PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 11/23/22 EST. NO. 015 TIME 07:22 PM R.E. NAME: DAVID TOCI 11-2N0084 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0011 2,306.43 E.W. @ F.A.(+) 082222 N 932305 0012 2,306.43 082222 N 939267 4,612.86 TOTAL THIS ESTIMATE 1,521,868.78 TOTAL PREVIOUS ESTIMATE 1,526,481.64 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 11/23/22 EST. NO. 015 TIME 07:22 PM R.E. NAME: DAVID TOCI 11-2N0084 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE PST BID ITEM 20 -2,500.00 011 0.00 -2,500.00 LABOR COMPLIANCE VIOLATION INQ/OTH JUL 2022 CPR -5,000.00 012 0.00 -5,000.00 TOTAL DEDUCTIONS 0.00 -7,500.00 PROGRAM CAS145 PAGE 1 DATE 11/23/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2N0084 TIME 07:22 PM ESTIMATE NO. 015 BID OPENING 04/22/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/22 R.E. NAME: DAVID TOCI DATE OF THIS ESTIMATE 11/23/22 LOCATION PROGRESS ESTIMATE 11-IMP-7-0.4/6.3 ----------------- FEC FUTURE CONTRACTORS AND IN IMPERIAL COUNTY AT VARIOUS ENGINEERS, INC. LOCATIONS. 184 TECHNOLOGY DRIVE, SUITE 2 IRVINE CA 92618 FED. AID NO. N O N E REHABILITATE BRIDGE DECK ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,224.0000 1,224.00 1.000 1,224 002 TIME-RELATED OVERHEAD (WDAY) WDAY 510.0000 102,000.00 200.000 102,000 003 DISPUTE RESOLUTION ADVISOR ON-SITE EA 2,000.0000 12,000.00 1.000 2,000 MEETING 004 HOURLY OFF-SITE HR 200.0000 2,000.00 17.000 3,400 DISPUTE-RESOLUTION-ADVISOR-RELATED TASKS 005 CONSTRUCTION AREA SIGNS LS 9,996.0000 9,996.00 0.800 7,996 006 TRAFFIC CONTROL SYSTEM LS 157,080.0000 157,080.00 1.000 157,080 007 TEMPORARY TRAFFIC STRIPE (PAINT) LF 0.7700 30,646.00 0.000 0 008 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 2,346.0000 14,076.00 6.000 14,076 009 TEMPORARY RAILING (TYPE K) LF 25.5000 36,720.00 1,440.000 36,720 010 ALTERNATIVE TEMPORARY CRASH CUSHION EA 2,040.0000 16,320.00 8.000 16,320 011 AUTOMATED FLAGGER ASSISTANCE DEVICE EA 147.9000 26,326.20 178.000 26,326 DAY 012 JOB SITE MANAGEMENT LS 10,200.0000 10,200.00 1.000 10,200 013 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,020.0000 1,020.00 0.750 765 014 TEMPORARY CONCRETE WASHOUT LS 2,040.0000 2,040.00 1.000 2,040 015 MANAGE SOLID WASTE GENERATED HR 204.0000 16,320.00 74.500 15,198 BY THE PUBLIC 016 REMOVE YELLOW PAINTED TRAFFIC STRIPE LF 2.5500 44,880.00 6,728.000 17,156 (HAZARDOUS WASTE) 017 TREATED WOOD WASTE LB 0.5700 24,111.00 42,290.700 24,105 018 REMOVE CONCRETE (STRUCTURE) CY 1,530.0000 3,672.00 3.600 5,508 019 SHOULDER BACKING TON 510.0000 4,080.00 7.840 3,998 020 HOT MIX ASPHALT (TYPE A) TON 306.0000 33,660.00 104.000 31,824 021 TACK COAT TON 5,100.0000 1,020.00 0.820 4,182 022 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 30.6000 23,868.00 780.000 23,868 PROGRAM CAS145 PAGE 2 DATE 11/23/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2N0084 TIME 07:22 PM ESTIMATE NO. 015 BID OPENING 04/22/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/22 R.E. NAME: DAVID TOCI DATE OF THIS ESTIMATE 11/23/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 GRIND EXISTING BRIDGE DECK SQYD 15.3000 10,189.80 666.000 10,189 024 STRUCTURAL CONCRETE, BRIDGE (RSC) CY 2,040.0000 8,160.00 4.000 8,160 025 STRUCTURAL CONCRETE, APPROACH SLAB CY 1,326.0000 172,380.00 130.000 172,380 (F) (TYPE R) 026 MINOR CONCRETE (MINOR STRUCTURE) CY 2,040.0000 16,320.00 9.400 19,176 (F) 027 DRILL AND BOND DOWEL LF 25.5000 11,092.50 481.000 12,265 028 CLEAN EXPANSION JOINT LF 20.4000 51,122.40 2,365.000 48,246 029 JOINT SEAL (MR 1/2") LF 30.6000 2,264.40 74.000 2,264 030 JOINT SEAL (MR 1") LF 37.7400 26,946.36 714.000 26,946 031 JOINT SEAL (MR 1 1/2") LF 56.1000 49,816.80 863.000 48,414 032 JOINT SEAL (TYPE AL) LF 35.7000 6,426.00 180.000 6,426 033 BONDED