PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 02/22/10 EST. NO.04 TIME 03:02 PM R.E. NAME: BAGUBE, JUN 11-284304 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 02/22/10 EST. NO.04 TIME 03:02 PM R.E. NAME: BAGUBE, JUN 11-284304 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION O/S PRS JAN -3,000.00 04 -3,000.00 -3,000.00 TOTAL DEDUCTIONS -3,000.00 -3,000.00 PROGRAM CAS145 PAGE 1 DATE 02/22/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-284304 TIME 03:02 PM ESTIMATE NO. 04 BID OPENING 10/15/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/10 R.E. NAME: BAGUBE, JUN DATE OF THIS ESTIMATE 02/22/10 LOCATION PROGRESS ESTIMATE 11-SD-5-9.6/R26.2 ----------------- HAZARD CONSTRUCTION COMPANY IN SAN DIEGO COUNTY AT VARIOUS 6465 MARINDUSTRY PLACE LOCATIONS SAN DIEGO,CA 92192 FED. AID NO. OTS- ( ) MOVE MBGR AND REPLACE WITH CONCRETE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 5,000.0000 5,000.00 0.250 1,250.00 0.250 1,250.00 02 SMALL BUSINESS UTILIZATION REPORT EA 250.0000 1,000.00 1.000 250.00 1.000 250.00 03 TIME-RELATED OVERHEAD LS 150,000.0000 150,000.00 0.000 0.00 04 CONSTRUCTION SITE MANAGEMENT LS 15,000.0000 15,000.00 0.000 0.00 05 PREPARE WATER POLLUTION CONTROL LS 2,000.0000 2,000.00 0.750 1,500.00 PROGRAM 06 TEMPORARY DRAINAGE INLET PROTECTION EA 250.0000 6,500.00 13.000 3,250.00 13.000 3,250.00 07 STREET SWEEPING LS 10,000.0000 10,000.00 0.350 3,500.00 0.350 3,500.00 08 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 8,500.0000 8,500.00 0.350 2,975.00 0.350 2,975.00 09 CONSTRUCTION AREA SIGNS LS 13,000.0000 13,000.00 0.750 9,750.00 10 TRAFFIC CONTROL SYSTEM LS 275,000.0000 275,000.00 0.290 79,750.00 0.350 96,250.00 11 TEMPORARY TRAFFIC STRIPE (PAINT) LF 0.4000 7,520.00 7,600.000 3,040.00 7,600.000 3,040.00 12 TRAFFIC PLASTIC DRUM EA 20.0000 3,600.00 56.000 1,120.00 87.000 1,740.00 13 TEMPORARY PAVEMENT MARKER EA 6.0000 4,080.00 337.000 2,022.00 337.000 2,022.00 14 PORTABLE CHANGEABLE MESSAGE SIGN EA 3,000.0000 15,000.00 3.000 9,000.00 5.000 15,000.00 15 TEMPORARY RAILING (TYPE K) LF 7.0000 139,300.00 5,400.000 37,800.00 6,800.000 47,600.00 16 TEMPORARY CRASH CUSHION MODULE EA 300.0000 126,000.00 154.000 46,200.00 259.000 77,700.00 17 TEMPORARY CRASH CUSHION (ADIEM) EA 4,500.0000 18,000.00 1.000 4,500.00 18 REMOVE METAL BEAM GUARD RAILING LF 8.0000 42,080.00 1,494.000 11,952.00 1,494.000 11,952.00 19 LEAD COMPLIANCE PLAN (STRIPE REMOVAL) LS 3,500.0000 3,500.00 0.000 0.00 20 REMOVE YELLOW PAINTED TRAFFIC STRIPE LF 1.5000 6,405.00 2,978.000 4,467.00 2,978.000 4,467.00 21 REMOVE TRAFFIC STRIPE LF 0.7000 7,070.00 3,690.000 2,583.00 3,690.000 2,583.00 22 REMOVE ASPHALT CONCRETE DIKE LF 3.0000 1,530.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 02/22/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-284304 TIME 03:02 PM ESTIMATE NO. 04 BID OPENING 10/15/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/10 R.E. NAME: BAGUBE, JUN DATE OF THIS ESTIMATE 02/22/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 REMOVE INLET EA 1,500.0000 1,500.00 0.000 0.00 24 REMOVE CONCRETE BLOCK WALL LF 150.0000 3,000.00 0.000 0.00 25 REMOVE CONCRETE BARRIER (TYPE K) LF 5.0000 800.00 40.000 200.00 200.000 1,000.00 26 REMOVE CRASH CUSHION EA 2,500.0000 32,500.00 5.000 12,500.00 5.000 12,500.00 27 MODIFY CONCRETE BARRIER LF 200.0000 2,400.00 0.000 0.00 28 ROADWAY EXCAVATION CY 50.0000 