PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/25/11 EST. NO.04 TIME 01:43 PM R.E. NAME: HURTZIG, JOHN 11-291904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 002 0002 640.14 A.C. @ U.P.(+) 051911 N 2 0 640.14 TOTAL THIS ESTIMATE 18,539.89 TOTAL PREVIOUS ESTIMATE 19,180.03 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/25/11 EST. NO.04 TIME 01:43 PM R.E. NAME: HURTZIG, JOHN 11-291904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION O/S PRS MARCH -1,000.00 03 O/S PRS APRIL 2011 -2,000.00 04 PRS RECD MARCH 2011 1,000.00 04 -1,000.00 -2,000.00 TOTAL DEDUCTIONS -1,000.00 -2,000.00 PROGRAM CAS145 PAGE 1 DATE 05/25/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-291904 TIME 01:43 PM ESTIMATE NO. 04 BID OPENING 10/07/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/11 R.E. NAME: HURTZIG, JOHN DATE OF THIS ESTIMATE 05/25/11 LOCATION PROGRESS ESTIMATE 11-SD-15-R8.4/ .0 ----------------- L B CIVIL CONSTRUCTION IN SAN DIEGO COUNTY AT VARIOUS INCORPORATED LOCATIONS 11585 SORRENTO VALLEY RD 104 SAN DIEGO CA 92121 FED. AID NO. ACST-X073(89)E ,P-X073(89)E CONCRETE SLOPE PAVING AND PLANTING ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 SMALL BUSINESS UTILIZATION REPORT EA 250.0000 1,000.00 1.000 250.00 02 TEMPORARY FENCE (TYPE ESA) LF 4.0000 5,000.00 1,258.000 5,032.00 03 CONSTRUCTION SITE MANAGEMENT LS 10,000.0000 10,000.00 0.157 1,570.00 0.521 5,210.00 04 PREPARE STORM WATER POLLUTION LS 2,000.0000 2,000.00 0.450 900.00 PREVENTION PLAN 05 TEMPORARY FIBER ROLL LF 2.0000 23,400.00 1,517.350 3,034.70 5,198.810 10,397.62 06 TEMPORARY CONSTRUCTION ENTRANCE EA 4,000.0000 32,000.00 0.960 3,840.00 4.000 16,000.00 07 TEMPORARY DRAINAGE INLET PROTECTION EA 400.0000 5,200.00 1.700 680.00 4.540 1,816.00 08 STREET SWEEPING LS 5,000.0000 5,000.00 0.000 0.00 09 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 5,000.0000 5,000.00 0.157 785.00 0.521 2,605.00 10 CONSTRUCTION AREA SIGNS LS 10,000.0000 10,000.00 0.047 470.00 0.756 7,560.00 11 TRAFFIC CONTROL SYSTEM LS 25,000.0000 25,000.00 0.157 3,925.00 0.521 13,025.00 12 PORTABLE CHANGEABLE MESSAGE SIGN EA 10,000.0000 40,000.00 0.310 3,100.00 3.040 30,400.00 13 REMOVE CHAIN LINK FENCE LF 2.0000 3,120.00 968.000 1,936.00 14 REMOVE ASPHALT CONCRETE DIKE LF 8.0000 6,160.00 764.000 6,112.00 764.000 6,112.00 15 RESET ROADSIDE SIGN EA 150.0000 450.00 0.000 0.00 16 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 25.0000 4,500.00 170.000 4,250.00 170.000 4,250.00 17 REMOVE CONCRETE (MISCELLANEOUS) CY 200.0000 9,800.00 176.500 35,300.00 18 LEAD COMPLIANCE PLAN LS 5,000.0000 5,000.00 0.675 3,375.00 19 ROADSIDE CLEARING LS 144,000.0000 144,000.00 0.218 31,392.00 0.624 89,856.00 20 PREPARE SLOPE SQFT 0.7500 