.96 59 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 26.0000 28,080.00 1,006.800 26,176.80 AREA) 60 ASPHALTIC EMULSION (PAINT BINDER) TONN 1,170.0000 7,020.00 74.900 87,633.00 61 CONCRETE PAVEMENT M3 210.0000 6,405,000.00 31,946.470 6,708,758.70 62 SHOULDER RUMBLE STRIP STA 950.0000 77,900.00 82.000 77,900.00 (PCC, GROUND-IN INDENTATIONS) 63 SEAL PAVEMENT JOINT M 3.7500 167,625.00 53,651.500 201,193.13 64 DRILLED HOLE (600 MM) M 355.0000 63,900.00 180.000 63,900.00 S) 65 STEEL SOLDIER PILE (W250 X 131) M 245.0000 44,100.00 180.000 44,100.00 S) 66 FURNISH STEEL PIPE PILING (406 MM) M 355.0000 793,425.00 2,236.200 793,851.00 67 DRIVE STEEL PIPE PILE (406 MM) EA 1,600.0000 192,000.00 120.000 192,000.00 S) 68 FURNISH PILING (CLASS 625) M 105.0000 969,150.00 9,202.733 966,286.97 69 DRIVE PILE (CLASS 625) EA 1,600.0000 888,000.00 555.000 888,000.00 S) 70 FURNISH CAST-IN-STEEL-SHELL CONCRETE M 610.0000 749,080.00 1,226.680 748,274.80 PILING (610 MM) 71 DRIVE CAST-IN-STEEL-SHELL CONCRETE EA 5,900.0000 330,400.00 56.000 330,400.00 S) PILE (610 MM) 72 FURNISH CAST-IN-STEEL-SHELL CONCRETE M 1,200.0000 787,200.00 655.280 786,336.00 PILING (1219 MM) 73 DRIVE CAST-IN-STEEL-SHELL CONCRETE EA 41,000.0000 656,000.00 16.000 656,000.00 S) PILE (1219 MM) 74 PRESTRESSING CAST-IN-PLACE CONCRETE LS 400,000.0000 400,000.00 1.000 400,000.00 S) 75 STRUCTURAL CONCRETE M3 1,200.0000 42,000.00 35.000 42,000.00 F) 76 STRUCTURAL CONCRETE, BRIDGE FOOTING M3 345.0000 536,475.00 1,555.000 536,475.00 F) PROGRAM CAS145 PAGE 4 DATE 05/25/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-167884 TIME 11:25 AM ESTIMATE NO. 39 BID OPENING 02/14/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/11 R.E. NAME: RIZZUTTO, SHAWN DATE OF THIS ESTIMATE 05/25/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 77 STRUCTURAL CONCRETE, BRIDGE M3 880.0000 5,755,200.00 6,540.000 5,755,200.00 F) 78 STRUCTURAL CONCRETE, APPROACH SLAB M3 875.0000 542,500.00 626.200 547,925.00 F) (TYPE N) 79 CLASS 1 CONCRETE (BACKFILL) M3 450.0000 18,000.00 40.000 18,000.00 F) 80 MINOR CONCRETE (MINOR STRUCTURE) M3 2,500.0000 235,000.00 5.381 13,452.50 125.770 314,425.00 F) 81 ARCHITECTURAL TREATMENT M2 650.0000 52,000.00 80.000 52,000.00 F) 82 FURNISH PRECAST PRESTRESSED CONCRETE EA 28,000.0000 672,000.00 24.000 672,000.00 S) GIRDER (25 M - 30 M) 83 FURNISH PRECAST PRESTRESSED CONCRETE EA 34,000.0000 408,000.00 12.000 408,000.00 S) GIRDER (30 M - 35 M) 84 ERECT PRECAST PRESTRESSED CONCRETE EA 8,200.0000 295,200.00 36.000 295,200.00 S) GIRDER 85 PREMANUFACTURED BAT HOUSE EA 850.0000 5,100.00 6.000 5,100.00 S) 86 JOINT SEAL (MR 40 MM) M 310.0000 54,870.00 171.870 53,279.70 S) 87 JOINT SEAL (MR 50 MM) M 355.0000 17,040.00 48.160 17,096.80 S) 88 BAR REINFORCING STEEL KG 3.0000 9,000.00 3,000.000 9,000.00 SF) 89 BAR REINFORCING STEEL (BRIDGE) KG 1.9000 2,794,900.00 1,471,000.000 