PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/07/05 EST. NO.05 TIME 07:19 AM R.E. NAME: KHAN, MOHAMMED 11-252404 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0005 3,484.81 E.W. @ F.A.(+) 120604 N 005 0 0006 482.41 120604 N 005A 0 0007 211.19 112304 N 006 0 4,178.41 TOTAL THIS ESTIMATE 2,219.51 TOTAL PREVIOUS ESTIMATE 6,397.92 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/07/05 EST. NO.05 TIME 07:19 AM R.E. NAME: KHAN, MOHAMMED 11-252404 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE AC GRADING -877.50 04 0.00 -877.50 LABOR COMPLIANCE VIOLATION O/S PRS SEPT -10,000.00 02 O/S PRS OCT -10,000.00 03 PRS RECD SEPT 10,000.00 04 PRS RECD OCT 10,000.00 04 0.00 0.00 OVERBID ITEMS OVERBID ITEM NO. 040 -190.85 02 OVERBID ITEM NO. 040 -10.05 03 OVERBID ITEM NO. 040 200.90 04 0.00 0.00 OTHER OUTSTANDING DOCUMENTS CEM-2402(S) -10,000.00 04 CEM-2402(S) 10,000.00 05 10,000.00 0.00 TOTAL DEDUCTIONS 10,000.00 -877.50 PROGRAM CAS145 PAGE 1 DATE 03/07/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-252404 TIME 07:19 AM ESTIMATE NO. 05 BID OPENING 04/15/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/07/04 R.E. NAME: KHAN, MOHAMMED DATE OF THIS ESTIMATE 03/07/05 LOCATION FINAL ESTIMATE 11-SD-5-R35.3/R36.8 -------------- HAZARD CONSTRUCTION COMPANY IN SAN DIEGO COUNTY IN SAN DIEGO ART HERNANDEZ AND SOLANA BEACH FROM 1.6 KM P.O. BOX 229000 SOUTH TO 0.9 KM NORTH OF SAN DIEGO,CA 92192-9000 VIA DE LA VALLE UNDERCROSSING FED. AID NO. N O N E RAMP REHABILITATION ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 TEMPORARY FENCE (TYPE ESA) M 12.0000 1,800.00 150.000 1,800.00 02 PREPARE WATER POLLUTION CONTROL LS 1,500.0000 1,500.00 1.000 1,500.00 PROGRAM 03 WATER POLLUTION CONTROL LS 3,000.0000 3,000.00 1.000 3,000.00 04 TEMPORARY SOIL STABILIZER KG 2.3000 621.00 270.000 621.00 05 TEMPORARY FIBER ROLL M 7.2000 4,680.00 103.000 741.60 750.700 5,405.04 06 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 1,200.0000 1,200.00 1.000 1,200.00 07 TEMPORARY GRAVEL BAGS EA 17.0000 1,020.00 60.000 1,020.00 08 CONSTRUCTION AREA SIGNS LS 1,000.0000 1,000.00 1.000 1,000.00 S) 09 TRAFFIC CONTROL SYSTEM LS 24,000.0000 24,000.00 1.000 24,000.00 S) 10 PORTABLE CHANGEABLE MESSAGE SIGN EA 1,300.0000 2,600.00 2.000 2,600.00 S) 11 REMOVE ASPHALT CONCRETE DIKE M 1.5000 3,750.00 2,271.000 3,406.50 12 REMOVE DELINEATOR EA 10.0000 140.00 14.000 140.00 13 RECONSTRUCT METAL BEAM GUARD RAILING M 53.0000 13,250.00 1.500 79.50 251.500 13,329.50 (WOOD POST) 14 MODIFY SIGN STRUCTURE EA 3,030.0000 6,060.00 2.000 6,060.00 15 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 3.3000 86,130.00 26,982.130 89,041.03 S) 16 ROADWAY EXCAVATION M3 105.0000 37,800.00 360.000 37,800.00 17 LEAD COMPLIANCE PLAN LS 1,300.0000 1,300.00 1.000 1,300.00 18 ASPHALTIC EMULSION (FOG SEAL COAT) TONN 400.0000 840.00 0.635 254.00 2.210 