PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 11/22/10 EST. NO.03 TIME 03:01 PM R.E. NAME: LEVINE, GARY 11-274904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0003 463.63 E.W. @ F.A.(+) 102210 N 0003.0 002 0002 8,776.46 A.C. @ U.P.(+) 111810 N 2 0 9,240.09 TOTAL THIS ESTIMATE 4,261.85 TOTAL PREVIOUS ESTIMATE 13,501.94 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 11/22/10 EST. NO.03 TIME 03:01 PM R.E. NAME: LEVINE, GARY 11-274904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION O/S PRS OCT -5,000.00 03 -5,000.00 -5,000.00 TOTAL DEDUCTIONS -5,000.00 -5,000.00 PROGRAM CAS145 PAGE 1 DATE 11/22/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-274904 TIME 03:01 PM ESTIMATE NO. 03 BID OPENING 07/01/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/10 R.E. NAME: LEVINE, GARY DATE OF THIS ESTIMATE 11/22/10 LOCATION PROGRESS ESTIMATE 11-SD-78-5.0/12.0 ----------------- SIM J. HARRIS IN SAN DIEGO COUNTY IN VISTA AND 9685 VIA EXCELENCIA SUITE 200 SAN MARCOS FROM 1.0 KM EAST OF SAN DIEGO, CA 92126 EMERALD DRIVE OVERCROSSING TO 0.2 KM WEST OF SAN MARCOS BOULEVARD UC FED. AID NO. ACNH-P078(110)E RUBBERIZED HOT MIX ASPHALT OVERLAY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 SMALL BUSINESS UTILIZATION REPORT EA 250.0000 500.00 0.000 0.00 02 CONSTRUCTION SITE MANAGEMENT LS 10,000.0000 10,000.00 0.356 3,560.00 0.356 3,560.00 03 PREPARE WATER POLLUTION CONTROL LS 750.0000 750.00 0.750 562.50 PROGRAM 04 TEMPORARY DRAINAGE INLET PROTECTION EA 80.0000 19,200.00 173.000 13,840.00 05 STREET SWEEPING LS 5,000.0000 5,000.00 0.356 1,780.00 0.356 1,780.00 06 CONSTRUCTION AREA SIGNS LS 15,500.0000 15,500.00 0.142 2,201.00 0.542 8,401.00 07 TRAFFIC CONTROL SYSTEM LS 90,000.0000 90,000.00 0.156 14,040.00 0.356 32,040.00 08 PORTABLE CHANGEABLE MESSAGE SIGN EA 5,000.0000 20,000.00 4.000 20,000.00 4.000 20,000.00 09 REMOVE ROADSIDE SIGN EA 30.0000 360.00 0.000 0.00 10 REMOVE ASPHALT CONCRETE DIKE M 1.1000 10,340.00 0.000 0.00 11 MODIFY SIGN STRUCTURE EA 3,100.0000 31,000.00 0.000 0.00 12 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 2.7500 1,226,500.00 181,003.000 497,758.25 282,227.000 776,124.25 13 LEAD COMPLIANCE PLAN LS 100.0000 100.00 0.000 0.00 14 ASPHALTIC EMULSION (FOG SEAL COAT) TONN 800.0000 57,600.00 10.590 8,472.00 10.590 8,472.00 15 MINOR HOT MIX ASPHALT TONN 83.0000 49,800.00 0.000 0.00 16 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TONN 82.0000 4,682,200.00 26,669.070 2,186,863.74 38,249.550 3,136,463.10 17 DATA CORE LS 5,000.0000 5,000.00 0.500 2,500.00 0.500 2,500.00 18 PLACE HOT MIX ASPHALT DIKE M 3.2500 30,550.00 0.000 0.00 19 TACK COAT TONN 700.0000 98,000.00 48.530 33,971.00 71.880 50,316.00 20 FURNISH SIGN STRUCTURE (TRUSS) KG 20.0000 32,660.00 0.000 0.00 F) 21 FURNISH LAMINATED PANEL SIGN M2 225.0000 31,500.00 0.000 0.00 (25.4 MM-TYPE A) 22 FURNISH SINGLE SHEET ALUMINUM SIGN M2 125.0000 2,875.00 0.000 0.00 (2.0 MM-UNFRAMED) PROGRAM CAS145 PAGE 2 DATE 11/22/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-274904 TIME 03:01 PM ESTIMATE NO. 03 BID OPENING 07/01/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/10 R.E. NAME: LEVINE, GARY DATE OF THIS ESTIMATE 11/22/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 ROADSIDE SIGN - ONE POST EA 275.0000 3,300.00 0.000 0.00 24 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 30.0000 60.00 0.000 0.00 METHOD) 25 DELINEATOR (CLASS 1) EA 30.0000 15,300.00 0.000 0.00 26 MILEPOST MARKER EA 36.0000 108.00 0.000 0.00 27 THERMOPLASTIC PAVEMENT MARKING M2 31.0000 18,910.00 0.000 0.00 28 200 MM THERMOPLASTIC TRAFFIC STRIPE M 2.7500 15,675.00 0.000 0.00 29 200 MM THERMOPLASTIC TRAFFIC STRIPE M 1.5000 1,425.00 0.000 0.00 (BROKEN 3.66 M - 0.92 M) 30 100 MM THERMOPLASTIC TRAFFIC STRIPE M 1.0000 600.00 0.000 0.00 (BROKEN 5.18 M - 2.14 M) 31 PAINT TRAFFIC STRIPE (2-COAT) M 0.5000 48,850.00 0.000 0.00 32 PAVEMENT MARKER (NON-REFLECTIVE) EA 1.1500 14,375.00 0.000 0.00 33 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.0000 21,570.00 0.000 0.00 34 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 2,000.0000 2,000.00 0.160 320.00 0.160 320.00 SYSTEM ELEMENTS DURING CONSTRUCTION 35 DETECTOR LOOP EA 400.0000 160,000.00 63.000 25,200.00 63.000 25,200.00 PROGRAM CAS145 PAGE 3 DATE 11/22/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-274904 TIME 03:01 PM ESTIMATE NO. 03 BID OPENING 07/01/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/10 R.E. NAME: LEVINE, GARY DATE OF THIS ESTIMATE 11/22/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 2,796,665.99 4,079,578.85 ADJUSTMENT OF COMPENSATION 8,776.46 10,793.66 EXTRA WORK 463.63 2,708.28 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 2,805,906.08 4,093,080.79 36 MOBILIZATION LS 738,000.0000 738,000.00 0.250 184,500.00 1.000 738,000.00 ORIGINAL CONTRACT AMOUNT 7,459,608.00 TOTAL WORK COMPLETED 2,990,406.08 4,831,080.79 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -5,000.00 -5,000.00 TOTAL 2,985,406.08 4,826,080.79 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 08/26/10 45 08/26/10 10/20/10 12/27/10 16 3 0 0 64% 36% PROGRESS IS SATISFACTORY LEVINE, GARY RESIDENT ENGINEER PROGRAM CAS145 DATE 11/22/10