2,794,900.00 SF) 90 FURNISH SINGLE SHEET ALUMINUM SIGN M2 130.0000 7,020.00 49.600 6,448.00 (1.6 MM-UNFRAMED) 91 FURNISH SINGLE SHEET ALUMINUM SIGN M2 150.0000 1,650.00 29.200 4,380.00 (2.0 MM-UNFRAMED) 92 FURNISH SINGLE SHEET ALUMINUM SIGN M2 175.0000 3,850.00 6.600 1,155.00 (1.6 MM-FRAMED) 93 FURNISH SINGLE SHEET ALUMINUM SIGN M2 190.0000 8,170.00 37.100 7,049.00 (2.0 MM-FRAMED) 94 INSTALL SIGN PANEL ON BARRICADE EA 57.0000 456.00 8.000 456.00 95 ROADSIDE SIGN - ONE POST EA 440.0000 25,960.00 57.000 25,080.00 96 ROADSIDE SIGN - TWO POST EA 1,250.0000 11,250.00 9.000 11,250.00 97 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 115.0000 115.00 1.000 115.00 METHOD) 98 INSTALL ROADSIDE SIGN PANEL ON EA 115.0000 690.00 2.000 230.00 EXISTING POST 99 TIMBER LAGGING M3 4,000.0000 28,000.00 7.000 28,000.00 SF) 00 CLEAN AND PAINT STEEL SOLDIER PILE LS 15,000.0000 15,000.00 1.000 15,000.00 S) 01 PREPARE AND STAIN CONCRETE M2 280.0000 2,240.00 0.000 0.00 S) 02 300 MM ALTERNATIVE PIPE CULVERT M 300.0000 27,900.00 101.000 30,300.00 03 450 MM ALTERNATIVE PIPE CULVERT M 250.0000 207,500.00 858.000 214,500.00 PROGRAM CAS145 PAGE 5 DATE 05/25/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-167884 TIME 11:25 AM ESTIMATE NO. 39 BID OPENING 02/14/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/11 R.E. NAME: RIZZUTTO, SHAWN DATE OF THIS ESTIMATE 05/25/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 04 600 MM ALTERNATIVE PIPE CULVERT M 262.0000 251,520.00 1,071.200 280,654.40 05 900 MM ALTERNATIVE PIPE CULVERT M 260.0000 218,400.00 847.000 220,220.00 06 1050 MM ALTERNATIVE PIPE CULVERT M 295.0000 79,650.00 267.000 78,765.00 07 450 MM REINFORCED CONCRETE PIPE M 230.0000 1,150.00 3.660 841.80 08 PREFABRICATED VERTICAL DRAIN M 3.0000 390,300.00 138,900.000 416,700.00 09 PERMEABLE MATERIAL (BLANKET) M3 93.0000 2,399,400.00 25,800.000 2,399,400.00 F) 10 600 MM WELDED STEEL PIPE CASING (BRIDGE) M 460.0000 103,500.00 225.000 103,500.00 11 600 MM ALTERNATIVE FLARED END SECTION EA 1,070.0000 11,770.00 11.000 11,770.00 12 900 MM PRECAST CONCRETE PIPE RISER M 1,350.0000 36,450.00 1.000 1,350.00 25.855 34,904.25 13 200 MM POLYVINYL CHLORIDE SEWER PIPE M 192.0000 23,040.00 296.700 56,966.40 S) 14 450 MM SEWER PIPE M 225.0000 306,000.00 1,341.920 301,932.00 S) 15 525 MM SEWER PIPE M 396.0000 170,280.00 428.200 169,567.20 S) 16 SEWER MANHOLE CAST-IN PLACE 1500 MM X EA 6,450.0000 38,700.00 20.200 130,290.00 S) 900 MM (INCLUDES FRAME AND COVER) 17 900 MM SEWER MANHOLE EA 5,200.0000 72,800.00 0.000 0.00 S) 18 ROCK SLOPE PROTECTION M3 124.0000 89,280.00 1,281.800 158,943.20 (BACKING NO. 2, METHOD B) 19 ROCK SLOPE PROTECTION (1T, METHOD B) M3 159.0000 278,250.00 3,180.000 505,620.00 20 ROCK SLOPE PROTECTION (1/4T, METHOD B) M3 94.0000 164,500.00 3,141.100 295,263.40 21 SLOPE PAVING (STAMPED CONCRETE) M2 92.0000 183,080.00 