8,550.00 10,232.000 7,674.00 21 ROCK BLANKET SQYD 45.0000 36,000.00 783.000 35,235.00 783.000 35,235.00 22 DECOMPOSED GRANITE (MISCELLANEOUS AREAS) SQFT 7.0000 20,300.00 400.000 2,800.00 400.000 2,800.00 (SQFT) PROGRAM CAS145 PAGE 2 DATE 05/25/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-291904 TIME 01:43 PM ESTIMATE NO. 04 BID OPENING 10/07/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/11 R.E. NAME: HURTZIG, JOHN DATE OF THIS ESTIMATE 05/25/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 ROCK MULCH SQYD 40.0000 24,800.00 222.000 8,880.00 318.000 12,720.00 24 CULTIVATE SQYD 3.0000 10,200.00 0.000 0.00 25 MULCH CY 46.0000 26,680.00 0.000 0.00 26 COMMERCIAL FERTILIZER (SLOW RELEASE) LB 3.5000 4,200.00 0.000 0.00 27 EROSION CONTROL (COMPOST BLANKET) CY 32.0000 13,120.00 0.000 0.00 28 FIBER ROLLS LF 2.0000 15,920.00 0.000 0.00 29 EROSION CONTROL (HYDROSEED) (SQFT) SQFT 0.4000 27,440.00 0.000 0.00 30 ROLLED EROSION CONTROL PRODUCT SQFT 0.3000 18,330.00 0.000 0.00 (NETTING) 31 PLANT (GROUP F) EA 0.6000 32,340.00 0.000 0.00 32 PLANT (GROUP H) EA 0.3000 20,758.50 0.000 0.00 F) 33 TURF (SOD) SQFT 1.2000 36,000.00 0.000 0.00 34 PLANT ESTABLISHMENT WORK LS 35,000.0000 35,000.00 0.000 0.00 35 REMOVE EXISTING IRRIGATION FACILITIES LS 2,000.0000 2,000.00 0.800 1,600.00 36 CONTROL AND NEUTRAL CONDUCTORS LS 25,000.0000 25,000.00 0.000 0.00 37 1" ELECTRIC REMOTE CONTROL VALVE EA 300.0000 600.00 0.000 0.00 38 1 1/2" ELECTRIC REMOTE CONTROL VALVE EA 300.0000 4,500.00 0.000 0.00 39 2" GALVANIZED STEEL PIPE (SUPPLY LINE) LF 23.0000 9,430.00 0.000 0.00 40 4" GALVANIZED STEEL PIPE (SUPPLY LINE) LF 80.0000 32,800.00 0.000 0.00 41 1" PLASTIC PIPE (PR 200) (SUPPLY LINE) LF 6.0000 27,606.00 0.000 0.00 F) 42 1 1/4" PLASTIC PIPE (PR 200) LF 6.0000 9,078.00 0.000 0.00 F) (SUPPLY LINE) 43 1 1/2" PLASTIC PIPE (PR 200) LF 7.0000 7,189.00 0.000 0.00 F) (SUPPLY LINE) 44 2" PLASTIC PIPE (PR 200) (SUPPLY LINE) LF 7.0000 8,736.00 0.000 0.00 F) 45 2 1/2" PLASTIC PIPE (PR 200) LF 8.0000 6,936.00 0.000 0.00 F) (SUPPLY LINE) 46 2" PLASTIC PIPE (PR 315) (SUPPLY LINE) LF 20.0000 1,600.00 0.000 0.00 F) 47 2 1/2" PLASTIC PIPE (PR 315) LF 15.0000 1,050.00 0.000 0.00 F) (SUPPLY LINE) 48 3" PLASTIC PIPE (PR 315) (SUPPLY LINE) LF 15.0000 33,810.00 0.000 0.00 F) 49 4" PLASTIC PIPE (PR 315) (SUPPLY LINE) LF 15.0000 2,850.00 0.000 0.00 F) PROGRAM CAS145 PAGE 3 DATE 05/25/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-291904 TIME 01:43 PM ESTIMATE NO. 04 BID OPENING 10/07/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/11 R.E. NAME: HURTZIG, JOHN DATE OF THIS ESTIMATE 05/25/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 6" PLASTIC PIPE (PR 315) (SUPPLY LINE) LF 25.0000 3,500.00 