JOINT SEAL (MR 1") LF 45.9000 8,996.40 196.000 8,996 034 BONDED JOINT SEAL (MR 1 1/2") LF 51.0000 23,154.00 454.000 23,154 035 BAR REINFORCING STEEL (BRIDGE) LB 6.1200 1,634.04 267.000 1,634 (F) 036 PUBLIC SAFETY PLAN LS 10,200.0000 10,200.00 1.000 10,200 037 RAPID SETTING CONCRETE (PATCH) CF 34.6800 16,022.16 106.970 3,709 038 REMOVE ASPHALT CONCRETE SURFACING SQFT 6.1200 72,705.60 11,880.000 72,705 039 REMOVE UNSOUND CONCRETE CF 41.8200 19,320.84 106.970 4,473 040 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.1900 88,519.10 465,890.000 88,519 041 FURNISH POLYESTER CONCRETE OVERLAY CF 69.0100 688,443.76 0.000 0 042 PLACE POLYESTER CONCRETE OVERLAY SQFT 3.3000 288,783.00 0.000 0 (F) 043 TREAT BRIDGE DECK SQFT 0.2300 87,027.40 378,380.000 87,027 (F) 044 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 48.5700 230,464.65 3,886.000 188,743 045 BRIDGE REMOVAL (PORTION) LS 10,200.0000 10,200.00 1.000 10,200 046 GUARD RAILING DELINEATOR EA 25.5000 4,335.00 175.000 4,462 047 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.0600 2,845.80 934.000 2,858 048 MIDWEST GUARDRAIL SYSTEM (WOOD POST) LF 36.7200 26,438.40 775.500 28,476 049 MIDWEST GUARDRAIL SYSTEM (7' WOOD POST) LF 36.2100 99,215.40 2,737.500 99,124 PROGRAM CAS145 PAGE 3 DATE 11/23/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2N0084 TIME 07:22 PM ESTIMATE NO. 015 BID OPENING 04/22/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/22 R.E. NAME: DAVID TOCI DATE OF THIS ESTIMATE 11/23/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 DOUBLE MIDWEST GUARDRAIL SYSTEM LF 54.0600 43,248.00 800.000 43,248 (WOOD POST) 051 TRANSITION RAILING (TYPE WB-31) EA 4,488.0000 53,856.00 12.000 53,856 052 END ANCHOR ASSEMBLY (TYPE SFT) EA 1,020.0000 1,020.00 1.000 1,020 053 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 4,335.0000 17,340.00 4.000 17,340 054 MAX TENSION MEDIAN TERMINAL EA 10,965.0000 54,825.00 5.000 54,825 SYSTEM 055 REMOVE GUARDRAIL LF 8.6700 33,639.60 3,879.000 33,630 056 THERMOPLASTIC PAVEMENT MARKING SQFT 6.1200 1,468.80 405.000 2,478 (ENHANCED WET NIGHT VISIBILITY) 057 6" THERMOPLASTIC TRAFFIC STRIPE LF 4.0800 775.20 197.000 803 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7) 058 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.2800 10,137.60 7,222.000 9,244 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 059 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.4300 44,759.00 29,980.000 42,871 (ENHANCED WET NIGHT VISIBILITY) 060 8" THERMOPLASTIC TRAFFIC STRIPE LF 4.0800 1,509.60 773.000 3,153 (ENHANCED WET NIGHT VISIBILITY) 061 REMOVE PAINTED TRAFFIC STRIPE LF 0.6800 25,500.00 28,565.000 19,424 062 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 4.0800 2,040.00 19,746.000 80,563 063 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 4.0800 979.20 170.000 693 064 CONTRAST STRIPE PAINT (1-COAT) LF 0.1300 4,381.00 32,643.000 4,243 PROGRAM CAS145 PAGE 4 DATE 11/23/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2N0084 TIME 07:22 PM ESTIMATE NO. 015 BID OPENING 04/22/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/22 R.E. NAME: DAVID TOCI DATE OF THIS ESTIMATE 11/23/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 0.00 1,862,138.17 ADJUSTMENT OF COMPENSATION 0.00 19,623.62 EXTRA WORK 4,612.86 1,506,858.02 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 4,612.86 3,388,619.81 065 MOBILIZATION LS 318,000.0000 318,000.00 1.000 318,000 ORIGINAL CONTRACT AMOUNT 3,219,762.01 TOTAL WORK COMPLETED 4,612.86 3,706,619.81 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 -7,500.00 TOTAL 4,612.86 3,699,119.81 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/15/21 200 09/09/21 09/09/21 11/29/22 200 100 5 0 93% 98% PROGRESS IS SATISFACTORY DAVID TOCI RESIDENT ENGINEER