PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/28/11 EST. NO.05 TIME 12:59 PM R.E. NAME: GARY LEVINE 11-298504 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/28/11 EST. NO.05 TIME 12:59 PM R.E. NAME: GARY LEVINE 11-298504 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE O/S 2402(F), 2403(F) -5,000.00 04 O/S 4401 -3,000.00 04 2402 (F) RECD 5,000.00 05 4401 RECD 3,000.00 05 8,000.00 0.00 LABOR COMPLIANCE VIOLATION O/S PRS JAN -2,000.00 02 PRS RECD JAN 2,000.00 03 0.00 0.00 TOTAL DEDUCTIONS 8,000.00 0.00 PROGRAM CAS145 PAGE 1 DATE 06/28/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-298504 TIME 12:59 PM ESTIMATE NO. 05 BID OPENING 06/17/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/21/11 R.E. NAME: GARY LEVINE DATE OF THIS ESTIMATE 06/28/11 LOCATION FINAL ESTIMATE 11-SD-78-37.4/44.5 -------------- HAZARD CONSTRUCTION IN SAN DIEGO COUNTY NEAR RAMONA P O BOX 229000 SAN DIEGO CA 921929000 FED. AID NO. ACHS-P078(109)E ,STP-P078(109)E INSTALL CENTERLINE RUMBLE STRIP ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 SMALL BUSINESS UTILIZATION REPORT EA 250.0000 250.00 0.000 0.00 02 CONSTRUCTION SITE MANAGEMENT LS 3,000.0000 3,000.00 1.000 3,000.00 03 PREPARE WATER POLLUTION CONTROL LS 500.0000 500.00 1.000 500.00 PROGRAM 04 STREET SWEEPING LS 2,500.0000 2,500.00 1.000 2,500.00 05 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 500.0000 500.00 1.000 500.00 06 CONSTRUCTION AREA SIGNS LS 6,000.0000 6,000.00 1.000 6,000.00 07 TRAFFIC CONTROL SYSTEM LS 99,500.0000 99,500.00 1.000 99,500.00 08 PORTABLE CHANGEABLE MESSAGE SIGN EA 1,200.0000 2,400.00 2.000 2,400.00 09 REMOVE METAL BEAM GUARD RAILING LF 9.0000 37,530.00 4,080.000 36,720.00 10 REMOVE PAINTED TRAFFIC STRIPE LF 0.2000 50,200.00 250,770.000 50,154.00 11 REMOVE PAVEMENT MARKING SQFT 7.0000 1,190.00 168.000 1,176.00 12 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 3.0000 1,560.00 520.000 1,560.00 13 REMOVE ROADSIDE SIGN EA 50.0000 150.00 3.000 150.00 14 RESET ROADSIDE SIGN EA 300.0000 600.00 2.000 600.00 15 CLEARING AND GRUBBING LS 1,000.0000 1,000.00 1.000 1,000.00 16 LEAD COMPLIANCE PLAN LS 2,500.0000 2,500.00 1.000 2,500.00 17 PRUNE EXISTING PLANTS LS 3,500.0000 3,500.00 1.000 3,500.00 18 CENTERLINE RUMBLE STRIP STA 28.0000 23,520.00 839.500 23,506.00 (AC, GROUND-IN INDENTATIONS) 19 24" CAST-IN-DRILLED-HOLE CONCRETE PILING LF 300.0000 16,500.00 55.000 16,500.00 20 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 10.0000 310.00 31.000 310.00 (0.063"-UNFRAMED) 21 ROADSIDE SIGN - ONE POST EA 330.0000 2,310.00 7.000 2,310.00 22 MILEPOST MARKER EA 60.0000 600.00 10.000 600.00 PROGRAM CAS145 PAGE 2 DATE 06/28/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-298504 TIME 12:59 PM ESTIMATE NO. 05 BID OPENING 06/17/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/21/11 R.E. NAME: GARY LEVINE DATE OF THIS ESTIMATE 06/28/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 GUARD RAILING DELINEATOR EA 20.0000 1,820.00 101.000 2,020.00 24 METAL BEAM GUARD RAILING LF 25.0000 94,500.00 3,810.000 95,250.00 25 METAL BEAM GUARD RAILING (STEEL POST) LF 32.0000 2,016.00 63.000 2,016.00 26 TERMINAL SYSTEM (TYPE X-TENSION) EA 4,500.0000 36,000.00 8.000 36,000.00 27 4" THERMOPLASTIC TRAFFIC STRIPE LF 1.3000 416.00 318.000 413.40 28 8" THERMOPLASTIC TRAFFIC STRIPE LF 3.5000 185.50 53.000 185.50 29 THERMOPLASTIC PAVEMENT MARKING SQFT 3.0000 510.00 168.000 504.00 30 PAINT TRAFFIC STRIPE (2-COAT) LF 0.1200 21,240.00 176,490.000 21,178.80 31 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.0000 21,030.00 7,001.000 21,003.00 32 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,000.0000 1,000.00 1.000 1,000.00 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 3 DATE 06/28/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-298504 TIME 12:59 PM ESTIMATE NO. 05 BID OPENING 06/17/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/21/11 R.E. NAME: GARY LEVINE DATE OF THIS ESTIMATE 06/28/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 0.00 434,556.70 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 17,915.41 SUBTOTAL AMOUNT EARNED 0.00 452,472.11 ORIGINAL CONTRACT AMOUNT 434,837.50 TOTAL WORK COMPLETED 0.00 452,472.11 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 8,000.00 0.00 TOTAL 8,000.00 452,472.11 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/03/10 45 01/10/11 01/10/11 03/21/11 45 19 0 0 100% 100% GARY LEVINE RESIDENT ENGINEER PROGRAM CAS145 DATE 06/28/11