PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/21/01 EST. NO.03 TIME 02:12 PM R.E. NAME: AL-JAFRI, ABU-BAKR 11-229114 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/21/01 EST. NO.03 TIME 02:12 PM R.E. NAME: AL-JAFRI, ABU-BAKR 11-229114 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION O/S PRS MAY -8,528.02 03 -8,528.02 -8,528.02 TOTAL DEDUCTIONS -8,528.02 -8,528.02 PROGRAM CAS145 PAGE 1 DATE 06/21/01 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-229114 TIME 02:12 PM ESTIMATE NO. 03 BID OPENING 09/28/00 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/01 R.E. NAME: AL-JAFRI, ABU-BAKR DATE OF THIS ESTIMATE 06/21/01 LOCATION PROGRESS ESTIMATE 11-SD-8-10.5/R21.8 ----------------- HAZARD CONSTRUCTION COMPANY/ IN SAN DIEGO COUNTY IN LA MESA AND PAVEMENT SPECIALISTS, INC. EL CAJON FROM 0.2 KM WEST OF ATT: DONALD GLADDEN FLETCHER PARKWAY OVERCROSSING TO P.O. BOX 229000 LAKE JENNINGS PARK ROAD SAN DIEGO,CA 92192-9000 UNDERCROSSING FED. AID NO. ACIM-008 -1(295)10E SLAB REPLACEMENT AND JOINT SEALS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 001 PROGRESS SCHEDULE (CRITICAL PATH) LS 8,000.0000 8,000.00 0.000 0.00 002 TIME-RELATED OVERHEAD WDAY 1,100.0000 291,500.00 12.000 13,200.00 12.000 13,200.00 003 TEMPORARY SAND BAG EA 1.0000 800.00 0.000 0.00 (S) 004 TEMPORARY GRAVEL BAG EA 1.5000 1,080.00 0.000 0.00 (S) 005 CONSTRUCTION AREA SIGNS LS 38,000.0000 38,000.00 0.425 16,150.00 0.825 31,350.00 006 TRAFFIC CONTROL SYSTEM LS 250,000.0000 250,000.00 0.049 12,250.00 0.049 12,250.00 007 TEMPORARY TRAFFIC STRIPE (TAPE) M 4.0000 44,800.00 0.000 0.00 (S) 008 TRAFFIC PLASTIC DRUM EA 73.0000 1,241.00 0.000 0.00 (S) 009 TEMPORARY PAVEMENT MARKER EA 2.0000 11,260.00 0.000 0.00 (S) 010 PORTABLE CHANGEABLE MESSAGE SIGN EA 22,000.0000 132,000.00 0.294 6,468.00 0.294 6,468.00 (S) 011 TEMPORARY RAILING (TYPE K) M 18.0000 127,980.00 0.000 0.00 012 TEMPORARY CRASH CUSHION MODULE EA 170.0000 4,760.00 0.000 0.00 (S) 013 REMOVE DOUBLE METAL BEAM BARRIER M 15.0000 52,350.00 0.000 0.00 014 REMOVE TRAFFIC STRIPE M2 21.0000 882.00 0.000 0.00 015 REMOVE ASPHALT CONCRETE DIKE M 1.7000 3,723.00 0.000 0.00 016 REMOVE INLET EA 2,100.0000 8,400.00 0.000 0.00 017 REMOVE ASPHALT CONCRETE SURFACING M2 67.0000 871.00 0.000 0.00 018 SALVAGE METAL BEAM GUARD RAILING M 25.0000 4,500.00 0.000 0.00 019 RECONSTRUCT METAL BEAM GUARD RAILING M 93.0000 7,161.00 0.000 0.00 (S) 020 MODIFY INLET EA 2,300.0000 20,700.00 0.000 0.00 021 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 1.9000 17,727.00 0.000 0.00 (30 MM MAXIMUM) 022 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 2.2000 27,060.00 0.000 0.00 (45 MM MAXIMUM) PROGRAM CAS145 PAGE 2 DATE 06/21/01 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-229114 TIME 02:12 PM ESTIMATE NO. 03 BID OPENING 09/28/00 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/01 R.E. NAME: