PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/18/19 EST. NO. 024 TIME 01:09 PM R.E. NAME: CORBIT, JARED 11-2E1504 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0099 503.90 E.W. @ F.A.(+) 092319 N 0156.0 011 0001-1 364,292.69 A.C. @ L.S.(-) 021919 N 1 0 DAO CORRECTING ENTRY 0002-1 11,750.49 031919 N 2 0 DAO CORRECTING ENTRY 0003-1 -368,157.61 A.C. @ L.S.(+) 041819 N 3 0 DAO CORRECTING ENTRY 0004-1 14,192.14 A.C. @ L.S.(-) 052019 N 4 0 DAO CORRECTING ENTRY 0005-1 -947.65 A.C. @ L.S.(+) 061319 N 11 0 DAO CORRECTING ENTRY 0006-1 1,762.54 A.C. @ L.S.(-) 071719 N 6 0 DAO CORRECTING ENTRY 0008-1 -30,894.74 A.C. @ L.S.(+) 081919 N 8 0 DAO CORRECTING ENTRY 0011 25,102.93 101719 N 11A 0 018 0009 -35,035.00 A.C. @ U.P.(-) 101719 N 9 0 -17,430.31 TOTAL THIS ESTIMATE 1,071,758.11 TOTAL PREVIOUS ESTIMATE 1,054,327.80 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/18/19 EST. NO. 024 TIME 01:09 PM R.E. NAME: CORBIT, JARED 11-2E1504 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION DEL JUN 18 CPR -3,000.00 009 DEL JUL 18 CPR -1,000.00 010 PRTL JUN 18 DEL 2,000.00 010 RECD JUL 18 DEL 1,000.00 011 RECD JUN 18 DEL 1,000.00 011 DEL MAR 19 CPR -1,000.00 018 RECD MAR 19 DEL 1,000.00 019 DEL JUN 18 CPR -3,000.00 021 DEL JUL 19 CPR -1,000.00 022 PRTL JUN 19 DEL 2,000.00 023 RECD JUL 19 DEL 1,000.00 023 0.00 -1,000.00 TOTAL DEDUCTIONS 0.00 -1,000.00 PROGRAM CAS145 PAGE 1 DATE 10/18/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2E1504 TIME 01:09 PM ESTIMATE NO. 024 BID OPENING 11/21/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/19 R.E. NAME: CORBIT, JARED DATE OF THIS ESTIMATE 10/18/19 LOCATION PROGRESS ESTIMATE 11-SD-5-38.1/39.3 ----------------- FLATIRON-SKANSKA-STACEY AND WETLAND CONSTRUCTION NEAR STATE WITBECK A JOINT VENTURE HIGHWAY IN SAN DIEGO COUNTY IN 16470 W BERNADO DR., STE 120 SOLANA BEACH AND ENCINITAS AT SAN DIEGO, CA 92127 VARIOUS LOCATIONS FED. AID NO. N O N E RETORE THE SAN ELIJO LAGOON, ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 50,000.0000 50,000.00 0.750 37,500 002 BONDS AND INSURANCE LS 3,756,825.0000 3,756,825.00 1.000 3,756,825 003 TIME-RELATED OVERHEAD (WDAY) WDAY 20,000.0000 16,200,000.00 19.000 380,000.00 479.000 9,580,000 004 DEVELOP WATER SUPPLY LS 83,650.0000 83,650.00 0.030 2,509.50 0.734 61,399 005 CONSTRUCTION AREA SIGNS LS 11,200.0000 11,200.00 0.000 0 006 TRAFFIC CONTROL SYSTEM LS 347,000.0000 347,000.00 0.030 10,410.00 0.735 255,045 007 JOB SITE MANAGEMENT LS 2,200,000.0000 2,200,000.00 0.030 66,000.00 0.734 1,614,800 008 PREPARE STORM WATER POLLUTION PREVENTION LS 12,000.0000 12,000.00 0.011 132.00 0.793 9,516 PLAN 009 RAIN EVENT ACTION PLAN EA 500.0000 30,000.00 21.000 10,500 010 STORM WATER SAMPLING AND ANALYSIS DAY EA 1,000.0000 120,000.00 10.000 10,000 011 STORM WATER ANNUAL REPORT EA 1,200.0000 4,800.00 2.000 2,400 012 TEMPORARY HYDRAULIC MULCH SQYD 2.0000 35,000.00 0.000 0 013 TEMPORARY CHECK DAM LF 12.0000 6,000.00 0.000 0 014 TEMPORARY DRAINAGE INLET PROTECTION EA 800.0000 6,400.00 8.000 6,400 (F) 015 TEMPORARY FIBER ROLL LF 9.0000 99,000.00 0.000 0 016 TEMPORARY SILT FENCE LF 20.0000 700,000.00 80.000 1,600.00 1,020.000 20,400 017 TEMPORARY CONSTRUCTION ENTRANCE EA 14,000.0000 84,000.00 6.000 84,000 (F) 018 STREET SWEEPING LS 440,000.0000 440,000.00 0.030 13,200.00 0.734 322,960 019 TEMPORARY CONCRETE WASHOUT LS 5,000.0000 5,000.00 0.052 260.00 0.520 2,600 (F) 020 TEMPORARY HIGH-VISIBILITY FENCE LF 