PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/22/05 EST. NO.05 TIME 01:03 PM R.E. NAME: NAVA, ROBERT 11-241904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/22/05 EST. NO.05 TIME 01:03 PM R.E. NAME: NAVA, ROBERT 11-241904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION O/S PRS DEC -7,568.17 03 O/S PRS JAN -1,000.00 04 PRS RECD DEC 7,568.17 05 PRS RECD JAN 1,000.00 05 8,568.17 0.00 TOTAL DEDUCTIONS 8,568.17 0.00 PROGRAM CAS145 PAGE 1 DATE 03/22/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-241904 TIME 01:03 PM ESTIMATE NO. 05 BID OPENING 08/12/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/05 R.E. NAME: NAVA, ROBERT DATE OF THIS ESTIMATE 03/22/05 LOCATION PROGRESS ESTIMATE 11-SD-78-20.7/R21.3 ----------------- R.J. BULLARD CONSTRUCTION, INC IN SAN DIEGO COUNTY NEAR ESCONDIDO P.O. BOX 1577 FROM CITRUS AVENUE TO FLORA VISTA BONSALL, CA 92003-1577 DRIVE FED. AID NO. ACST-P078(102)E ,PH-P078(102)E REVISE INTERSECTION WIDEN SHOULDERS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 TEMPORARY FENCE (TYPE ESA) M 25.0000 4,250.00 170.000 4,250.00 02 PREPARE STORM WATER POLLUTION LS 3,000.0000 3,000.00 0.750 2,250.00 S) PREVENTION PLAN 03 WATER POLLUTION CONTROL LS 4,500.0000 4,500.00 0.070 315.00 04 SWEEPER EA 5,000.0000 5,000.00 0.070 350.00 05 TEMPORARY EROSION CONTROL M2 0.5000 2,295.00 1,805.000 902.50 S) 06 TEMPORARY FIBER ROLL M 8.0000 16,160.00 753.250 6,026.00 07 TEMPORARY CHECK DAM M 5.0000 75.00 107.000 535.00 08 TEMPORARY CONSTRUCTION ENTRANCE EA 8,000.0000 32,000.00 0.500 4,000.00 (TYPE 2) 09 TEMPORARY DRAINAGE INLET PROTECTION EA 65.0000 780.00 2.000 130.00 10 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 750.0000 750.00 0.000 0.00 11 CONSTRUCTION AREA SIGNS LS 7,500.0000 7,500.00 0.414 3,105.00 S) 12 TRAFFIC CONTROL SYSTEM LS 100,000.0000 100,000.00 0.070 7,000.00 S) 13 TYPE III BARRICADE EA 60.0000 720.00 9.000 540.00 S) 14 TEMPORARY PAVEMENT MARKING (TAPE) M2 60.0000 1,560.00 17.920 1,075.20 S) 15 TEMPORARY TRAFFIC STRIPE (PAINT) M 2.0000 9,000.00 2,760.000 5,520.00 S) 16 TEMPORARY PAVEMENT MARKER EA 4.0000 2,080.00 266.000 1,064.00 S) 17 PORTABLE CHANGEABLE MESSAGE SIGN EA 8,500.0000 34,000.00 0.270 2,295.00 S) 18 TEMPORARY RAILING (TYPE K) M 40.0000 50,000.00 652.700 26,108.00 S) 19 TRAFFIC PLASTIC DRUM EA 45.0000 4,950.00 4.000 180.00 51.000 2,295.00 S) 20 TEMPORARY CRASH CUSHION MODULE EA 300.0000 12,600.00 0.000 0.00 S) 21 TEMPORARY CRASH CUSHION (ADIEM) EA 7,500.0000 22,500.00 3.000 22,500.00 S) 22 ABANDON CULVERT EA 200.0000 1,200.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 03/22/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-241904 TIME 01:03 PM ESTIMATE NO. 05 BID OPENING 08/12/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/05 R.E. NAME: NAVA, ROBERT DATE OF THIS ESTIMATE 03/22/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 REMOVE YELLOW PAINTED TRAFFIC STRIPE M2 50.0000 10,000.00 184.300 9,215.00 S) 24 REMOVE TRAFFIC STRIPE AND PAVEMENT M2 40.0000 440.00 