PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/22/02 EST. NO.19 TIME 02:20 PM R.E. NAME: GAYON, ALBERTO 11-1993U4 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0088 367.73 E.W. @ F.A.(+) 010902 N 000142 004 1007 900.00 A.C. @ U.P.(+) 020702 N 007 0 011 1011 1,200.68 A.C. @ U.P.(+) 032002 N 0011 0 025 0001 -1,750.00 A.C. @ L.S.(-) 031402 N 0001 0 027 1001 3,957.47 E.W. @ F.A.(+) 111401 N 000093 1004 4,693.01 111601 N 000108 1006 373.14 120501 N 000111 1007 265.74 121001 N 000112 1010 30.50 120501 N 001290 028 1002-3 -2,179.89 E.W. @ F.A.(+) 080601 N 000077 DAO CORRECTING ENTRY 1002-4 2,599.79 080601 N 000077 DAO CORRECTING ENTRY 032 0001 3,661.21 A.C. @ L.S.(+) 083101 N 0001 0 037 0001 744.63 A.C. @ L.S.(+) 011402 N 0001 0 040 0001 9,778.65 E.W. @ L.S.(+) 010702 N 0001 0 24,642.66 TOTAL THIS ESTIMATE -7,280.41 TOTAL PREVIOUS ESTIMATE 17,362.25 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/22/02 EST. NO.19 TIME 02:20 PM R.E. NAME: GAYON, ALBERTO 11-1993U4 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE GRANITE CERTS (8&14) -4,000.00 03 K-RAIL -1,000.00 03 SUDHAKER CERTS (VAR) -2,336.46 03 EMULSION CERT -195.00 04 GRANITE CERTS (14) 1,000.00 04 K-RAIL 1,000.00 04 SUDHAKER CERTS (VAR) 336.46 04 EMULSION CERT (41) -390.00 05 ITEM 11, WHITE PAINT -80.64 05 GRANITE CERTS (8) 2,000.00 06 ITEM 11, WHITE PAINT -20.05 06 SUDHAKER CERTS (VAR) 1,000.00 06 MAVERICK-COST BRKDN -10,000.00 07 MAVERICK CERT PVC -1,000.00 08 SUDHAKER CERT (16) 1,000.00 08 AC BASE RC -1,337.74 09 AC(A) RC -653.69 09 DBE SUBSTITUTION -935.75 09 MAVERICK CERT PVC 1,000.00 09 MAVERICK COST BRKDN 10,000.00 09 EMULSION CERT 585.00 10 GRANITE CERT (8) 1,000.00 10 DBE SUBSTITUTION 935.75 11 AC BASE/GRAD -228.21 12 RESTAKING CHARGE -400.00 12 CL2/GRAD -1,200.00 14 FILTER FABRIC CERT -1,000.00 15 ITEM 34 CERT -1,000.00 15 ITEM 75-81 4" PVC -6,613.02 15 COFFMAN, MATERIAL -8,712.00 16 GRANITE, MATERIALS -12,594.90 16 COFFMAN MATERIAL -30,409.20 17 CLE/GRAD -30,800.00 18 FILTER FABRIC CERT 1,000.00 18 ITEM 75-81 4" PVC 6,613.02 18 PCCP CLEANNESS -1,150.00 18 CURING COMPOUND -888.25 19 EQUIPMENT LISTS -6,000.00 19 JOINT SEAL -10,000.00 19 PCCP CLEANNESS -1,150.00 19 -18,038.25 -106,624.68 EQUAL EMPLOYMENT OPPORTUNITY O/S EEO DOCS -10,000.00 11 DOCS RECD 10,000.00 12 0.00 0.00 LABOR COMPLIANCE VIOLATION O/S PRS JAN -10,000.00 04 PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 2 DATE 03/22/02 EST. NO.19 TIME 02:20 PM R.E. NAME: GAYON, ALBERTO 11-1993U4 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- O/S PRS FEB -10,000.00 05 PRS RECD JAN 10,000.00 05 O/S PRS MARCH -10,000.00 06 O/S PRS APRIL -10,000.00 08 O/S PRS MAY -10,000.00 09 PRS RECD APRIL 10,000.00 09 O/S PRS JUNE -10,000.00 10 PRS RECD MAY 10,000.00 10 O/S PRS JULY -10,000.00 11 PRS RECD FEB 10,000.00 11 O/S PRS AUGUST -10,000.00 12 PRS RECD MARCH 10,000.00 12 O/S PRS SEPT -10,000.00 13 O/S PRS OCT -10,000.00 14 PRS RECD JULY 10,000.00 14 O/S PRS NOV -10,000.00 15 O/S PRS DEC -10,000.00 16 O/S PRS JAN -10,000.00 