PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/21/07 EST. NO.01 TIME 03:36 PM R.E. NAME: NABIZADEH, MEHRDAD 11-277104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/21/07 EST. NO.01 TIME 03:36 PM R.E. NAME: NABIZADEH, MEHRDAD 11-277104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/21/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-277104 TIME 03:36 PM ESTIMATE NO. 01 BID OPENING 05/31/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/07 R.E. NAME: NABIZADEH, MEHRDAD DATE OF THIS ESTIMATE 08/21/07 LOCATION PROGRESS ESTIMATE 11-SD-78-R16.0/N17.6 ----------------- HAZARD CONSTRUCTION COMPANY IN SAN DIEGO COUNTY IN SAN MARCOS P.O. BOX 229000 AND ESCONDIDO FROM 0.5 MILE WEST OF SAN DIEGO,CA 92192-9000 ROUTE 15 AND 78 SEPARATION TO 0.1 MILE WEST OF BROADWAY FED. AID NO. N O N E RESURFACE ASPHALT CONCRETE OVERLAY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 18,000.0000 18,000.00 0.000 0.00 02 PREPARE STORM WATER POLLUTION LS 1,800.0000 1,800.00 0.000 0.00 PREVENTION PLAN 03 STREET SWEEPING LS 9,000.0000 9,000.00 0.000 0.00 04 CONSTRUCTION AREA SIGNS LS 11,000.0000 11,000.00 0.512 5,632.00 0.512 5,632.00 S) 05 TRAFFIC CONTROL SYSTEM LS 37,000.0000 37,000.00 0.000 0.00 S) 06 PORTABLE CHANGEABLE MESSAGE SIGN EA 2,000.0000 6,000.00 0.000 0.00 S) 07 REMOVE YELLOW PAINTED TRAFFIC STRIPE LF 1.2000 20,280.00 0.000 0.00 S) 08 REMOVE TRAFFIC STRIPE AND PAVEMENT SQFT 0.8000 8,400.00 0.000 0.00 S) MARKING 09 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 3.2500 26,585.00 0.000 0.00 S) 10 LEAD COMPLIANCE PLAN (STRIPE REMOVAL) LS 5,000.0000 5,000.00 0.650 3,250.00 0.650 3,250.00 11 IMPORTED BORROW TON 280.0000 15,120.00 0.000 0.00 12 IMPORTED MATERIAL (SHOULDER BACKING) TON 122.0000 10,492.00 0.000 0.00 13 ASPHALTIC EMULSION (FOG SEAL COAT) TON 520.0000 6,760.00 0.000 0.00 14 ASPHALT CONCRETE TON 177.0000 5,133.00 0.000 0.00 15 RUBBERIZED ASPHALT CONCRETE (TYPE O) TON 104.0000 392,080.00 0.000 0.00 16 PLACE ASPHALT CONCRETE DIKE (MODIFIED) LF 1.1500 7,003.50 0.000 0.00 17 ASPHALTIC EMULSION (PAINT BINDER) TON 520.0000 13,000.00 0.000 0.00 18 FURNISH LAMINATED PANEL SIGN SQFT 28.0000 2,464.00 0.000 0.00 S) (2 1/2"-TYPE H) 19 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 28.0000 1,568.00 0.000 0.00 S) (0.080"-FRAMED) 20 ROADSIDE SIGN - TWO POST EA 650.0000 1,300.00 0.000 0.00 21 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.8500 4,496.50 0.000 0.00 S) 22 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.8000 2,496.00 0.000 0.00 S) (BROKEN 12-3) PROGRAM CAS145 PAGE 2 DATE 08/21/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-277104 TIME 03:36 PM ESTIMATE NO. 01 BID OPENING 05/31/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/07 R.E. NAME: NABIZADEH, MEHRDAD DATE OF THIS ESTIMATE 08/21/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 THERMOPLASTIC PAVEMENT MARKING SQFT 3.3000 990.00 0.000 0.00 S) 24 PAINT TRAFFIC STRIPE (2-COAT) LF 0.2000 7,100.00 0.000 0.00 S) 25 PAVEMENT MARKER (NON-REFLECTIVE) EA 1.5000 2,505.00 0.000 0.00 S) 26 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.3000 4,092.00 0.000 0.00 S) PROGRAM CAS145 PAGE 3 DATE 08/21/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-277104 TIME 03:36 PM ESTIMATE NO. 01 BID OPENING 05/31/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/07 R.E. NAME: NABIZADEH, MEHRDAD DATE OF THIS ESTIMATE 08/21/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 8,882.00 8,882.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 8,882.00 8,882.00 27 MOBILIZATION LS 53,500.0000 53,500.00 0.000 0.00 ORIGINAL CONTRACT AMOUNT 673,165.00 TOTAL WORK COMPLETED 8,882.00 8,882.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 8,882.00 8,882.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/05/07 75 07/20/07 07/20/07 11/06/07 22 0 0 0 1% 29% PROGRESS UNSATISFACTORY NABIZADEH, MEHRDAD RESIDENT ENGINEER PROGRAM CAS145 PAGE 8 DATE 08/21/07