PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/19/08 EST. NO.02 TIME 12:53 PM R.E. NAME: RIZZUTTO, SHAWN 11-284104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/19/08 EST. NO.02 TIME 12:53 PM R.E. NAME: RIZZUTTO, SHAWN 11-284104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 06/19/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-284104 TIME 12:53 PM ESTIMATE NO. 02 BID OPENING 03/13/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/08 R.E. NAME: RIZZUTTO, SHAWN DATE OF THIS ESTIMATE 06/19/08 LOCATION PROGRESS ESTIMATE 11-IMP-8-R23.3/R23.7 ----------------- GRANITE CONSTRUCTION CO. IN IMPERIAL COUNTY NEAR EL CENTRO 2095 HIGHWAY 111 FROM 0.2 MILE WEST TO 0.2 MILE EL CENTRO, CA 92243 EAST OF DUNAWAY ROAD OVERCROSSING FED. AID NO. N O N E REHABILITATE PAVEMENT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 5,000.0000 5,000.00 0.760 3,800.00 0.760 3,800.00 02 PREPARE WATER POLLUTION CONTROL LS 500.0000 500.00 0.750 375.00 0.750 375.00 S) PROGRAM 03 CONSTRUCTION AREA SIGNS LS 15,000.0000 15,000.00 0.519 7,785.00 0.704 10,560.00 S) 04 TRAFFIC CONTROL SYSTEM LS 25,000.0000 25,000.00 0.000 0.00 S) 05 PORTABLE CHANGEABLE MESSAGE SIGN EA 2,500.0000 5,000.00 0.000 0.00 S) 06 REMOVE METAL BEAM GUARD RAILING LF 50.0000 8,000.00 0.000 0.00 S) 07 REMOVE ASPHALT CONCRETE DIKE LF 3.0000 2,940.00 0.000 0.00 08 RESET ROADSIDE SIGN EA 1,000.0000 2,000.00 0.000 0.00 09 REMOVE CONCRETE CY 2,000.0000 4,400.00 0.000 0.00 10 ROADWAY EXCAVATION CY 50.0000 102,500.00 0.000 0.00 11 CLASS 2 AGGREGATE BASE CY 150.0000 3,150.00 0.000 0.00 12 ASPHALTIC EMULSION (FOG SEAL COAT) TON 3,000.0000 4,200.00 0.000 0.00 13 ASPHALT CONCRETE (TYPE HS) TON 80.0000 324,000.00 0.000 0.00 14 ASPHALT CONCRETE TON 90.0000 12,600.00 0.000 0.00 15 PLACE ASPHALT CONCRETE DIKE LF 1.0000 5,550.00 0.000 0.00 16 PLACE ASPHALT CONCRETE (MISCELLANEOUS SQYD 100.0000 2,400.00 0.000 0.00 AREA) 17 ASPHALTIC EMULSION (PAINT BINDER) TON 3,000.0000 9,300.00 0.000 0.00 18 MINOR CONCRETE (MINOR STRUCTURE) CY 4,000.0000 24,000.00 0.000 0.00 19 GUARD RAILING DELINEATOR EA 24.0000 288.00 0.000 0.00 20 METAL BEAM GUARD RAILING LF 60.0000 21,000.00 0.000 0.00 S) 21 TRANSITION RAILING (TYPE WB) EA 4,500.0000 18,000.00 0.000 0.00 S) 22 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 3,800.0000 15,200.00 0.000 0.00 S) PROGRAM CAS145 PAGE 2 DATE 06/19/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-284104 TIME 12:53 PM ESTIMATE NO. 02 BID OPENING 03/13/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/08 R.E. NAME: RIZZUTTO, SHAWN DATE OF THIS ESTIMATE 06/19/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 8" THERMOPLASTIC TRAFFIC STRIPE LF 2.0000 260.00 0.000 0.00 S) 24 THERMOPLASTIC PAVEMENT MARKING SQFT 4.0000 1,720.00 0.000 0.00 S) 25 PAINT TRAFFIC STRIPE (2-COAT) LF 1.0000 9,950.00 0.000 0.00 S) 26 PAVEMENT MARKER (RETROREFLECTIVE) EA 9.0000 1,530.00 0.000 0.00 S) 27 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,000.0000 1,000.00 0.000 0.00 S) SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 3 DATE 06/19/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-284104 TIME 12:53 PM ESTIMATE NO. 02 BID OPENING 03/13/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/08 R.E. NAME: RIZZUTTO, SHAWN DATE OF THIS ESTIMATE 06/19/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 11,960.00 14,735.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 11,960.00 14,735.00 28 MOBILIZATION LS 60,500.0000 60,500.00 0.000 0.00 ORIGINAL CONTRACT AMOUNT 684,988.00 TOTAL WORK COMPLETED 11,960.00 14,735.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 11,960.00 14,735.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/11/08 50 00/00/00 04/28/08 07/09/08 38 1 0 0 2% 76% PROGRESS UNSATISFACTORY RIZZUTTO, SHAWN RESIDENT ENGINEER PROGRAM CAS145 PAGE 6 DATE 06/19/08