PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 02/21/07 EST. NO.02 TIME 02:04 PM R.E. NAME: LEVINE, GARY 11-241924 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 51.77 E.W. @ F.A.(+) 121406 N 012 0 0003 51.76 121506 N 015 0 002 0001 1,728.33 E.W. @ F.A.(+) 112906 N 001 0 0003 1,055.82 120706 N 003 0 0004 895.38 120806 N 004 0 0007 38.14 121106 N 007 0 0008 271.68 121206 N 008 0 0009 869.50 121206 N 009 0 0011 846.13 121406 N 011 0 0012 308.76 121506 N 013 0 0013 435.89 121506 N 016 0 0014 565.28 121806 N 018 0 0015 2,563.23 122806 N 024 0 0016 1,258.60 010207 N 025 0 0017 31,625.00 010207 N 026 0 0019 179.81 121806 N 017 0 0023 728.57 122206 N 023 0 43,473.65 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 43,473.65 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 02/21/07 EST. NO.02 TIME 02:04 PM R.E. NAME: LEVINE, GARY 11-241924 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION O/S PRS JAN -3,485.57 02 -3,485.57 -3,485.57 OVERBID ITEMS OVERBID ITEM NO. 034 -21,591.73 01 OVERBID ITEM NO. 034 -19,432.56 02 -19,432.56 -41,024.29 TOTAL DEDUCTIONS -22,918.13 -44,509.86 PROGRAM CAS145 PAGE 1 DATE 02/21/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-241924 TIME 02:04 PM ESTIMATE NO. 02 BID OPENING 12/08/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/07 R.E. NAME: LEVINE, GARY DATE OF THIS ESTIMATE 02/21/07 LOCATION PROGRESS ESTIMATE 11-SD-78-20.9/R21.3 ----------------- WEIR CONSTRUCTION IN SAN DIEGO COUNTY NEAR ESCONDIDO 2255 BARHAM DRIVE FROM SUMMIT DRIVE TO FLORA VISTA ESCONDIDO,CA 92029 DRIVE FED. AID NO. ACST-P078(104)3 ,PH-P078(104)E WIDEN SHOULDER ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 TEMPORARY FENCE (TYPE ESA) M 20.1000 2,613.00 0.000 0.00 02 PREPARE WATER POLLUTION CONTROL LS 3,350.0000 3,350.00 0.750 2,512.50 S) PROGRAM 03 WATER POLLUTION CONTROL LS 6,700.0000 6,700.00 0.250 1,675.00 0.250 1,675.00 04 TEMPORARY EROSION CONTROL M2 0.7800 1,716.00 0.000 0.00 S) 05 TEMPORARY FIBER ROLL M 9.3800 5,534.20 53.340 500.33 53.340 500.33 06 TEMPORARY CONSTRUCTION ENTRANCE EA 2,974.8000 11,899.20 0.000 0.00 07 TEMPORARY DRAINAGE INLET PROTECTION EA 268.0000 1,340.00 0.000 0.00 08 STREET SWEEPING LS 10,452.0000 10,452.00 0.000 0.00 09 CONSTRUCTION AREA SIGNS LS 5,668.2000 5,668.20 0.260 1,473.73 0.700 3,967.74 S) 10 TRAFFIC CONTROL SYSTEM LS 29,346.0000 29,346.00 0.257 7,541.92 0.257 7,541.92 S) 11 TYPE III BARRICADE EA 100.5000 603.00 0.000 0.00 S) 12 PORTABLE CHANGEABLE MESSAGE SIGN EA 6,030.0000 12,060.00 0.000 0.00 S) 13 TEMPORARY RAILING (TYPE K) M 98.5300 24,632.50 219.600 21,637.19 S) 14 TRAFFIC PLASTIC DRUM EA 46.9000 2,954.70 0.000 0.00 15 TEMPORARY CRASH CUSHION MODULE EA 241.2000 6,753.60 28.000 6,753.60 S) 16 REMOVE ROADSIDE SIGN EA 335.0000 670.00 0.000 0.00 17 RESET MAILBOX EA 268.0000 804.00 0.000 0.00 18 RESET ROADSIDE SIGN EA 335.0000 1,340.00 0.000 0.00 19 REMOVE CONCRETE BARRIER (TYPE K) M 124.4300 6,097.07 0.000 0.00 20 CLEARING AND GRUBBING LS 24,857.0000 24,857.00 0.200 4,971.40 0.600 14,914.20 21 ROADWAY EXCAVATION M3 56.5200 77,432.40 140.710 7,952.93 140.710 7,952.93 22 COMPOST (EROSION CONTROL) M3 1,120.7000 448.28 0.000 0.00 S) PROGRAM CAS145 PAGE 2 DATE 02/21/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-241924 TIME 02:04 PM ESTIMATE NO. 02 BID OPENING 12/08/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/07 R.E. NAME: LEVINE, GARY DATE OF THIS ESTIMATE 02/21/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 BONDED FIBER MATRIX (EROSION CONTROL) KG 2.5100 2,585.30 0.000 0.00 S) 24 PURE LIVE SEED (EROSION CONTROL) KG 169.9400 849.70 0.000 0.00 S) 25 COMMERCIAL FERTILIZER (EROSION CONTROL) KG 54.9700 329.82 0.000 0.00 S) 26 EXTEND 200 MM CONDUIT M 670.0000 2,010.00 0.000 0.00 S) 27 CLASS 2 AGGREGATE BASE M3 100.5000 40,200.00 106.870 10,740.44 106.870 10,740.44 28 ASPHALTIC EMULSION (FOG SEAL COAT) TONN 536.0000 268.00 0.000 0.00 29 ASPHALT CONCRETE (TYPE A) TONN 160.8000 88,440.00 0.000 0.00 30 PLACE ASPHALT CONCRETE DIKE M 29.4800 23,878.80 0.000 0.00 31 ASPHALTIC EMULSION (PAINT BINDER) TONN 670.0000 536.00 0.000 0.00 32 DELINEATOR (CLASS 1) EA 60.3000 723.60 0.000 0.00 33 THERMOPLASTIC PAVEMENT MARKING M2 201.0000 603.00 0.000 0.00 S) PROGRAM CAS145 PAGE 3 DATE 02/21/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-241924 TIME 02:04 PM ESTIMATE NO. 02 BID OPENING 12/08/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/07 R.E. NAME: LEVINE, GARY DATE OF THIS ESTIMATE 02/21/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 34,855.75 78,195.85 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 43,473.65 43,473.65 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 78,329.40 121,669.50 34 MOBILIZATION LS 92,170.0000 92,170.00 0.450 41,476.50 0.950 87,561.50 ORIGINAL CONTRACT AMOUNT 489,865.37 TOTAL WORK COMPLETED 119,805.90 209,231.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -22,918.13 -44,509.86 TOTAL 96,887.77 164,721.14 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 034 MOBILIZATION 48,986.53 92,170.00 43,183.47 DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 02/28/06 70 01/02/07 01/02/07 04/16/07 31 2 0 0 32% 44% PROGRESS IS SATISFACTORY LEVINE, GARY RESIDENT ENGINEER PROGRAM CAS145 PAGE 3 DATE 02/21/07