18 PRS RECD AUG 10,000.00 18 PRS RECD JUNE 01 10,000.00 18 O/S PRS FEB -10,000.00 19 -10,000.00 -60,000.00 TOTAL DEDUCTIONS -28,038.25 -166,624.68 PROGRAM CAS145 PAGE 1 DATE 03/22/02 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-1993U4 TIME 02:20 PM ESTIMATE NO. 19 BID OPENING 08/24/00 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/02 R.E. NAME: GAYON, ALBERTO DATE OF THIS ESTIMATE 03/22/02 LOCATION PROGRESS ESTIMATE 11-IMP-111-R8.0/R12.9 ----------------- GRANITE CONSTRUCTION CO. IN IMPERIAL COUNTY NEAR EL CENTRO 2095 HIGHWAY 111 FROM 0.3 KM SOUTH OF ROSS ROAD TO EL CENTRO,CA 92243 TO 0.1 KM NORTH OF WORTHINGTON ROAD FED. AID NO. ACNH-P111(60)E CONSTRUCT 4 LANE EXPRESSWAY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 001 PROGRESS SCHEDULE (CRITICAL PATH) LS 79,000.0000 79,000.00 0.750 59,250.00 002 PREPARE STORM WATER POLLUTION PREVENTION LS 6,200.0000 6,200.00 0.750 4,650.00 PLAN 003 WATER POLLUTION CONTROL LS 33,000.0000 33,000.00 0.044 1,452.00 0.683 22,539.00 004 TEMPORARY GRAVEL BAG EA 20.0000 22,000.00 0.000 0.00 005 TEMPORARY CONCRETE WASHOUT EA 1,500.0000 7,500.00 3.000 4,500.00 4.000 6,000.00 006 TEMPORARY CONSTRUCTION ENTRANCE EA 15,000.0000 90,000.00 6.000 90,000.00 007 CONSTRUCTION AREA SIGNS LS 55,000.0000 55,000.00 0.013 715.00 0.665 36,575.00 008 TRAFFIC CONTROL SYSTEM LS 61,000.0000 61,000.00 0.044 2,684.00 0.683 41,663.00 009 TYPE III BARRICADE EA 115.0000 12,650.00 115.000 13,225.00 (S) 010 TEMPORARY PAVEMENT MARKING (PAINT) M2 88.0000 11,440.00 140.154 12,333.55 (S) 011 TEMPORARY TRAFFIC STRIPE (PAINT) M 1.1000 10,010.00 10,306.340 11,336.97 (S) 012 CHANNELIZER (SURFACE MOUNTED) EA 38.5000 847.00 50.000 1,925.00 (S) 013 CHANNELIZER (SURFACE MOUNTED) EA 40.0000 960.00 0.000 0.00 (S) (LEFT IN PLACE) 014 TRAFFIC PLASTIC DRUMS EA 50.0000 12,500.00 248.000 12,400.00 (S) 015 FLASHING BEACON (PORTABLE) EA 1,800.0000 10,800.00 6.000 10,800.00 (S) 016 TEMPORARY PAVEMENT MARKER EA 5.5000 4,620.00 752.000 4,136.00 (S) 017 PORTABLE CHANGEABLE MESSAGE SIGN EA 14,000.0000 56,000.00 0.173 2,422.00 2.730 38,220.00 (S) 018 TEMPORARY RAILING (TYPE K) M 31.4000 103,620.00 2,866.800 90,017.52 (S) 019 TEMPORARY CRASH CUSHION MODULE EA 137.0000 24,660.00 169.000 23,153.00 (S) 020 ABANDON PIPELINE M 40.0000 18,000.00 375.000 15,000.00 021 REMOVE METAL BEAM GUARD RAILING M 15.0000 525.00 62.000 930.00 022 REMOVE TRAFFIC STRIPE AND PAVEMENT M2 8.8000 4,664.00 21.260 187.09 443.991 3,907.12 MARKING PROGRAM CAS145 PAGE 2 DATE 03/22/02 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-1993U4 TIME 02:20 PM ESTIMATE NO. 19 BID OPENING 08/24/00 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/02 R.E. NAME: GAYON, ALBERTO DATE OF THIS ESTIMATE 03/22/02 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 023 REMOVE ROADSIDE SIGN EA 71.0000 1,562.00 0.000 0.00 024 REMOVE ASPHALT CONCRETE SURFACING M3 26.0000 10,660.00 694.306 18,051.96 025 RECONSTRUCT METAL BEAM GUARD RAILING M 14.0000 490.00 0.000 0.00 026 RESET ROADSIDE SIGN EA 272.0000 