PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/07/08 EST. NO.06 TIME 03:19 PM R.E. NAME: AGUILAR, PEDRO 11-276904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0036 808.74 E.W. @ F.A.(+) 112607 N 036 0 004 0001 16,435.78 E.W. @ F.A.(+) 121707 N 001 0 0002 14,431.66 121807 N 002 0 0003 19,883.30 122007 N 003 0 0004 19,322.07 122107 N 004 0 0005 14,793.31 122607 N 005 0 0006 2,903.75 121007 N 006 0 0007 386.56 021108 N 007 0 0008 1,734.76 011408 N 008 0 0009 33,571.10 013108 N 009 0 005 0002 3,378.57 A.C. @ L.S.(+) 022808 N 002 0 127,649.60 TOTAL THIS ESTIMATE 38,709.58 TOTAL PREVIOUS ESTIMATE 166,359.18 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/07/08 EST. NO.06 TIME 03:19 PM R.E. NAME: AGUILAR, PEDRO 11-276904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE MATL OUT-OF-SPEC -1,972.74 06 -1,972.74 -1,972.74 OTHER OUTSTANDING DOCUMENTS CEM-2402(S) -10,000.00 06 -10,000.00 -10,000.00 TOTAL DEDUCTIONS -11,972.74 -11,972.74 PROGRAM CAS145 PAGE 1 DATE 03/07/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-276904 TIME 03:19 PM ESTIMATE NO. 06 BID OPENING 05/31/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/13/08 R.E. NAME: AGUILAR, PEDRO DATE OF THIS ESTIMATE 03/07/08 LOCATION RERUN PROGRESS ESTIMATE AFTER ACCEPTANCE 11-SD-94-39.0/52.9 ---------------------------------------- HAZARD CONSTRUCTION CO. IN SAN DIEGO COUNTY AT POTRERO, P.O. BOX 229000 CANYON CITY AND CAMPO FROM JUNCTION SAN DIEGO,CA 92192-9000 ROUTE 188 TO 1.3 KM EAST OF BUCKMAN SPRINGS ROAD FED. AID NO. N O N E RESURFACE ASPHALT CONCRETE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 18,400.0000 18,400.00 1.000 18,400.00 02 PREPARE WATER POLLUTION CONTROL LS 800.0000 800.00 1.000 800.00 PROGRAM 03 STREET SWEEPING LS 28,500.0000 28,500.00 1.000 28,500.00 04 CONSTRUCTION AREA SIGNS LS 8,500.0000 8,500.00 0.100 850.00 1.000 8,500.00 S) 05 TRAFFIC CONTROL SYSTEM LS 153,000.0000 153,000.00 1.000 153,000.00 S) 06 PORTABLE CHANGEABLE MESSAGE SIGN EA 2,400.0000 4,800.00 2.000 4,800.00 S) 07 REMOVE YELLOW PAINTED TRAFFIC STRIPE M 1.4700 60,417.00 40,303.000 59,245.41 S) 08 REMOVE YELLOW THERMOPLASTIC PAVEMENT M2 500.0000 3,500.00 6.500 3,250.00 S) MARKING 09 LEAD COMPLIANCE PLAN (STRIPE REMOVAL) LS 3,000.0000 3,000.00 1.000 3,000.00 10 REMOVE TRAFFIC STRIPE M 1.2400 55,800.00 35,970.000 44,602.80 S) 11 REMOVE THERMOPLASTIC PAVEMENT MARKING M2 13.0000 871.00 31.641 411.33 S) 12 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 14.5000 11,165.00 762.740 11,059.73 S) 13 IMPORTED BORROW TONN 86.0000 48,160.00 0.000 0.00 14 IMPORTED MATERIAL (SHOULDER BACKING) TONN 138.0000 33,120.00 289.630 39,968.94 15 ASPHALTIC EMULSION (FOG SEAL COAT) TONN 530.0000 16,960.00 3.300 1,749.00 16 ASPHALT CONCRETE TONN 108.0000 38,880.00 692.920 74,835.36 17 RUBBERIZED ASPHALT CONCRETE (TYPE O) TONN 121.0000 1,222,100.00 8,633.990 1,044,712.79 18 PLACE ASPHALT CONCRETE DIKE (MODIFIED) M 2.6600 42,560.00 16,769.000 44,605.54 19 CENTERLINE RUMBLE STRIP (ASPHALT M 0.9000 16,920.00 18,615.000 16,753.50 CONCRETE, GROUND-IN INDENTATIONS) 20 ASPHALTIC EMULSION (PAINT BINDER) TONN 530.0000 50,350.00 46.032 24,396.96 21 FURNISH SINGLE SHEET ALUMINUM SIGN M2 195.0000 2,340.00 11.230 2,189.85 (2.0 MM-FRAMED) 22 ROADSIDE SIGN - TWO POST EA 1,000.0000 1,000.00 1.000 1,000.00 PROGRAM CAS145 PAGE 2 DATE 03/07/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-276904 TIME 03:19 PM ESTIMATE NO. 06 BID OPENING 05/31/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/13/08 R.E. NAME: AGUILAR, PEDRO DATE OF THIS ESTIMATE 03/07/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 INSTALL ROADSIDE SIGN PANEL ON EA 215.0000 860.00 4.000 860.00 EXISTING POST 24 THERMOPLASTIC PAVEMENT MARKING M2 43.0000 3,139.00 103.360 4,444.48 S) 25 PAINT TRAFFIC STRIPE (2-COAT) M 0.3700 24,901.00 66,401.000 24,568.37 S) 26 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.0000 11,520.00 400.000 800.00 5,765.000 11,530.00 S) PROGRAM CAS145 PAGE 3 DATE 03/07/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-276904 TIME 03:19 PM ESTIMATE NO. 06 BID OPENING 05/31/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/13/08 R.E. NAME: AGUILAR, PEDRO DATE OF THIS ESTIMATE 03/07/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 1,650.00 1,627,184.06 ADJUSTMENT OF COMPENSATION 3,378.57 25,236.95 EXTRA WORK 124,271.03 141,122.23 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 129,299.60 1,793,543.24 27 MOBILIZATION LS 150,000.0000 150,000.00 1.000 150,000.00 ORIGINAL CONTRACT AMOUNT 2,011,563.00 TOTAL WORK COMPLETED 129,299.60 1,943,543.24 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -11,972.74 -11,972.74 TOTAL 117,326.86 1,931,570.50 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/28/07 85 07/27/07 07/13/07 02/13/08 85 60 0 0 100% 100% AGUILAR, PEDRO RESIDENT ENGINEER PROGRAM CAS145 DATE 03/07/08