PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 09/24/07 EST. NO.02 TIME 02:22 PM R.E. NAME: REYES, JULIO 11-284904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 09/24/07 EST. NO.02 TIME 02:22 PM R.E. NAME: REYES, JULIO 11-284904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE NO BASELINE SCHEDULE -17,455.20 02 -17,455.20 -17,455.20 LABOR COMPLIANCE VIOLATION O/S PRS AUG -6,982.08 02 -6,982.08 -6,982.08 LIQUIDATED DAMAGES ANTIC 13 DAYS@ $3800 -49,400.00 02 -49,400.00 -49,400.00 TOTAL DEDUCTIONS -73,837.28 -73,837.28 PROGRAM CAS145 PAGE 1 DATE 09/24/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-284904 TIME 02:22 PM ESTIMATE NO. 02 BID OPENING 06/07/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/07 R.E. NAME: REYES, JULIO DATE OF THIS ESTIMATE 09/24/07 LOCATION PROGRESS ESTIMATE 11-SD-94-R10.4/14.9 ----------------- VALLEY SLURRY SEAL COMPANY IN SAN DIEGO COUNTY IN AND NEAR 3050 BEACON BLVD. LA MESA FROM THE WEST 94 AND 125 W. SACRAMENTO,CA 95691 SEPARATION TO ROUTE 54 FED. AID NO. N O N E RESURFACING AND FOG SEAL ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 2,500.0000 2,500.00 0.000 0.00 02 PREPARE WATER POLLUTION CONTROL LS 750.0000 750.00 0.500 375.00 0.500 375.00 PROGRAM 03 CONSTRUCTION AREA SIGNS LS 17,745.0000 17,745.00 0.329 5,838.11 S) 04 TRAFFIC CONTROL SYSTEM LS 407,500.0000 407,500.00 0.086 35,045.00 0.086 35,045.00 S) 05 PORTABLE CHANGEABLE MESSAGE SIGN EA 4,000.0000 16,000.00 0.343 1,372.00 0.343 1,372.00 S) 06 REMOVE YELLOW PAINTED TRAFFIC STRIPE LF 0.8900 28,747.00 12,344.000 10,986.16 12,344.000 10,986.16 S) 07 LEAD COMPLIANCE PLAN (STRIPE REMOVAL) LS 4,200.0000 4,200.00 0.500 2,100.00 0.500 2,100.00 08 REMOVE TRAFFIC STRIPE AND PAVEMENT SQFT 0.6300 24,633.00 31,655.000 19,942.65 31,655.000 19,942.65 S) MARKING 09 REMOVE ROADSIDE SIGN EA 210.0000 1,890.00 0.000 0.00 10 ASPHALTIC EMULSION (FOG SEAL COAT) TON 500.0000 20,000.00 0.000 0.00 11 MICROSURFACING TON 165.7700 480,733.00 0.000 0.00 12 FURNISH LAMINATED PANEL SIGN (1"-TYPE B) SQFT 22.7500 9,555.00 0.000 0.00 S) 13 FURNISH LAMINATED PANEL SIGN SQFT 23.3600 8,876.80 0.000 0.00 S) (2.5"-TYPE H) 14 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 15.2200 91.32 0.000 0.00 S) (.063"-UNFRAMED) 15 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 12.1800 1,169.28 0.000 0.00 S) (.080"-UNFRAMED) 16 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 16.7500 2,680.00 0.000 0.00 S) (.063"-FRAMED) 17 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 16.7500 4,522.50 0.000 0.00 S) (.080"-FRAMED) 18 INSTALL SIGN OVERLAY SQFT 36.7500 220.50 0.000 0.00 19 INSTALL ROADSIDE SIGN PANEL ON EA 315.0000 4,095.00 0.000 0.00 EXISTING POST 20 INSTALL ROADSIDE SIGN EA 5,670.0000 39,690.00 0.000 0.00 (LAMINATED WOOD BOX POST) 21 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.7300 8,395.00 0.000 0.00 S) 22 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.6300 2,532.60 0.000 0.00 S) (BROKEN 12-3) PROGRAM CAS145 PAGE 2 DATE 09/24/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-284904 TIME 02:22 PM ESTIMATE NO. 02 BID OPENING 06/07/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/07 R.E. NAME: REYES, JULIO DATE OF THIS ESTIMATE 09/24/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 THERMOPLASTIC PAVEMENT MARKING SQFT 2.8900 6,011.20 0.000 0.00 S) 24 PAINT TRAFFIC STRIPE (2-COAT) LF 0.1600 19,200.00 0.000 0.00 S) 25 PAVEMENT MARKER (NON-REFLECTIVE) EA 1.1500 3,392.50 0.000 0.00 S) 26 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.9400 8,790.60 0.000 0.00 S) PROGRAM CAS145 PAGE 3 DATE 09/24/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-284904 TIME 02:22 PM ESTIMATE NO. 02 BID OPENING 06/07/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/07 R.E. NAME: REYES, JULIO DATE OF THIS ESTIMATE 09/24/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 69,820.81 75,658.92 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 69,820.81 75,658.92 27 MOBILIZATION LS 55,250.0000 55,250.00 0.500 27,625.00 0.500 27,625.00 ORIGINAL CONTRACT AMOUNT 1,179,170.30 TOTAL WORK COMPLETED 97,445.81 103,283.92 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -73,837.28 -73,837.28 TOTAL 23,608.53 29,446.64 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/05/07 70 07/24/07 07/19/07 10/29/07 44 0 0 0 9% 63% PROGRESS IS SATISFACTORY UNSATIS PROGRESS OVERRIDDEN AND PCNT TIME ELAPSED INPUT BECAUSE LD'S TAKEN REYES, JULIO RESIDENT ENGINEER PROGRAM CAS145 PAGE 12 DATE 09/24/07