PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/21/16 EST. NO. 004 TIME 04:43 PM R.E. NAME: RIZZUTTO, SHAWN 11-2M6504 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 655.24 E.W. @ F.A.(+) 060616 N 1 0 0002 655.24 060716 N 2 0 0003 655.24 060816 N 3 0 0004 655.24 060916 N 4 0 0005 655.24 061016 N 5 0 0007 655.24 061316 N 7 0 0008 655.24 061416 N 8 0 0009 873.65 061516 N 9 0 0010 536.61 061116 N 10 0 002 0001 47,496.24 A.C. @ U.P.(+) 072016 N 1 0 53,493.18 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 53,493.18 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/21/16 EST. NO. 004 TIME 04:43 PM R.E. NAME: RIZZUTTO, SHAWN 11-2M6504 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE FAILED SCREENING GRD -1,617.87 002 FAILED TEST NO 1 -1,029.23 002 0.00 -2,647.10 LABOR COMPLIANCE VIOLATION DEL MAY 16 CPR -10,000.00 003 RECD MAY 16 DEL 10,000.00 004 10,000.00 0.00 TOTAL DEDUCTIONS 10,000.00 -2,647.10 PROGRAM CAS145 PAGE 1 DATE 07/21/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2M6504 TIME 04:43 PM ESTIMATE NO. 004 BID OPENING 01/07/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/16 R.E. NAME: RIZZUTTO, SHAWN DATE OF THIS ESTIMATE 07/21/16 LOCATION PROGRESS ESTIMATE 11-IMP-86-43.1/67.8 ----------------- AMERICAN PAVEMENT SYSTEMS, IN IMPERIAL COUNTY NEAR SALTON CITY INC. FROM 0.5 MILE SOUTH OF NORTH JUNCTI 1012 11TH STREET STE 1000 ON ROUTE 78 TO RIVERSIDE COUNTY MODESTO CA 95354 LINE FED. AID NO. STP-P086(74)E APPLY ASPHALT RUBBER CHIP SEAL ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 4,000.0000 4,000.00 1.000 4,000 002 CONSTRUCTION AREA SIGNS LS 125,000.0000 125,000.00 0.168 21,000.00 0.750 93,750 003 TRAFFIC CONTROL SYSTEM LS 393,000.0000 393,000.00 0.238 93,534.00 0.689 270,777 004 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 10,000.0000 20,000.00 0.467 4,670.00 1.378 13,780 005 JOB SITE MANAGEMENT LS 10,000.0000 10,000.00 0.238 2,380.00 0.689 6,890 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 5,000.0000 5,000.00 0.750 3,750 007 TEMPORARY CONCRETE WASHOUT LS 15,000.0000 15,000.00 1.000 15,000.00 1.000 15,000 008 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.2100 14,406.00 56,899.000 11,948 009 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 1.0500 18,270.00 18,354.000 19,271 010 LEAN CONCRETE BASE RAPID SETTING CY 1,113.0000 244,860.00 223.070 248,276.91 223.070 248,276 011 SAND COVER (SEAL) TON 125.0000 251,250.00 73.490 9,186.25 1,764.030 220,503 012 ASPHALT-RUBBER BINDER TON 750.0000 1,665,000.00 25.090 18,817.50 2,120.000 1,590,000 013 ASPHALTIC EMULSION (FOG SEAL COAT) TON 950.0000 209,000.00 18.040 17,138.00 249.960 237,462 014 PRECOATED SCREENINGS TON 65.0000 1,306,500.00 225.030 14,626.95 18,140.790 1,179,151 015 PREPAVING INERTIAL PROFILER LS 20,000.0000 20,000.00 1.000 20,000 016 PREPAVING GRINDING DAY EA 14,000.0000 112,000.00 8.955 125,370 017 SHOULDER RUMBLE STRIP STA 25.0000 113,000.00 422.400 10,560.00 422.400 10,560 (HMA,GROUND-IN INDENTATIONS) 018 DRILL AND BOND (DOWEL BAR) EA 25.0000 21,250.00 456.000 11,400.00 456.000 11,400 019 INDIVIDUAL SLAB REPLACEMENT (RSC) CY 1,323.0000 423,360.00 322.920 427,223.16 322.920 427,223 020 JOINT SEAL (SILICONE) LF 6.1500 14,760.00 0.000 0 021 THERMOPLASTIC PAVEMENT MARKING SQFT 3.1500 61,740.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 022 PAINT TRAFFIC STRIPE (1-COAT) LF 0.0800 1,440.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 07/21/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2M6504 TIME 04:43 PM ESTIMATE NO. 004 BID OPENING 01/07/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/16 R.E. NAME: RIZZUTTO, SHAWN DATE OF THIS ESTIMATE 07/21/16 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 PAINT TRAFFIC STRIPE (2-COAT) LF 0.1100 90,245.10 0.000 0 024 PAVEMENT MARKER (NON-REFLECTIVE) EA 1.0500 22,890.00 0.000 0 025 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.1000 27,720.00 0.000 0 026 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 2,000.0000 2,000.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 3 DATE 07/21/16 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2M6504 TIME 04:43 PM ESTIMATE NO. 004 BID OPENING 01/07/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/16 R.E. NAME: RIZZUTTO, SHAWN DATE OF THIS ESTIMATE 07/21/16 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 893,812.77 4,509,114.66 ADJUSTMENT OF COMPENSATION 47,496.24 47,496.24 EXTRA WORK 5,996.94 5,996.94 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 947,305.95 4,562,607.84 027 MOBILIZATION LS 278,500.0000 278,500.00 1.000 278,500 ORIGINAL CONTRACT AMOUNT 5,470,191.10 TOTAL WORK COMPLETED 947,305.95 4,841,107.84 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 10,000.00 -2,647.10 TOTAL 957,305.95 4,838,460.74 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 03/03/16 90 04/18/16 04/18/16 08/29/16 62 4 0 0 90% 69% PROGRESS IS SATISFACTORY RIZZUTTO, SHAWN RESIDENT ENGINEER PROGRAM CAS145 DATE 07/21/16