0.000 0.00 F) 51 SPRINKLER (TYPE A-5) EA 50.0000 2,700.00 0.000 0.00 52 SPRINKLER (TYPE A-6) EA 100.0000 200.00 0.000 0.00 53 SPRINKLER (TYPE A-7) EA 50.0000 2,650.00 0.000 0.00 54 SPRINKLER (TYPE A-8) EA 100.0000 4,300.00 0.000 0.00 55 SPRINKLER (TYPE B-1) EA 25.0000 1,000.00 0.000 0.00 56 SPRINKLER (TYPE C-2 MOD) EA 65.0000 5,200.00 0.000 0.00 57 2" GATE VALVE EA 400.0000 2,000.00 0.000 0.00 58 3" GATE VALVE EA 900.0000 8,100.00 0.000 0.00 59 8" CORRUGATED HIGH DENSITY LF 30.0000 28,500.00 320.000 9,600.00 POLYETHYLENE PIPE CONDUIT 60 12" CORRUGATED HIGH DENSITY LF 45.0000 4,950.00 110.000 4,950.00 POLYETHYLENE PIPE CONDUIT 61 RECYCLED WATER WARNING SIGNS LS 1,000.0000 1,000.00 0.000 0.00 62 ASPHALTIC EMULSION (FOG SEAL COAT) TON 3,500.0000 1,050.00 0.000 0.00 63 MINOR HOT MIX ASPHALT TON 200.0000 8,000.00 30.380 6,076.00 30.380 6,076.00 64 HOT MIX ASPHALT DIKE LF 5.0000 3,850.00 764.000 3,820.00 764.000 3,820.00 65 8" CORRUGATED STEEL PIPE (.079" THICK) LF 90.0000 4,500.00 20.000 1,800.00 45.000 4,050.00 66 SLOPE PAVING (CONCRETE) CY 510.0000 606,900.00 1.710 872.10 1,073.350 547,408.50 67 MINOR CONCRETE (MISCELLANEOUS CY 650.0000 20,150.00 29.350 19,077.50 29.350 19,077.50 CONSTRUCTION) 68 MINOR CONCRETE (TEXTURED PAVING) SQFT 11.0000 22,440.00 1,908.000 20,988.00 1,908.000 20,988.00 69 CHAIN LINK FENCE (TYPE CL-4) LF 14.0000 8,680.00 0.000 0.00 70 CHAIN LINK FENCE (TYPE CL-4, VINYL-CLAD) LF 25.0000 20,500.00 0.000 0.00 71 CHAIN LINK FENCE (TYPE CL-6) LF 15.0000 13,950.00 115.000 1,725.00 924.000 13,860.00 72 6' CHAIN LINK GATE EA 900.0000 1,800.00 0.000 0.00 (TYPE CL-4, VINYL-CLAD) 73 6' CHAIN LINK GATE (TYPE CL-6) EA 800.0000 1,600.00 0.000 0.00 74 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 5,000.0000 5,000.00 0.157 785.00 0.521 2,605.00 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 4 DATE 05/25/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-291904 TIME 01:43 PM ESTIMATE NO. 04 BID OPENING 10/07/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/11 R.E. NAME: HURTZIG, JOHN DATE OF THIS ESTIMATE 05/25/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 161,217.30 926,488.62 ADJUSTMENT OF COMPENSATION 640.14 19,180.03 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 161,857.44 945,668.65 75 MOBILIZATION LS 128,000.0000 128,000.00 0.050 6,400.00 1.000 128,000.00 ORIGINAL CONTRACT AMOUNT 1,749,973.50 TOTAL WORK COMPLETED 168,257.44 1,073,668.65 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -1,000.00 -2,000.00 TOTAL 167,257.44 1,071,668.65 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/14/10 390 01/14/11 02/07/11 08/27/12 71 2 0 0 60% 51% PROGRESS IS SATISFACTORY HURTZIG, JOHN RESIDENT ENGINEER PROGRAM CAS145 DATE 05/25/11