10,880.00 5.000 1,360.00 027 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 1.0000 19,800.00 6,380.000 6,380.00 (S) (45 MM MAXIMUM) 028 REMOVE RAILROAD TRACKS AND PEDESTAL M 170.0000 8,500.00 0.000 0.00 029 CLEARING AND GRUBBING HA 5,000.0000 250,000.00 60.196 300,980.00 030 DEVELOP WATER SUPPLY LS 20,000.0000 20,000.00 0.044 880.00 0.683 13,660.00 031 ROADWAY EXCAVATION M3 3.0000 810,000.00 16,416.730 49,250.19 281,437.770 844,313.31 032 IMPORTED BORROW M3 15.5000 1162,500.00 -18,139.650 -281,164.58 91,215.350 1,413,837.93 033 TRANSPLANT PALM TREE EA 1,000.0000 24,000.00 0.960 960.00 19.104 19,104.00 (S) 034 200 MM CORRUGATED HIGH DENSITY M 300.0000 270,000.00 764.000 229,200.00 (S) POLYETHYLENE PIPE CONDUIT 035 FINISHING ROADWAY LS 10,000.0000 10,000.00 0.000 0.00 036 CLASS 5 AGGREGATE SUBBASE M3 15.5000 1720,500.00 111,374.490 1,726,304.60 037 CLASS 2 AGGREGATE BASE M3 22.0000 1432,200.00 61,299.452 1,348,587.94 038 ASPHALT CONCRETE (TYPE A) TONN 46.0000 473,800.00 758.700 34,900.20 8,276.370 380,713.02 039 ASPHALT CONCRETE BASE (TYPE A) TONN 42.0000 3171,000.00 537.360 22,569.12 70,202.890 2,948,521.38 040 PLACE ASPHALT CONCRETE DIKE M 1.0000 1,200.00 0.000 0.00 041 ASPHALTIC EMULSION TONN 1,500.0000 1,500.00 0.390 585.00 (FOG SEAL COAT AND PAINT BINDER) 042 CONCRETE PAVEMENT M3 72.0000 3506,400.00 2,302.000 165,744.00 47,970.490 3,453,875.28 043 SEAL PAVEMENT JOINT M 4.0000 355,600.00 54,740.000 218,960.00 78,854.000 315,416.00 044 MINOR CONCRETE (MINOR STRUCTURE) M3 2,100.0000 58,800.00 27.260 57,246.00 (F) 045 MINOR CONCRETE (BACKFILL) M3 150.0000 3,000.00 0.000 0.00 046 ROADSIDE SIGN - ONE POST EA 165.0000 8,910.00 0.000 0.00 047 ROADSIDE SIGN - TWO POST EA 275.0000 2,200.00 0.000 0.00 048 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 330.0000 1,320.00 0.000 0.00 METHOD) 049 INSTALL ROADSIDE SIGN PANEL ON EA 100.0000 1,000.00 0.000 0.00 EXISTING POST PROGRAM CAS145 PAGE 3 DATE 03/22/02 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-1993U4 TIME 02:20 PM ESTIMATE NO. 19 BID OPENING 08/24/00 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/02 R.E. NAME: GAYON, ALBERTO DATE OF THIS ESTIMATE 03/22/02 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 050 300 MM ALTERNATIVE PIPE CULVERT M 73.0000 15,330.00 216.000 15,768.00 051 450 MM ALTERNATIVE PIPE CULVERT M 87.0000 2,262.00 26.000 2,262.00 052 600 MM ALTERNATIVE PIPE CULVERT M 108.0000 54,000.00 485.000 52,380.00 053 300 MM BITUMINOUS COATED CORRUGATED M 105.0000 315.00 0.000 0.00 STEEL PIPE DOWNDRAIN (2.01 MM THICK) 054 ENTRANCE TAPER EA 2,100.0000 2,100.00 0.000 0.00 055 300 MM ALTERNATIVE FLARED END SECTION EA 800.0000 2,400.00 2.000 1,600.00 056 450 MM POLYVINYL CHLORIDE PIPE M 105.0000 47,250.00 420.090 44,109.45 (S) 057 300 MM CORRUGATED HIGH DENSITY M 82.0000 8,200.00 38.000 3,116.00 POLYETHYLENE PIPE 058 380 MM CORRUGATED HIGH DENSITY M 158.0000 28,440.00 172.000 27,176.00 (S) POLYETHYLENE PIPE 059 ROCK SLOPE PROTECTION M3 150.0000 3,300.00 0.000 0.00 (FACING, METHOD