168,000.00 234.000 11,700.00 234.000 11,700.00 29 IRRIGATION SYSTEM LS 70,000.0000 70,000.00 0.171 11,970.00 0.171 11,970.00 30 EXTEND 10" CONDUIT LF 480.0000 19,200.00 32.000 15,360.00 32.000 15,360.00 31 CLASS 2 AGGREGATE BASE CY 150.0000 216,000.00 0.000 0.00 32 MINOR HOT MIX ASPHALT TON 190.0000 66,500.00 0.000 0.00 33 MINOR CONCRETE (MINOR STRUCTURE) CY 1,250.0000 7,500.00 0.000 0.00 F) 34 24" REINFORCED CONCRETE PIPE LF 75.0000 12,000.00 0.000 0.00 35 CONCRETE (SLOPE PROTECTION) CY 500.0000 34,000.00 0.000 0.00 36 MINOR CONCRETE (CHANNEL LINING) CY 800.0000 7,200.00 0.000 0.00 37 MISCELLANEOUS IRON AND STEEL LB 2.0000 1,130.00 0.000 0.00 F) 38 STEEL-BACKED TIMBER GUARDRAIL LF 110.0000 44,000.00 0.000 0.00 39 TRANSITION RAILING (TYPE WB) EA 3,200.0000 9,600.00 0.000 0.00 40 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 3,200.0000 3,200.00 0.000 0.00 41 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,700.0000 5,400.00 0.000 0.00 42 CRASH CUSHION (REACT 4CBB) EA 45,000.0000 45,000.00 0.000 0.00 43 CRASH CUSHION (REACT 9CBB) EA 51,000.0000 765,000.00 7.000 357,000.00 7.000 357,000.00 44 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 45 CONCRETE BARRIER (TYPE 60 MOD) LF 85.0000 123,250.00 730.000 62,050.00 730.000 62,050.00 46 CONCRETE BARRIER (TYPE 60) LF 75.0000 549,750.00 2,264.000 169,800.00 2,264.000 169,800.00 47 CONCRETE BARRIER (TYPE 60C) LF 145.0000 321,900.00 0.000 0.00 48 CONCRETE BARRIER (TYPE 60GE MOD) LF 380.0000 32,680.00 0.000 0.00 49 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 2,260.00 0.000 0.00 PROGRAM CAS145 PAGE 3 DATE 02/22/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-284304 TIME 03:02 PM ESTIMATE NO. 04 BID OPENING 10/15/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/10 R.E. NAME: BAGUBE, JUN DATE OF THIS ESTIMATE 02/22/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.9000 486.00 0.000 0.00 (BROKEN 12-3) 51 PAINT TRAFFIC STRIPE (2-COAT) LF 0.4000 5,240.00 0.000 0.00 52 PAVEMENT MARKER (NON-REFLECTIVE) EA 4.0000 800.00 0.000 0.00 53 PAVEMENT MARKER (RETROREFLECTIVE) EA 5.0000 1,850.00 0.000 0.00 54 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,000.0000 1,000.00 0.000 0.00 SYSTEM ELEMENTS DURING CONSTRUCTION 55 MODIFY FLASHING BEACON LS 12,000.0000 12,000.00 1.000 12,000.00 1.000 12,000.00 56 MODIFY TRAFFIC MONITORING STATION LS 5,000.0000 5,000.00 0.500 2,500.00 0.500 2,500.00 57 MODIFY LIGHTING AND SIGN ILLUMINATION LS 47,000.0000 47,000.00 0.930 43,710.00 0.930 43,710.00 PROGRAM CAS145 PAGE 4 DATE 02/22/10 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-284304 TIME 03:02 PM ESTIMATE NO. 04 BID OPENING 10/15/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/10 R.E. NAME: BAGUBE, JUN DATE OF THIS ESTIMATE 02/22/10 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 907,949.00 988,919.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 907,949.00 988,919.00 58 MOBILIZATION LS 367,000.0000 367,000.00 0.950 348,650.00 ORIGINAL CONTRACT AMOUNT 3,844,231.00 TOTAL WORK COMPLETED 907,949.00 1,337,569.00 MATERIALS ON HAND ON SITE 349,124.71 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -3,000.00 -3,000.00 TOTAL 904,949.00 1,683,693.71 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 11/30/09 49 00/00/00 12/15/09 03/30/10 17 28 0 0 35% 35% PROGRESS IS SATISFACTORY BAGUBE, JUN RESIDENT ENGINEER PROGRAM CAS145 DATE 02/22/10