0.000 0.00 S) MARKING 25 REMOVE ASPHALT CONCRETE DIKE M 30.0000 630.00 0.000 0.00 26 RESET MAILBOX EA 300.0000 900.00 0.000 0.00 27 RESET ROADSIDE SIGN EA 300.0000 4,500.00 0.000 0.00 28 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 4.5000 31,140.00 0.000 0.00 S) 29 CLEARING AND GRUBBING LS 10,000.0000 10,000.00 0.240 2,400.00 30 DEVELOP WATER SUPPLY LS 2,500.0000 2,500.00 0.020 50.00 31 ROADWAY EXCAVATION M3 40.0000 135,200.00 793.760 31,750.40 32 LEAD COMPLIANCE PLAN LS 4,500.0000 4,500.00 0.000 0.00 33 STRUCTURE EXCAVATION (RETAINING WALL) M3 40.0000 90,440.00 0.000 0.00 F) 34 STRUCTURE BACKFILL (RETAINING WALL) M3 82.0000 134,398.00 0.000 0.00 F) 35 PERVIOUS BACKFILL MATERIAL (RETAINING M3 92.0000 21,528.00 0.000 0.00 F) WALL) 36 SAND BACKFILL M3 75.0000 4,275.00 0.000 0.00 37 HIGHWAY PLANTING LS 12,000.0000 12,000.00 0.000 0.00 S) 38 BONDED FIBER MATRIX (EROSION CONTROL) KG 3.0000 6,000.00 0.000 0.00 S) 39 COMPOST (EROSION CONTROL) M3 110.0000 88.00 0.000 0.00 S) 40 PURE LIVE SEED KG 65.0000 585.00 0.000 0.00 S) (EROSION CONTROL - TYPE 1) 41 PURE LIVE SEED KG 60.0000 18.00 0.000 0.00 S) (EROSION CONTROL - TYPE 2) 42 COMMERCIAL FERTILIZER (EROSION CONTROL) KG 0.6000 7.20 0.000 0.00 S) 43 PLANT ESTABLISHMENT WORK LS 12,000.0000 12,000.00 0.000 0.00 S) 44 IRRIGATION SYSTEM LS 32,000.0000 32,000.00 0.000 0.00 S) 45 WATER METER EA 15,000.0000 30,000.00 0.000 0.00 46 150 MM CHDPE CONDUIT M 140.0000 3,080.00 0.000 0.00 S) 47 CLASS 2 AGGREGATE BASE M3 70.0000 113,400.00 0.000 0.00 48 ASPHALTIC EMULSION (FOG SEAL COAT) TONN 5,000.0000 9,000.00 0.000 0.00 49 ASPHALT CONCRETE (TYPE A) TONN 71.5000 210,210.00 0.000 0.00 PROGRAM CAS145 PAGE 3 DATE 03/22/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-241904 TIME 01:03 PM ESTIMATE NO. 05 BID OPENING 08/12/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/05 R.E. NAME: NAVA, ROBERT DATE OF THIS ESTIMATE 03/22/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 PLACE ASPHALT CONCRETE DIKE M 5.5000 7,535.00 0.000 0.00 51 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 50.2500 6,030.00 0.000 0.00 AREA) 52 ASPHALTIC EMULSION (PAINT BINDER) TONN 1,850.0000 9,065.00 0.000 0.00 53 CLASS 2 CONCRETE (RETAINING WALL) M3 400.0000 273,600.00 0.000 0.00 F) 54 MINOR CONCRETE (MINOR STRUCTURE) M3 525.0000 40,950.00 0.000 0.00 F) 55 ARCHITECTURAL TREATMENT M2 90.0000 35,460.00 0.000 0.00 F) (COBBLESTONE TEXTURE) 56 ARCHITECTURAL TREATMENT M2 65.0000 7,215.00 0.000 0.00 F) (HEAVY SANDBLAST TEXTURE) 57 ANTI-GRAFFITI COATING M2 15.0000 11,700.00 0.000 0.00 F) 58 BAR REINFORCING STEEL (RETAINING WALL) KG 2.7500 87,606.75 0.000 0.00 SF) 59 ROADSIDE SIGN - ONE POST EA 450.0000 1,350.00 0.000 0.00 60 INSTALL ROADSIDE SIGN PANEL ON EA 300.0000 300.00 0.000 0.00 EXISTING POST 61 PREPARE AND STAIN CONCRETE M2 38.0000 14,972.00 0.000 0.00 F) 62 600 MM REINFORCED CONCRETE PIPE M 525.0000 94,500.00 0.000 0.00 63 1200 MM REINFORCED CONCRETE PIPE M 685.0000 226,050.00 0.000 0.00 64 450 MM BITUMINOUS COATED CORRUGATED