1,990.000 183,080.00 F) 22 SLOPE PAVING (CONCRETE) M3 515.0000 172,525.00 335.000 172,525.00 F) 23 ROCK SLOPE PROTECTION FABRIC M2 20.0000 79,400.00 3,256.100 65,122.00 24 MINOR CONCRETE (MISCELLANEOUS M3 1,000.0000 14,000.00 30.900 30,900.00 CONSTRUCTION) 25 MINOR CONCRETE (GUTTER) M 88.0000 3,960.00 45.000 3,960.00 F) 26 MISCELLANEOUS IRON AND STEEL KG 3.0000 48,099.00 59.000 177.00 18,230.000 54,690.00 SF) 27 BRIDGE DECK DRAINAGE SYSTEM KG 20.0000 25,400.00 1,270.000 25,400.00 SF) 28 FENCE (TYPE BW, 4-STRAND, METAL POST) M 15.0000 114,600.00 610.940 9,164.10 4,606.451 69,096.77 S) 29 CHAIN LINK FENCE (TYPE CL-1.8) M 45.0000 168,750.00 1,731.300 77,908.50 6,695.580 301,301.10 S) 30 CHAIN LINK FENCE (TYPE CL-2.4)(MOD) M 88.0000 96,800.00 740.380 65,153.44 740.380 65,153.44 S) PROGRAM CAS145 PAGE 6 DATE 05/25/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-167884 TIME 11:25 AM ESTIMATE NO. 39 BID OPENING 02/14/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/11 R.E. NAME: RIZZUTTO, SHAWN DATE OF THIS ESTIMATE 05/25/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 31 2.4 M WIRE MESH GATE EA 1,510.0000 13,590.00 0.000 0.00 S) 32 2.4 M CHAIN LINK GATE (TYPE CL-1.8) EA 1,200.0000 15,600.00 0.000 0.00 S) 33 DELINEATOR (CLASS 1) EA 50.0000 4,400.00 175.000 8,750.00 34 KILOMETER POST MARKER EA 85.0000 680.00 0.000 0.00 35 GUARD RAILING DELINEATOR EA 19.0000 9,120.00 507.000 9,633.00 36 METAL BEAM GUARD RAILING M 75.0000 265,500.00 3,928.270 294,620.25 S) 37 CHAIN LINK RAILING (TYPE 7 MODIFIED) M 225.0000 92,250.00 410.000 92,250.00 SF) 38 CONCRETE BARRIER (TYPE K) M 110.0000 19,800.00 115.822 12,740.42 S) 39 CABLE RAILING M 120.0000 7,800.00 6.350 762.00 64.650 7,758.00 SF) 40 TRANSITION RAILING (TYPE WB) EA 3,800.0000 60,800.00 16.000 60,800.00 S) 41 END CAP (TYPE A) EA 600.0000 6,000.00 9.000 5,400.00 S) 42 RAIL TENSIONING ASSEMBLY EA 555.0000 5,550.00 10.000 5,550.00 S) 43 END ANCHOR ASSEMBLY (TYPE SFT) EA 690.0000 4,830.00 8.000 5,520.00 S) 44 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,600.0000 15,600.00 5.000 13,000.00 S) 45 CRASH CUSHION (QUADGUARD ELITE) EA 66,000.0000 66,000.00 0.000 0.00 S) 46 CRASH CUSHION (TYPE CAT) EA 5,200.0000 52,000.00 10.000 52,000.00 S) 47 CRASH CUSHION (TYPE CAT) BACKUP EA 350.0000 3,500.00 10.000 3,500.00 S) 48 CRASH CUSHION (REACT 9CBB) EA 62,000.0000 124,000.00 2.000 124,000.00 S) 49 CONCRETE BARRIER (TYPE 60C) M 590.0000 241,900.00 403.900 238,301.00 50 CONCRETE BARRIER (TYPE 732) M 224.0000 412,832.00 1,843.000 412,832.00 F) 51 CONCRETE BARRIER (TYPE 732B) M 512.0000 19,456.00 32.000 16,384.00 52 THERMOPLASTIC PAVEMENT MARKING M2 43.0000 18,490.00 34.750 1,494.25 512.770 22,049.11 S) 53 200 MM THERMOPLASTIC TRAFFIC STRIPE M 2.0000 5,720.00 2,771.000 5,542.00 2,991.800 5,983.60 S) 54 200 MM THERMOPLASTIC TRAFFIC STRIPE M 2.0000 500.00 414.000 828.00 414.000 