PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 12/22/20 EST. NO. 004 TIME 08:10 AM R.E. NAME: ALBERT LABRADOR 11-2N0714 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 004 0001 16,901.98 A.C. @ U.P.(+) 103120 N 0001 0 005 0001 134,605.68 E.W. @ U.P (+) 122020 N 0001 0 151,507.66 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 151,507.66 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 12/22/20 EST. NO. 004 TIME 08:10 AM R.E. NAME: ALBERT LABRADOR 11-2N0714 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- OVERBID ITEMS OVERBID ITEM NO. 022 -128,241.00 001 OVERBID ITEM NO. 022 -34,197.60 002 OVERBID ITEM NO. 022 -8,549.40 004 -8,549.40 -170,988.00 TOTAL DEDUCTIONS -8,549.40 -170,988.00 PROGRAM CAS145 PAGE 1 DATE 12/22/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2N0714 TIME 08:10 AM ESTIMATE NO. 004 BID OPENING 05/21/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/20 R.E. NAME: ALBERT LABRADOR DATE OF THIS ESTIMATE 12/22/20 LOCATION RERUN PROGRESS ESTIMATE 11-SD-15-R6.5/M10.9 ----------------------- VSS INTERNATIONAL, INC. IN SAN DIEGO COUNTY AT VARIOUS 3785 CHANNEL DRIVE; LOCATIONS. WEST SACRAMENTO CA 95691 FED. AID NO. ACNH-X073(138)E MICROSURFACING RAMPS AT VARIOUS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 6,064.8000 6,064.80 1.000 6,064 002 TIME-RELATED OVERHEAD (WDAY) WDAY 210.0000 23,100.00 9.000 1,890.00 97.000 20,370 003 CONSTRUCTION AREA SIGNS LS 81,425.0000 81,425.00 0.720 58,626 004 TRAFFIC CONTROL SYSTEM LS 734,597.5000 734,597.50 0.800 587,678 005 PORTABLE RADAR SPEED FEEDBACK SIGN LS 17,570.0000 17,570.00 0.410 7,203 SYSTEMS 006 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 2,677.5000 21,420.00 4.880 13,066 007 JOB SITE MANAGEMENT LS 150,000.0000 150,000.00 0.800 120,000 008 PREPARE WATER POLLUTION CONTROL PROGRAM LS 19,975.0000 19,975.00 0.750 14,981 009 MANAGE SOLID WASTE GENERATED HR 367.5000 32,340.00 46.000 16,905.00 74.000 27,195 BY THE PUBLIC 010 ASPHALTIC EMULSION (FOG SEAL COAT) TON 750.0000 6,000.00 3.230 2,422 011 MICRO-SURFACING TON 129.0300 799,986.00 2,386.020 307,868 012 REMOVE PAVEMENT MARKER EA 0.6300 4,662.00 868.000 546.84 2,876.000 1,811 013 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.0000 13,000.00 3,203.000 6,406.00 3,203.000 6,406 014 THERMOPLASTIC PAVEMENT MARKING SQFT 3.2000 40,000.00 15,035.000 48,112.00 15,035.000 48,112 (ENHANCED WET NIGHT VISIBILITY) 015 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.4700 8,507.00 2,639.000 1,240.33 2,639.000 1,240 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7) 016 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.4700 756.70 1,806.000 848.82 1,806.000 848 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 017 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.6900 122,820.00 49,555.000 34,192.95 49,555.000 34,192 (ENHANCED WET NIGHT VISIBILITY) 018 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.1300 58,421.00 4,435.000 5,011.55 4,435.000 5,011 (ENHANCED WET NIGHT VISIBILITY) 019 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 1.4700 18,375.00 3,830.000 5,630 020 CONTRAST STRIPE PAINT (1-COAT) LF 0.1500 5,940.00 17,303.000 2,595.45 17,303.000 2,595 021 REMOVE TRAFFIC STRIPE LF 0.1600 40,160.00 5,209.000 833.44 102,311.000 16,369 PROGRAM CAS145 PAGE 2 DATE 12/22/20 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2N0714 TIME 08:10 AM ESTIMATE NO. 004 BID OPENING 05/21/20 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/20 R.E. NAME: ALBERT LABRADOR DATE OF THIS ESTIMATE 12/22/20 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 118,582.38 1,287,694.45 ADJUSTMENT OF COMPENSATION 16,901.98 16,901.98 EXTRA WORK 134,605.68 134,605.68 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 270,090.04 1,439,202.11 022 MOBILIZATION LS 435,000.0000 435,000.00 0.050 21,750.00 1.000 435,000 ORIGINAL CONTRACT AMOUNT 2,640,120.00 TOTAL WORK COMPLETED 291,840.04 1,874,202.11 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS -8,549.40 -170,988.00 TOTAL 283,290.64 1,703,214.11 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 022 MOBILIZATION 264,012.00 435,000.00 170,988.00 DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/02/20 110 07/17/20 07/17/20 02/03/21 86 20 6 0 63% 74% PROGRESS IS SATISFACTORY ALBERT LABRADOR RESIDENT ENGINEER PROGRAM CAS145 DATE 12/22/20