AL-JAFRI, ABU-BAKR DATE OF THIS ESTIMATE 06/21/01 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 023 REMOVE CONCRETE M3 900.0000 6,300.00 0.000 0.00 024 REMOVE CONCRETE BARRIER M 220.0000 660.00 0.000 0.00 025 CAP INLET EA 1,000.0000 5,000.00 0.000 0.00 026 SALVAGE CRASH CUSHION MODULES EA 42.0000 1,512.00 0.000 0.00 027 CLEARING AND GRUBBING LS 1,000.0000 1,000.00 0.000 0.00 028 DEVELOP WATER SUPPLY LS 10,000.0000 10,000.00 0.000 0.00 029 ROADWAY EXCAVATION M3 26.0000 82,940.00 0.000 0.00 030 DITCH EXCAVATION M3 10.0000 7,900.00 0.000 0.00 031 PRUNE EXISTING PLANTS LS 38,000.0000 38,000.00 0.000 0.00 032 FIBER (EROSION CONTROL) KG 0.6000 2,160.00 0.000 0.00 (S) 033 COMPOST (EROSION CONTROL) KG 0.6000 1,560.00 0.000 0.00 (S) 034 PURE LIVE SEED (EROSION CONTROL) KG 102.0000 5,814.00 0.000 0.00 (S) 035 COMMERCIAL FERTILIZER (EROSION CONTROL) KG 7.7000 770.00 0.000 0.00 (S) 036 STABILIZING EMULSION (EROSION CONTROL) KG 3.8000 1,140.00 0.000 0.00 (S) 037 CLASS 2 AGGREGATE BASE M3 35.0000 79,450.00 0.000 0.00 038 AGGREGATE BASE (APPROACH SLAB) M3 180.0000 3,960.00 0.000 0.00 039 ASPHALTIC EMULSION (FOG SEAL COAT) TONN 240.0000 17,040.00 0.000 0.00 040 ASPHALT CONCRETE (TYPE A) TONN 44.0000 321,200.00 0.000 0.00 041 PLACE ASPHALT CONCRETE DIKE M 4.8000 10,560.00 0.000 0.00 042 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 67.0000 871.00 0.000 0.00 AREA) 043 ASPHALTIC EMULSION (PAINT BINDER) TONN 240.0000 1,680.00 0.000 0.00 044 REPLACE CONCRETE PAVEMENT M3 340.0000 802,400.00 70.480 23,963.20 70.480 23,963.20 045 DOWEL BAR RETROFIT EA 40.0000 1668,000.00 0.000 0.00 046 SEAL PAVEMENT JOINT M 4.5000 891,000.00 0.000 0.00 047 REPAIR SPALLED JOINTS M2 273.0000 21,294.00 32.250 8,804.25 32.250 8,804.25 048 FURNISH POLYESTER CONCRETE M3 2,400.0000 19,200.00 1.852 4,444.80 1.852 4,444.80 049 GRIND EXISTING CONCRETE PAVEMENT M2 5.0000 2015,000.00 0.000 0.00 PROGRAM CAS145 PAGE 3 DATE 06/21/01 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-229114 TIME 02:12 PM ESTIMATE NO. 03 BID OPENING 09/28/00 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/01 R.E. NAME: AL-JAFRI, ABU-BAKR DATE OF THIS ESTIMATE 06/21/01 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 050 GRIND EXISTING ASPHALT CONCRETE M2 3.7000 4,514.00 0.000 0.00 PAVEMENT 051 STRUCTURAL CONCRETE, APPROACH SLAB M3 800.0000 168,800.00 0.000 0.00 (TYPE R) 052 CLASS 1 CONCRETE (MINOR STRUCTURE) M3 1,500.0000 10,500.00 0.000 0.00 053 MINOR CONCRETE (MINOR STRUCTURE) M3 1,100.0000 12,100.00 0.000 0.00 (F) 054 PAVING NOTCH EXTENSION M3 2,500.0000 12,500.00 0.000 0.00 055 CLEAN EXPANSION JOINT M 42.0000 4,452.00 0.000 0.00 056 REFINISH BRIDGE DECK M2 190.0000 3,990.00 0.000 0.00 057 JOINT SEAL (MR 15 MM) M 40.0000 7,160.00 0.000 0.00 (S) 058 600 MM REINFORCED CONCRETE PIPE M 220.0000 83,600.00 0.000 0.00 059 450 MM BITUMINOUS COATED SLOTTED M 420.0000 18,060.00 0.000 