10.0000 880,000.00 88,000.000 880,000 (F) 021 CLEARING AND GRUBBING (ACRE) ACRE 38,500.0000 4,466,000.00 116.000 4,466,000 (F) 022 STRUCTURE EXCAVATION (BRIDGE) CY 426.0000 5,964.00 14.000 5,964 (F) PROGRAM CAS145 PAGE 2 DATE 10/18/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2E1504 TIME 01:09 PM ESTIMATE NO. 024 BID OPENING 11/21/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/19 R.E. NAME: CORBIT, JARED DATE OF THIS ESTIMATE 10/18/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 STRUCTURE EXCAVATION (TYPE A) CY 1,315.0000 228,810.00 174.000 228,810 (F) 024 STRUCTURE BACKFILL (BRIDGE) CY 112.0000 13,440.00 120.000 13,440 (F) 025 ORGANIC HUMIC COMPOST CY 360.0000 750,960.00 0.000 0 026 AGRICULTURAL GYPSUM CY 360.0000 267,840.00 0.000 0 027 NATIVE PLANT MULCH LS 1,925,000.0000 1,925,000.00 0.052 100,100.00 0.520 1,001,000 028 PLANT LOW MARSH EA 29.0000 1,340,380.00 0.000 0 029 CORDGRASS NURSERY LS 1,799,700.0000 1,799,700.00 0.030 53,991.00 0.734 1,320,979 030 PLANT MID MARSH EA 10.0000 66,630.00 0.000 0 031 PLANT HIGH MARSH EA 9.0000 119,934.00 0.000 0 032 PLANT UPLAND TRANSITIONAL EA 13.0000 174,161.00 0.000 0 033 PLANT ESTABLISHMENT WORK LS 1,038,000.0000 1,038,000.00 0.000 0 034 DECOMPOSED GRANITE SQFT 21.0000 155,400.00 0.000 0 035 1" REMOTE CONTROL VALVE EA 625.0000 2,500.00 0.000 0 036 1 1/2" REMOTE CONTROL VALVE EA 750.0000 15,750.00 0.000 0 037 2" REMOTE CONTROL VALVE EA 785.0000 23,550.00 0.000 0 038 2" MASTER CONTROL VALVE BRASS ASSEMBLY EA 820.0000 2,460.00 0.000 0 039 2" WYE STRAINER ASSEMBLY EA 565.0000 3,390.00 0.000 0 040 BATTERY POWERED IRRIGATION CONTROLLER EA 1,875.0000 82,500.00 0.000 0 041 2 1/2" COPPER PIPE (SUPPLY LINE) LF 75.0000 3,750.00 0.000 0 042 2 1/2" GALVANIZED STEEL PIPE LF 75.0000 11,625.00 0.000 0 (SUPPLY LINE) 043 2" BACKFLOW PREVENTER ASSEMBLY EA 6,250.0000 18,750.00 0.000 0 044 BACKFLOW PREVENTER ENCLOSURE EA 3,750.0000 11,250.00 0.000 0 045 GARDEN VALVE ASSEMBLY EA 625.0000 1,875.00 0.000 0 046 POP-UP SPRINKLER ASSEMBLY (GEAR DRIVEN) EA 125.0000 44,875.00 0.000 0 047 POP-UP SPRINKLER ASSEMBLY EA 75.0000 111,525.00 0.000 0 048 VALVE BOX PLASTIC SQUARE 12"X17" EA 200.0000 24,800.00 0.000 0 049 VALVE BOX PLASTIC ROUND 10" EA 200.0000 7,400.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 10/18/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2E1504 TIME 01:09 PM ESTIMATE NO. 024 BID OPENING 11/21/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/19 R.E. NAME: CORBIT, JARED DATE OF THIS ESTIMATE 10/18/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LF 5.0000 74,715.00 0.000 0 (F) LINE) 051 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LF 6.5000 54,294.50 0.000 0 (F) LINE) 052 1 1/4" PLASTIC PIPE (SCHEDULE 40) LF 7.5000 22,695.00 0.000 0 (F) (SUPPLY LINE) 053 1 1/2" PLASTIC PIPE (SCHEDULE 40) LF 9.0000 75,042.00 0.000 0 (F) (SUPPLY LINE) 054 2" PLASTIC PIPE (SCHEDULE 40) LF 10.0000 60,810.00 0.000 0 (F) (SUPPLY LINE) 055 2" PLASTIC PIPE (CLASS 315) LF 12.5000 44,837.50 0.000 0 (F) (SUPPLY LINE) 056 2 1/2" PLASTIC PIPE (CLASS 315) LF 15.0000 112,200.00 0.000 0 (F) (SUPPLY LINE) 057 PRESSURE REGULATING VALVE EA 1,250.0000 3,750.00 0.000 0 058 QUICK COUPLING VALVE EA 440.0000 16,280.00 0.000 0 059 BALL VALVE EA 565.0000 28,815.00 0.000 0 060 PVC PIPE CONDUIT (SLEEVE) LF 62.0000 9,300.00 0.000 0 (F) 061 42" CAST-IN-DRILLED-HOLE CONCRETE PILING LF 1,144.0000 215,072.00 188.000 215,072 062 PRESTRESSING