M 850.0000 11,900.00 0.000 0.00 STEEL PIPE (3.51 MM THICK) 65 900 MM BITUMINOUS COATED CORRUGATED M 900.0000 13,500.00 0.000 0.00 STEEL PIPE (4.27 MM THICK) 66 600 MM BITUMINOUS COATED CORRUGATED M 675.0000 20,250.00 0.000 0.00 STEEL PIPE (4.27 MM THICK) 67 1060 MM X 740 MM BITUMINOUS LINED M 1,200.0000 43,200.00 0.000 0.00 CORRUGATED STEEL PIPE ARCH (4.27 MM THICK) 68 600 MM CONCRETE FLARED END SECTION EA 1,500.0000 1,500.00 0.000 0.00 69 MINOR CONCRETE (BACKFILL) M3 175.0000 6,300.00 0.000 0.00 F) 70 ROCK SLOPE PROTECTION M3 320.0000 4,480.00 0.000 0.00 (BACKING NO. 2, METHOD B) 71 CONCRETE (SLOPE PROTECTION) M3 400.0000 4,400.00 0.000 0.00 72 ROCK SLOPE PROTECTION FABRIC M2 3.0000 159.00 0.000 0.00 73 MINOR CONCRETE (GUTTER) M3 450.0000 9,000.00 0.000 0.00 74 MISCELLANEOUS IRON AND STEEL KG 3.0000 9,786.00 0.000 0.00 SF) 75 DELINEATOR (CLASS 1) EA 35.0000 385.00 0.000 0.00 PROGRAM CAS145 PAGE 4 DATE 03/22/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-241904 TIME 01:03 PM ESTIMATE NO. 05 BID OPENING 08/12/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/05 R.E. NAME: NAVA, ROBERT DATE OF THIS ESTIMATE 03/22/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 76 METAL BEAM GUARD RAILING (WOOD POST) M 135.0000 13,365.00 0.000 0.00 S) 77 CONCRETE BARRIER (TYPE K) M 75.0000 3,750.00 0.000 0.00 S) 78 CABLE RAILING M 40.0000 12,000.00 0.000 0.00 S) 79 TERMINAL SECTION (TYPE B) EA 140.0000 560.00 0.000 0.00 S) 80 TERMINAL SYSTEM (TYPE ET) EA 3,500.0000 7,000.00 0.000 0.00 S) 81 TERMINAL SYSTEM (TYPE SRT) EA 2,500.0000 17,500.00 0.000 0.00 S) 82 CONCRETE BARRIER (TYPE 60D) M 120.0000 36,000.00 0.000 0.00 83 THERMOPLASTIC PAVEMENT MARKING M2 35.0000 1,750.00 0.000 0.00 S) 84 100 MM THERMOPLASTIC TRAFFIC STRIPE M 2.5000 4,450.00 0.000 0.00 S) 85 200 MM THERMOPLASTIC TRAFFIC STRIPE M 3.0000 900.00 0.000 0.00 S) 86 PAINT TRAFFIC STRIPE (2-COAT) M 2.5000 4,500.00 0.000 0.00 S) 87 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.0000 1,240.00 0.000 0.00 S) PROGRAM CAS145 PAGE 5 DATE 03/22/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-241904 TIME 01:03 PM ESTIMATE NO. 05 BID OPENING 08/12/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/05 R.E. NAME: NAVA, ROBERT DATE OF THIS ESTIMATE 03/22/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 180.00 133,676.10 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 13,077.87 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 180.00 146,753.97 88 MOBILIZATION LS 240,000.0000 240,000.00 0.500 120,000.00 ORIGINAL CONTRACT AMOUNT 2,477,967.95 TOTAL WORK COMPLETED 180.00 266,753.97 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 8,568.17 0.00 TOTAL 8,748.17 266,753.97 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 032 LEAD COMPLIANCE PLAN 2,500.00 4,500.00 2,000.00 DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 09/08/04 370 11/01/04 09/23/04 07/30/06 29 93 0 0 11% 24% PROGRESS IS SATISFACTORY NAVA, ROBERT RESIDENT ENGINEER PROGRAM CAS145 PAGE 12 DATE 03/22/05