828.00 S) (BROKEN 3.66 M - 0.92 M) 55 PAINT TRAFFIC STRIPE (2-COAT) M 0.5000 19,100.00 2,955.000 1,477.50 43,872.400 21,936.20 S) 56 PAVEMENT MARKER (NON-REFLECTIVE) EA 1.2500 3,175.00 12.000 15.00 2,522.000 3,152.50 S) 57 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.4500 5,831.00 115.000 281.75 2,437.000 5,970.65 S) PROGRAM CAS145 PAGE 7 DATE 05/25/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-167884 TIME 11:25 AM ESTIMATE NO. 39 BID OPENING 02/14/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/11 R.E. NAME: RIZZUTTO, SHAWN DATE OF THIS ESTIMATE 05/25/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 58 SIGNAL AND LIGHTING (LOCATION 1) LS 200,000.0000 200,000.00 1.000 200,000.00 S) 59 SIGNAL AND LIGHTING (LOCATION 2) LS 195,000.0000 195,000.00 1.000 195,000.00 S) 60 LIGHTING LS 188,000.0000 188,000.00 1.000 188,000.00 S) 61 FLASHING BEACON LS 45,000.0000 45,000.00 1.000 45,000.00 S) 62 LIGHTING CONDUIT (BRIDGE) M 50.0000 52,000.00 958.000 47,900.00 S) 63 SPRINKLER CONTROL CONDUIT (BRIDGE) M 50.0000 48,750.00 975.000 48,750.00 SF) 64 TRAFFIC MONITORING STATION (LOCATION 1) LS 55,000.0000 55,000.00 0.020 1,100.00 1.000 55,000.00 S) 65 TRAFFIC MONITORING STATION (LOCATION 2) LS 28,500.0000 28,500.00 0.020 570.00 1.000 28,500.00 S) 66 FIRE HYDRANT EA 830.0000 1,660.00 1.000 830.00 67 150 MM FIRE HYDRANT ASSEMBLY EA 5,100.0000 10,200.00 1.000 5,100.00 68 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 69 IRRIGATION SYSTEM LS 265,000.0000 265,000.00 1.000 265,000.00 S) 70 HIGHWAY PLANTING LS 147,000.0000 147,000.00 1.000 147,000.00 S) 71 PLANT ESTABLISHMENT WORK LS 44,000.0000 44,000.00 1.000 44,000.00 S) 72 INFORMATION SIGN EA 1,700.0000 1,700.00 1.000 1,700.00 73 HABITAT RESTORATION SIGN EA 500.0000 3,500.00 7.000 3,500.00 74 TUBULAR STEEL GATE EA 2,500.0000 2,500.00 1.000 2,500.00 PROGRAM CAS145 PAGE 8 DATE 05/25/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-167884 TIME 11:25 AM ESTIMATE NO. 39 BID OPENING 02/14/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/11 R.E. NAME: RIZZUTTO, SHAWN DATE OF THIS ESTIMATE 05/25/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 183,052.77 62,148,691.02 ADJUSTMENT OF COMPENSATION 0.00 771,684.14 EXTRA WORK 38,998.46 2,037,886.48 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 222,051.23 64,958,261.64 75 MOBILIZATION LS 6500,000.0000 6,500,000.00 1.000 6,500,000.00 ORIGINAL CONTRACT AMOUNT 68,613,955.00 TOTAL WORK COMPLETED 222,051.23 71,458,261.64 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -4,000.00 -428,915.37 TOTAL 218,051.23 71,029,346.27 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 03/27/08 900 06/16/08 05/21/08 05/27/11 649 36 10 0 PLANT ESTABLISHMENT PERI PROGRESS IS SATISFACTORY UNSATIS PROGRESS OVERRIDEN BECAU PENDING DEFERRED TIME CC RIZZUTTO, SHAWN RESIDENT ENGINEER PROGRAM CAS145 DATE 05/25/11