CAST-IN-PLACE CONCRETE LS 36,800.0000 36,800.00 1.000 36,800 063 SEAL COURSE CONCRETE CY 3,000.0000 66,000.00 22.000 66,000 064 STRUCTURAL CONCRETE, BRIDGE FOOTING CY 3,200.0000 22,400.00 7.000 22,400 (F) 065 STRUCTURAL CONCRETE, BRIDGE CY 3,375.0000 607,500.00 164.000 553,500 (F) 066 STRUCTURAL CONCRETE, APPROACH SLAB CY 3,200.0000 35,200.00 9.000 28,800.00 9.000 28,800 (F) 067 STRUCTURAL CONCRETE, HEADWALL CY 25,000.0000 50,000.00 0.000 0 (F) 068 JOINT SEAL (MR 1") LF 60.0000 2,820.00 0.000 0 069 BAR REINFORCING STEEL (BRIDGE) LB 1.0000 25,000.00 25,000.000 25,000 (F) 070 BAR REINFORCING STEEL (EPOXY COATED) LB 2.0000 50,000.00 4,524.000 9,048.00 25,000.000 50,000 (F) (BRIDGE) 071 48" PLASTIC PIPE LF 1,240.0000 124,000.00 0.000 0 (F) 072 ROCK SLOPE PROTECTION CY 150.0000 1,200,000.00 7,987.000 1,198,050 (F) (1/4 T, CLASS V, METHOD B) (CY) 073 ROCK SLOPE PROTECTION CY 256.0000 2,048,000.00 8,075.000 2,067,200 (F) (20 LB, CLASS I, METHOD B) (CY) 074 CONSTRUCTION SURVEYING AND FIELD LS 2,230,000.0000 2,230,000.00 0.030 66,900.00 0.734 1,636,820 ENGINEERING 075 NOISE ABATEMENT FENCE LF 677.0000 67,700.00 20.000 13,540 076 TURBIDITY CURTAIN LF 195.0000 585,000.00 2,450.000 477,750 PROGRAM CAS145 PAGE 4 DATE 10/18/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2E1504 TIME 01:09 PM ESTIMATE NO. 024 BID OPENING 11/21/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/19 R.E. NAME: CORBIT, JARED DATE OF THIS ESTIMATE 10/18/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 DEMOLITION LS 500,000.0000 500,000.00 0.030 15,000.00 0.734 367,000 078 DREDGE PIT AND PLACE ON SOLANA BEACH CY 13.0000 1,898,000.00 156,000.000 2,028,000 079 DREDGE PIT AND PLACE ON CARDIFF STATE CY 11.0000 3,300,000.00 318,000.000 3,498,000 BEACH 080 EXCAVATE CHANNEL & REMOVE TIMBER PILE EA 2,200.0000 349,800.00 184.000 404,800 AT OLD TRESTLE LOCATION 081 DREDGE AND PLACE AT SO-6 (RBSPII) CY 14.0000 3,920,000.00 0.000 0 082 DREDGE CENTRAL BASIN AND PLACE IN PIT CY 33.0000 10,329,000.00 278,653.000 9,195,549 AND FILL AREAS 083 DREDGE WEST BASIN AND PLACE IN PIT AND CY 55.0000 3,630,000.00 3,000.000 165,000.00 37,594.000 2,067,670 FILL AREAS 084 DREDGE EAST BASIN AND PLACE IN PIT AND CY 39.0000 14,703,000.00 1,000.000 39,000.00 323,700.000 12,624,300 FILL AREAS 085 METAL RAILING LF 350.0000 196,000.00 0.000 0 (F) 086 WATER METER CHARGES LS 100,000.0000 100,000.00 0.030 3,000.00 0.734 73,400 087 IRRIGATION WATER SERVICE CHARGES LS 37,500.0000 37,500.00 0.052 1,950.00 0.520 19,500 PROGRAM CAS145 PAGE 5 DATE 10/18/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2E1504 TIME 01:09 PM ESTIMATE NO. 024 BID OPENING 11/21/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/19 R.E. NAME: CORBIT, JARED DATE OF THIS ESTIMATE 10/18/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 956,900.50 60,359,689.90 ADJUSTMENT OF COMPENSATION -17,934.21 -2,014,818.04 EXTRA WORK 503.90 3,069,145.84 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 939,470.19 61,414,017.70 088 MOBILIZATION LS 9,300,000.0000 9,300,000.00 1.000 9,300,000 ORIGINAL CONTRACT AMOUNT 93,920,625.00 TOTAL WORK COMPLETED 939,470.19 70,714,017.70 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 -1,000.00 TOTAL 939,470.19 70,713,017.70 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 11/21/17 810 11/06/17 11/06/17 07/02/20 479 6 157 0 80% 50% PROGRESS IS SATISFACTORY CORBIT, JARED RESIDENT ENGINEER PROGRAM CAS145 DATE 10/18/19