884.00 19 ASPHALT CONCRETE (TYPE A) TONN 63.6000 256,308.00 4,480.150 284,937.54 20 PLACE ASPHALT CONCRETE DIKE M 5.6000 17,528.00 2,997.250 16,784.60 21 ASPHALTIC EMULSION (PAINT BINDER) TONN 400.0000 3,200.00 0.550 220.00 6.550 2,620.00 22 MINOR CONCRETE (MINOR STRUCTURE) M3 15,500.0000 80,600.00 5.200 80,600.00 PROGRAM CAS145 PAGE 2 DATE 03/07/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-252404 TIME 07:19 AM ESTIMATE NO. 05 BID OPENING 04/15/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/07/04 R.E. NAME: KHAN, MOHAMMED DATE OF THIS ESTIMATE 03/07/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 FURNISH SIGN STRUCTURE (TRUSS) KG 23.0000 3,910.00 170.000 3,910.00 F) 24 ROADSIDE SIGN - ONE POST EA 200.0000 400.00 0.000 0.00 25 ROADSIDE SIGN - TWO POST EA 800.0000 800.00 0.000 0.00 26 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 70.0000 140.00 2.000 140.00 METHOD) 27 INSTALL ROADSIDE SIGN PANEL ON EA 100.0000 400.00 3.000 300.00 EXISTING POST 28 600 MM REINFORCED CONCRETE PIPE M 70.0000 700.00 12.200 854.00 29 MISCELLANEOUS IRON AND STEEL KG 2.0000 1,480.00 740.000 1,480.00 F) 30 DELINEATOR (CLASS 1) EA 22.0000 968.00 -42.000 -924.00 42.000 924.00 31 TERMINAL SYSTEM (TYPE SRT) EA 2,400.0000 7,200.00 3.000 7,200.00 S) 32 THERMOPLASTIC PAVEMENT MARKING M2 29.3000 7,032.00 158.140 4,633.50 S) 33 200 MM THERMOPLASTIC TRAFFIC STRIPE M 2.5000 3,550.00 1,424.000 3,560.00 S) 34 100 MM THERMOPLASTIC TRAFFIC STRIPE M 2.0000 132.00 283.440 566.88 S) (BROKEN 5.18 M - 2.14 M) 35 PAINT TRAFFIC STRIPE (2-COAT) M 0.7000 3,276.00 5,727.000 4,008.90 S) 36 PAVEMENT MARKER (NON-REFLECTIVE) EA 2.2000 836.00 358.000 787.60 S) 37 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.0000 1,620.00 680.000 2,040.00 S) 38 INDUCTIVE LOOP DETECTOR EA 380.0000 28,120.00 78.000 29,640.00 S) 39 MODIFY LIGHTING LS 10,100.0000 10,100.00 1.000 10,100.00 S) PROGRAM CAS145 PAGE 3 DATE 03/07/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-252404 TIME 07:19 AM ESTIMATE NO. 05 BID OPENING 04/15/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/07/04 R.E. NAME: KHAN, MOHAMMED DATE OF THIS ESTIMATE 03/07/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 371.10 649,194.09 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 4,178.41 6,397.92 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 4,549.51 655,592.01 40 MOBILIZATION LS 69,000.0000 69,000.00 1.000 69,000.00 ORIGINAL CONTRACT AMOUNT 687,991.00 TOTAL WORK COMPLETED 4,549.51 724,592.01 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 10,000.00 -877.50 TOTAL 14,549.51 723,714.51 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 040 MOBILIZATION 68,799.10 69,000.00 200.90 DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 05/13/04 50 09/10/04 09/12/04 12/07/04 50 11 0 0 100% 100% KHAN, MOHAMMED RESIDENT ENGINEER PROGRAM CAS145 DATE 03/07/05