PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 11/28/17 EST. NO. 001 TIME 09:55 AM R.E. NAME: LAMAN, MATTHEW 11-292004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 11/28/17 EST. NO. 001 TIME 09:55 AM R.E. NAME: LAMAN, MATTHEW 11-292004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 11/28/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-292004 TIME 09:55 AM ESTIMATE NO. 001 BID OPENING 05/31/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/17 R.E. NAME: LAMAN, MATTHEW DATE OF THIS ESTIMATE 11/28/17 LOCATION RERUN PROGRESS ESTIMATE 11-SD-125-9.8/12.4 ----------------------- WESTERN RIM CONSTRUCTORS, IN SAN DIEGO COUNTY IN AND NEAR INC. LEMON GROVE FROM PARADISE VALLEY 621 S ANDREASEN DRIVE, SUITE ROAD OVERCROSSING TO 0.3 MILE NORTH ESCONDIDO CA 92029 OF TROY STREET OVERCROSSING FED. AID NO. ACNH-P125(19)E STORMWATER MITIGATION - MEDIAN ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,200.0000 2,200.00 0.750 1,650.00 0.750 1,650 002 CONSTRUCTION AREA SIGNS LS 7,150.0000 7,150.00 0.000 0 003 TRAFFIC CONTROL SYSTEM LS 119,600.0000 119,600.00 0.000 0 004 TRAFFIC PLASTIC DRUM EA 42.9000 1,287.00 0.000 0 005 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 5,500.0000 11,000.00 0.000 0 006 TEMPORARY RAILING (TYPE K) LF 18.7900 47,350.80 0.000 0 007 JOB SITE MANAGEMENT LS 13,640.0000 13,640.00 0.000 0 008 PREPARE STORM WATER POLLUTION PREVENTION LS 2,750.0000 2,750.00 0.000 0 PLAN 009 RAIN EVENT ACTION PLAN EA 500.0000 4,000.00 0.000 0 010 STORM WATER SAMPLING AND ANALYSIS DAY EA 550.0000 550.00 0.000 0 011 STORM WATER ANNUAL REPORT EA 2,000.0000 4,000.00 0.000 0 012 TEMPORARY DRAINAGE INLET PROTECTION EA 330.0000 8,910.00 0.000 0 013 TEMPORARY FIBER ROLL LF 4.2300 3,299.40 0.000 0 014 TEMPORARY CONSTRUCTION ENTRANCE EA 3,850.0000 23,100.00 0.000 0 015 STREET SWEEPING LS 11,000.0000 11,000.00 0.000 0 016 TEMPORARY CONCRETE WASHOUT LS 550.0000 550.00 0.000 0 017 TREATED WOOD WASTE LB 2.2000 3,080.00 0.000 0 018 REMOVE CONCRETE (CY) CY 141.2800 6,498.88 0.000 0 019 CLEARING AND GRUBBING (LS) LS 129,280.0000 129,280.00 0.000 0 020 DUST SUPPRESSANT SQYD 0.4700 11,092.00 0.000 0 021 ROADSIDE CLEARING LS 11,000.0000 11,000.00 0.000 0 022 MODIFY EXISTING PLANT BASINS EA 880.0000 140,800.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 11/28/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-292004 TIME 09:55 AM ESTIMATE NO. 001 BID OPENING 05/31/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/17 R.E. NAME: LAMAN, MATTHEW DATE OF THIS ESTIMATE 11/28/17 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 PACKET FERTILIZER EA 0.5500 1,171.50 0.000 0 024 PLANT (GROUP B) EA 22.0000 23,540.00 0.000 0 025 MAINTAIN EXISTING PLANTED AREAS LS 3,300.0000 3,300.00 0.000 0 026 PLANT ESTABLISHMENT WORK LS 16,500.0000 16,500.00 0.000 0 027 GRAVEL MULCH SQFT 2.7100 52,845.00 0.000 0 028 CHECK AND TEST EXISTING IRRIGATION LS 3,300.0000 3,300.00 0.000 0 FACILITIES 029 REMOVE IRRIGATION FACILITY LS 5,500.0000 5,500.00 0.000 0 030 CERTIFY EXISTING BACKFLOW PREVENTERS LS 2,750.0000 2,750.00 0.000 0 031 RISER SPRINKLER ASSEMBLY EA 16.5000 20,130.00 0.000 0 032 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LF 3.3000 36,623.40 0.000 0 (F) LINE) 033 1 1/4" PLASTIC PIPE (SCHEDULE 40) LF 3.8500 4,989.60 0.000 0 (F) (SUPPLY LINE) 034 1 1/2" PLASTIC PIPE (SCHEDULE 40) LF 4.1300 4,163.04 0.000 0 (F) (SUPPLY LINE) 035 2" PLASTIC PIPE (SCHEDULE 40) LF 5.5000 8,305.00 0.000 0 (F) (SUPPLY LINE) 036 HYDROMULCH SQFT 0.0300 9,870.00 0.000 0 037 COMPOST SOCK LF 7.0500 5,499.00 0.000 0 038 INJECT CRACK (EPOXY) LF 55.0000 9,900.00 0.000 0 039 CONCRETE FLEXIBLE MAT SQFT 8.3700 1,740,960.00 0.000 0 040 ROCK SLOPE PROTECTION CY 534.9100 7,488.74 0.000 0 (F) (LIGHT, METHOD B) (CY) 041 ROCK SLOPE PROTECTION CY 698.6102 3,423.19 0.000 0 (F) (NO. 3, METHOD B) (CY) 042 CONCRETE (CONCRETE APRON) CY 806.7800 37,111.88 0.000 0 043 ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 37.5800 901.92 0.000 0 044 RECONSTRUCT THRIE BEAM BARRIER LF 41.5300 40,699.40 0.000 0 PROGRAM CAS145 PAGE 3 DATE 11/28/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-292004 TIME 09:55 AM ESTIMATE NO. 001 BID OPENING 05/31/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/17 R.E. NAME: LAMAN, MATTHEW DATE OF THIS ESTIMATE 11/28/17 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 1,650.00 1,650.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 1,650.00 1,650.00 045 MOBILIZATION LS 280,000.0000 280,000.00 0.000 0 ORIGINAL CONTRACT AMOUNT 2,881,109.75 TOTAL WORK COMPLETED 1,650.00 1,650.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 1,650.00 1,650.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 08/29/17 450 11/13/17 11/13/17 12/31/19 5 0 0 0 0% 1% PROGRESS IS SATISFACTORY LAMAN, MATTHEW RESIDENT ENGINEER PROGRAM CAS145 DATE 11/28/17