B) 060 CONCRETE (SLOPE PROTECTION) M3 500.0000 18,000.00 0.000 0.00 (S) 061 MISCELLANEOUS IRON AND STEEL KG 3.0000 4,845.00 1,615.000 4,845.00 (SF) 062 FENCE (TYPE BW, 4-STRAND, METAL POST) M 6.6000 100,320.00 0.000 0.00 (S) 063 KILOMETER POST MARKER EA 165.0000 1,980.00 0.000 0.00 064 DELINEATOR (CLASS 1) EA 40.0000 8,000.00 0.000 0.00 065 CONCRETE BARRIER (TYPE K) M 94.0000 7,520.00 0.000 0.00 066 CABLE RAILING M 75.0000 2,250.00 0.000 0.00 (S) 067 CABLE ANCHOR ASSEMBLY EA 1,400.0000 1,400.00 0.000 0.00 (S) (BREAKAWAY, TYPE B) 068 TERMINAL SYSTEM (TYPE ET) EA 1,400.0000 1,400.00 0.000 0.00 (S) 069 TERMINAL SYSTEM (TYPE SRT) EA 1,400.0000 2,800.00 0.000 0.00 (S) 070 THERMOPLASTIC PAVEMENT MARKING M2 38.0000 20,140.00 0.000 0.00 (S) 071 200 MM THERMOPLASTIC TRAFFIC STRIPE M 3.8500 8,855.00 0.000 0.00 (S) 072 PAINT TRAFFIC STRIPE (2-COAT) M 0.8000 74,240.00 8,505.890 6,804.71 (S) 073 PAVEMENT MARKER (NON-REFLECTIVE) EA 2.2000 9,240.00 76.000 167.20 (S) 074 PAVEMENT MARKER (REFLECTIVE) EA 4.4000 12,320.00 56.000 246.40 (S) 075 SIGNAL AND LIGHTING (LOCATION 1) LS 130,000.0000 130,000.00 0.040 5,200.00 0.440 57,200.00 (S) PROGRAM CAS145 PAGE 4 DATE 03/22/02 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-1993U4 TIME 02:20 PM ESTIMATE NO. 19 BID OPENING 08/24/00 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/02 R.E. NAME: GAYON, ALBERTO DATE OF THIS ESTIMATE 03/22/02 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 076 SIGNAL AND LIGHTING (LOCATION 2) LS 165,000.0000 165,000.00 0.300 49,500.00 (S) 077 SIGNAL AND LIGHTING (LOCATION 3) LS 90,000.0000 90,000.00 0.530 47,700.00 (S) 078 SIGNAL AND LIGHTING (LOCATION 4) LS 135,000.0000 135,000.00 0.060 8,100.00 0.420 56,700.00 (S) 079 SIGNAL AND LIGHTING (LOCATION 5) LS 102,000.0000 102,000.00 0.020 2,040.00 0.450 45,900.00 (S) 080 SIGNAL AND LIGHTING (LOCATION 6) LS 143,000.0000 143,000.00 0.080 11,440.00 0.390 55,770.00 (S) 081 SIGNAL AND LIGHTING (LOCATION 7) LS 122,000.0000 122,000.00 0.140 17,080.00 0.510 62,220.00 (S) PROGRAM CAS145 PAGE 5 DATE 03/22/02 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-1993U4 TIME 02:20 PM ESTIMATE NO. 19 BID OPENING 08/24/00 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/02 R.E. NAME: GAYON, ALBERTO DATE OF THIS ESTIMATE 03/22/02 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 267,919.02 14,109,662.34 ADJUSTMENT OF COMPENSATION 4,756.52 -79,525.00 EXTRA WORK 19,886.14 96,887.25 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 292,561.68 14,127,024.59 082 MOBILIZATION LS 374,061.0000 374,061.00 1.000 374,061.00 ORIGINAL CONTRACT AMOUNT 15,658,786.00 TOTAL WORK COMPLETED 292,561.68 14,501,085.59 MATERIALS ON HAND ON SITE 206,707.79 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -28,038.25 -166,624.68 TOTAL 264,523.43 14,541,168.70 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 09/21/00 460 11/30/00 10/06/00 10/18/02 314 45 0 0 89% 68% PROGRESS IS SATISFACTORY GAYON, ALBERTO RESIDENT ENGINEER PROGRAM CAS145 PAGE 11 DATE 03/22/02