PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/22/12 EST. NO.01 TIME 03:35 PM R.E. NAME: AKHONDZADEH, RAHIM 11-298704 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/22/12 EST. NO.01 TIME 03:35 PM R.E. NAME: AKHONDZADEH, RAHIM 11-298704 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 03/22/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-298704 TIME 03:35 PM ESTIMATE NO. 01 BID OPENING 10/20/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/12 R.E. NAME: AKHONDZADEH, RAHIM DATE OF THIS ESTIMATE 03/22/12 LOCATION PROGRESS ESTIMATE 11-SD-79-45.6/52.8 ----------------- HAZARD CONSTRUCTION IN SAN DIEGO COUNTY ABOUT 10MILES 6465 MARINDUSTRY PLACE NORTH OF WARNER SPRINGS FROM 0.2 SAN DIEGO CA 92191 MILE SOUTH OF CHIHUAHUA VALLEY ROAD TO 0.2 MILE SOUTH OF RIVERSIDE COUNTY LINE FED. AID NO. OTS- ( ) WIDENING AND RUMBLE STRIPS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 001 TEMPORARY FENCE (TYPE ESA) LF 2.7000 28,620.00 0.000 0.00 002 CONSTRUCTION SITE MANAGEMENT LS 5,600.0000 5,600.00 0.233 1,304.80 0.233 1,304.80 003 PREPARE WATER POLLUTION CONTROL LS 790.0000 790.00 0.750 592.50 0.750 592.50 PROGRAM 004 TEMPORARY FIBER ROLL LF 2.4000 1,944.00 0.000 0.00 005 TEMPORARY COVER SQYD 12.0000 1,440.00 0.000 0.00 006 STREET SWEEPING LS 10,000.0000 10,000.00 0.000 0.00 007 CONSTRUCTION AREA SIGNS LS 2,300.0000 2,300.00 0.493 1,133.90 0.493 1,133.90 008 TRAFFIC CONTROL SYSTEM LS 103,000.0000 103,000.00 0.233 23,999.00 0.233 23,999.00 009 PORTABLE CHANGEABLE MESSAGE SIGN EA 1,900.0000 3,800.00 0.233 442.70 0.233 442.70 010 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 0.5000 35,700.00 0.000 0.00 STRIPE (HAZARDOUS WASTE) 011 REMOVE PAINTED TRAFFIC STRIPE LF 0.4000 30,360.00 0.000 0.00 012 REMOVE PAVEMENT MARKER EA 0.6000 1,830.00 0.000 0.00 013 REMOVE ROADSIDE SIGN EA 120.0000 120.00 0.000 0.00 014 CLEARING AND GRUBBING LS 3,000.0000 3,000.00 0.000 0.00 015 ROADWAY EXCAVATION CY 45.0000 9,450.00 0.000 0.00 016 LEAD COMPLIANCE PLAN LS 880.0000 880.00 0.075 66.00 0.075 66.00 017 PRUNE EXISTING PLANTS LS 26,000.0000 26,000.00 1.000 26,000.00 1.000 26,000.00 018 FIBER ROLLS LF 2.5000 2,050.00 0.000 0.00 019 EROSION CONTROL (POLYMER STABILIZED SQFT 0.2000 1,540.00 0.000 0.00 FIBER MATRIX) (SQFT) 020 CLASS 2 AGGREGATE BASE CY 63.0000 8,820.00 0.000 0.00 021 HOT MIX ASPHALT (TYPE A) TON 179.0000 26,850.00 0.000 0.00 022 RUMBLE STRIP (CENTERLINE) LNMI 3,700.0000 29,600.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 03/22/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-298704 TIME 03:35 PM ESTIMATE NO. 01 BID OPENING 10/20/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/12 R.E. NAME: AKHONDZADEH, RAHIM DATE OF THIS ESTIMATE 03/22/12 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 023 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 21.0000 3,780.00 0.000 0.00 024 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 25.0000 1,250.00 0.000 0.00 (0.063"-UNFRAMED) 025 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 27.0000 432.00 0.000 0.00 (0.080"-UNFRAMED) 026 ROADSIDE SIGN - ONE POST EA 460.0000 1,380.00 0.000 0.00 027 DELINEATOR (CLASS 1) EA 58.0000 13,340.00 0.000 0.00 028 OBJECT MARKER EA 84.0000 588.00 0.000 0.00 029 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 35,300.00 0.000 0.00 030 RAISED PROFILED THERMOPLASTIC TRAFFIC LF 1.5000 113,400.00 0.000 0.00 STRIPE 031 THERMOPLASTIC PAVEMENT MARKING SQFT 3.3000 198.00 0.000 0.00 032 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 2,220.00 0.000 0.00 (BROKEN 36-12) 033 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.0000 12,200.00 0.000 0.00 034 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 200.0000 200.00 0.000 0.00 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 3 DATE 03/22/12 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-298704 TIME 03:35 PM ESTIMATE NO. 01 BID OPENING 10/20/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/12 R.E. NAME: AKHONDZADEH, RAHIM DATE OF THIS ESTIMATE 03/22/12 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 53,538.90 53,538.90 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 53,538.90 53,538.90 ORIGINAL CONTRACT AMOUNT 517,982.00 TOTAL WORK COMPLETED 53,538.90 53,538.90 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 53,538.90 53,538.90 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 02/03/12 30 03/07/12 03/07/12 04/19/12 7 14 0 0 11% 23% PROGRESS IS SATISFACTORY AKHONDZADEH, RAHIM RESIDENT ENGINEER PROGRAM CAS145 DATE 03/22/12