PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 01/22/07 EST. NO.01 TIME 01:42 PM R.E. NAME: FIGUEROA, RENE 11-267704 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 01/22/07 EST. NO.01 TIME 01:42 PM R.E. NAME: FIGUEROA, RENE 11-267704 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 01/22/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-267704 TIME 01:42 PM ESTIMATE NO. 01 BID OPENING 10/26/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/07 R.E. NAME: FIGUEROA, RENE DATE OF THIS ESTIMATE 01/22/07 LOCATION PROGRESS ESTIMATE 11-SD-8-R28.2/R28.6 ----------------- SIM J HARRIS IN SAN DIEGO COUNTY AT ALPINE FROM P.O. BOX 420850 0.4 KM WEST OF TAVERN ROAD SAN PEDRO,CA 92142 OVERCROSSING TO 0.2 KM EAST OF TAVERN ROAD OVERCROSSING FED. AID NO. ACIM-008 -1(301)E ,G-008 -1(301)E INSTALL NEW SIGNAL AND WIDEN RAMP ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 TEMPORARY FENCE (TYPE ESA) M 9.1800 3,855.60 0.000 0.00 02 PREPARE WATER POLLUTION CONTROL LS 1,250.0000 1,250.00 0.000 0.00 S) PROGRAM 03 WATER POLLUTION CONTROL LS 9,218.0000 9,218.00 0.000 0.00 04 TEMPORARY HYDRAULIC MULCH M2 1.7200 1,204.00 0.000 0.00 S) (POLYMER STABILIZED FIBER MATRIX) 05 TEMPORARY CONSTRUCTION ENTRANCE EA 3,000.0000 3,000.00 0.000 0.00 06 TEMPORARY DRAINAGE INLET PROTECTION EA 375.0000 375.00 0.000 0.00 07 STREET SWEEPING LS 5,000.0000 5,000.00 0.000 0.00 08 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 750.0000 750.00 0.000 0.00 09 CONSTRUCTION AREA SIGNS LS 3,300.0000 3,300.00 0.407 1,343.10 0.407 1,343.10 S) 10 TRAFFIC CONTROL SYSTEM LS 15,500.0000 15,500.00 0.000 0.00 S) 11 TEMPORARY TRAFFIC STRIPE (TAPE) M 4.3600 4,142.00 0.000 0.00 S) 12 TEMPORARY PAVEMENT MARKING (TAPE) M2 150.0000 1,950.00 0.000 0.00 S) 13 TEMPORARY PAVEMENT MARKER EA 5.0000 250.00 0.000 0.00 S) 14 PORTABLE CHANGEABLE MESSAGE SIGN EA 3,937.0000 15,748.00 0.000 0.00 S) 15 TEMPORARY RAILING (TYPE K) M 35.0000 9,450.00 0.000 0.00 S) 16 TRAFFIC PLASTIC DRUM EA 40.0000 280.00 0.000 0.00 S) 17 TEMPORARY CRASH CUSHION (TYPE ADIEM) EA 200.0000 200.00 0.000 0.00 S) 18 REMOVE METAL BEAM GUARD RAILING M 37.0000 1,813.00 0.000 0.00 S) 19 REMOVE YELLOW PAINTED TRAFFIC STRIPE M2 36.2800 2,721.00 0.000 0.00 S) 20 REMOVE TRAFFIC STRIPE AND PAVEMENT M2 21.0000 6,510.00 0.000 0.00 S) MARKING 21 REMOVE ROADSIDE SIGN EA 125.0000 1,125.00 0.000 0.00 22 REMOVE ASPHALT CONCRETE DIKE M 16.3900 3,114.10 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 01/22/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-267704 TIME 01:42 PM ESTIMATE NO. 01 BID OPENING 10/26/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/07 R.E. NAME: FIGUEROA, RENE DATE OF THIS ESTIMATE 01/22/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 REMOVE INLET EA 5,200.0000 5,200.00 0.000 0.00 24 REMOVE ASPHALT CONCRETE SURFACING M3 5,713.0000 4,570.40 0.000 0.00 25 RESET ROADSIDE SIGN EA 150.0000 750.00 0.000 0.00 26 CLEARING AND GRUBBING LS 4,263.0000 4,263.00 0.000 0.00 27 ROADWAY EXCAVATION M3 67.1300 30,208.50 0.000 0.00 28 LEAD