0.00 CORRUGATED STEEL PIPE (2.01 MM THICK) 060 CONCRETE (DITCH LINING) M3 250.0000 70,000.00 0.000 0.00 061 MISCELLANEOUS IRON AND STEEL KG 2.0000 5,312.00 0.000 0.00 (SF) 062 DELINEATOR (CLASS 1) EA 31.0000 465.00 0.000 0.00 063 SINGLE THRIE BEAM BARRIER (WOOD POST) M 52.0000 504,400.00 0.000 0.00 (S) 064 TERMINAL SYSTEM (TYPE ET) EA 3,500.0000 17,500.00 0.000 0.00 (S) 065 TERMINAL ANCHOR ASSEMBLY (TYPE SFT) EA 530.0000 2,120.00 0.000 0.00 (S) 066 CONCRETE BARRIER (TYPE 60) M 100.0000 93,000.00 0.000 0.00 067 CONCRETE BARRIER (TYPE 60C) M 130.0000 286,000.00 0.000 0.00 068 CONCRETE BARRIER (TYPE 60E) M 480.0000 26,400.00 0.000 0.00 069 CONCRETE BARRIER (TYPE 60E MODIFIED) M 680.0000 29,920.00 0.000 0.00 070 CONCRETE BARRIER M 230.0000 61,410.00 0.000 0.00 (F) (TYPE 60A MODIFIED) 071 THERMOPLASTIC PAVEMENT MARKING M2 33.0000 1,188.00 0.000 0.00 (S) 072 200 MM THERMOPLASTIC TRAFFIC STRIPE M 2.6000 3,952.00 0.000 0.00 (S) 073 200 MM THERMOPLASTIC TRAFFIC STRIPE M 2.6000 5,824.00 0.000 0.00 (S) (BROKEN 3.66 M - 0.92 M) 074 PAINT TRAFFIC STRIPE (2-COAT) M 0.2600 24,414.00 0.000 0.00 (S) 075 PAVEMENT MARKER (NON-REFLECTIVE) EA 1.1000 28,270.00 0.000 0.00 (S) 076 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.3000 23,460.00 0.000 0.00 (S) PROGRAM CAS145 PAGE 4 DATE 06/21/01 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-229114 TIME 02:12 PM ESTIMATE NO. 03 BID OPENING 09/28/00 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/01 R.E. NAME: AL-JAFRI, ABU-BAKR DATE OF THIS ESTIMATE 06/21/01 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 077 MODIFY TRAFFIC MONITORING STATION LS 15,000.0000 15,000.00 0.000 0.00 (S) 078 MODIFY RAMP METERING SYSTEM LS 27,000.0000 27,000.00 0.000 0.00 (S) 079 MODIFY LIGHTING LS 11,000.0000 11,000.00 0.000 0.00 (S) 080 NO. 5(T) PULL BOX EA 800.0000 16,800.00 0.000 0.00 (S) PROGRAM CAS145 PAGE 5 DATE 06/21/01 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-229114 TIME 02:12 PM ESTIMATE NO. 03 BID OPENING 09/28/00 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/01 R.E. NAME: AL-JAFRI, ABU-BAKR DATE OF THIS ESTIMATE 06/21/01 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 85,280.25 100,480.25 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 1,657.59 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 85,280.25 102,137.84 081 MOBILIZATION LS 600,000.0000 600,000.00 0.000 0.00 ORIGINAL CONTRACT AMOUNT 9,250,317.00 TOTAL WORK COMPLETED 85,280.25 102,137.84 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -8,528.02 -8,528.02 TOTAL 76,752.23 93,609.82 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 028 DEVELOP WATER SUPPLY 9,000.00 10,000.00 1,000.00 DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 10/25/00 265 00/00/00 02/22/01 06/28/02 12 73 0 0 1% 5% PROGRESS IS SATISFACTORY AL-JAFRI, ABU-BAKR RESIDENT ENGINEER PROGRAM CAS145 PAGE 13 DATE 06/21/01