COMPLIANCE PLAN LS 4,250.0000 4,250.00 1.000 4,250.00 1.000 4,250.00 29 EROSION CONTROL (TYPE 1) M2 1.8300 1,281.00 0.000 0.00 S) 30 EROSION CONTROL (TYPE 2) M2 62.0000 930.00 0.000 0.00 S) 31 FIBER ROLLS M 7.3500 610.05 0.000 0.00 S) 32 CLASS 2 AGGREGATE BASE M3 90.0000 23,400.00 0.000 0.00 33 ASPHALTIC EMULSION (FOG SEAL COAT) TONN 8,500.0000 1,700.00 0.000 0.00 34 ASPHALT CONCRETE (TYPE A) TONN 115.0000 52,900.00 0.000 0.00 35 PLACE ASPHALT CONCRETE DIKE M 8.1600 2,856.00 0.000 0.00 36 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 114.0000 1,482.00 0.000 0.00 AREA) 37 MINOR CONCRETE (MINOR STRUCTURE) M3 12,000.0000 9,600.00 0.000 0.00 F) 38 FURNISH SINGLE SHEET ALUMINUM SIGN M2 148.0000 2,072.00 0.000 0.00 S) (1.6 MM-UNFRAMED) 39 FURNISH SINGLE SHEET ALUMINUM SIGN M2 195.0000 682.50 0.000 0.00 S) (1.6 MM-FRAMED) 40 ROADSIDE SIGN - ONE POST EA 238.0000 2,380.00 0.000 0.00 41 INSTALL ROADSIDE SIGN PANEL ON EA 90.0000 720.00 0.000 0.00 EXISTING POST 42 MISCELLANEOUS IRON AND STEEL KG 22.0000 2,376.00 0.000 0.00 SF) 43 GUARD RAILING DELINEATOR EA 30.0000 240.00 0.000 0.00 44 METAL BEAM GUARD RAILING M 123.0000 984.00 0.000 0.00 S) 45 TRANSITION RAILING (TYPE WB) EA 3,754.0000 7,508.00 0.000 0.00 S) 46 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 3,589.0000 7,178.00 0.000 0.00 S) 47 THERMOPLASTIC PAVEMENT MARKING M2 56.0000 5,040.00 0.000 0.00 S) 48 200 MM THERMOPLASTIC TRAFFIC STRIPE M 3.6400 1,892.80 0.000 0.00 S) 49 PAINT TRAFFIC STRIPE (2-COAT) M 0.8200 2,583.00 0.000 0.00 S) PROGRAM CAS145 PAGE 3 DATE 01/22/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-267704 TIME 01:42 PM ESTIMATE NO. 01 BID OPENING 10/26/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/07 R.E. NAME: FIGUEROA, RENE DATE OF THIS ESTIMATE 01/22/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 PAVEMENT MARKER (NON-REFLECTIVE) EA 3.7500 262.50 0.000 0.00 S) 51 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.2500 1,445.00 0.000 0.00 S) 52 SIGNAL AND LIGHTING (LOCATION 1) LS 120,000.0000 120,000.00 0.000 0.00 S) 53 SIGNAL AND LIGHTING (LOCATION 2) LS 128,858.5500 128,858.55 0.000 0.00 S) PROGRAM CAS145 PAGE 4 DATE 01/22/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-267704 TIME 01:42 PM ESTIMATE NO. 01 BID OPENING 10/26/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/07 R.E. NAME: FIGUEROA, RENE DATE OF THIS ESTIMATE 01/22/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 5,593.10 5,593.10 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 5,593.10 5,593.10 54 MOBILIZATION LS 50,000.0000 50,000.00 0.000 0.00 ORIGINAL CONTRACT AMOUNT 568,979.00 TOTAL WORK COMPLETED 5,593.10 5,593.10 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 5,593.10 5,593.10 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 026 CLEARING AND GRUBBING 1,000.00 4,263.00 3,263.00 DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 11/22/06 60 01/18/07 01/21/07 04/13/07 1 1 0 0 1% 2% PROGRESS IS SATISFACTORY FIGUEROA, RENE RESIDENT ENGINEER PROGRAM CAS145 PAGE 10 DATE 01/22/07