PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/20/21 EST. NO. 002 TIME 03:45 PM R.E. NAME: HODZIC, SEID 11-2N0994 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/20/21 EST. NO. 002 TIME 03:45 PM R.E. NAME: HODZIC, SEID 11-2N0994 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/20/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2N0994 TIME 03:45 PM ESTIMATE NO. 002 BID OPENING 03/24/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/21 R.E. NAME: HODZIC, SEID DATE OF THIS ESTIMATE 08/20/21 LOCATION PROGRESS ESTIMATE 11-SD-8-R32.0/R44.0 ----------------- RV CONCRETE IN SAN DIEGO COUNTY NEAR ALPINE 605 E. COMMERCIAL ST. FROM 0.2 MILES EAST OF VIEJAS CREEK ANAHEIM CA 92801 BRIDGE TO 0.9 MILES WEST OF SUNRISE HIGHWAY OC. FED. AID NO. N O N E INDIVIDUAL SLAB REPLACEMENT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,275.0000 2,275.00 0.103 234.33 0.683 1,553 002 TIME-RELATED OVERHEAD (WDAY) WDAY 1,500.0000 90,000.00 6.000 9,000.00 41.000 61,500 003 CONSTRUCTION AREA SIGNS LS 9,875.0000 9,875.00 0.040 395.00 0.673 6,645 004 TRAFFIC CONTROL SYSTEM LS 173,000.0000 173,000.00 0.103 17,819.00 0.683 118,159 005 TEMPORARY TRAFFIC STRIPE (PAINT) LF 0.4000 2,688.00 -84.000 -33.60 456.000 182 006 PORTABLE RADAR SPEED FEEDBACK SIGN EA 90.0000 5,400.00 6.000 540.00 16.000 1,440 SYSTEM DAY 007 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 2,000.0000 8,000.00 4.000 8,000 008 JOB SITE MANAGEMENT LS 6,200.0000 6,200.00 0.103 638.60 0.683 4,234 009 PREPARE WATER POLLUTION CONTROL PROGRAM LS 875.0000 875.00 0.750 656 010 MANAGE SOLID WASTE GENERATED HR 200.0000 4,800.00 8.000 1,600 BY THE PUBLIC 011 ROADWAY EXCAVATION CY 91.0000 50,050.00 53.000 4,823.00 811.000 73,801 012 SHOULDER BACKING TON 75.0000 15,000.00 198.000 14,850.00 198.000 14,850 013 LEAN CONCRETE BASE RAPID SETTING CY 320.0000 176,000.00 53.000 16,960.00 811.000 259,520 014 BASE BOND BREAKER SQYD 3.5000 16,205.00 240.000 840.00 5,104.000 17,864 015 ASPHALTIC EMULSION (FOG SEAL COAT) TON 1,425.0000 5,700.00 2.420 3,448.50 2.420 3,448 016 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 128.0000 148,480.00 1,135.660 145,364.48 1,135.660 145,364 017 TACK COAT TON 700.0000 4,550.00 3.200 2,240.00 3.200 2,240 018 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 1.8000 26,640.00 15,018.000 27,032.40 15,018.000 27,032 019 DRILL AND BOND (DOWEL BAR) EA 19.5000 60,840.00 -120.000 -2,340.00 4,332.000 84,474 020 SPALL REPAIR (POLYESTER CONCRETE) SQYD 555.0000 127,650.00 0.500 277.50 44.600 24,753 021 INDIVIDUAL SLAB REPLACEMENT (RSC) CY 857.0000 891,280.00 1,086.000 930,702 022 REPLACE JOINT SEAL (SILICONE) LF 2.2000 415,800.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 08/20/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2N0994 TIME 03:45 PM ESTIMATE NO. 002 BID OPENING 03/24/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/21 R.E. NAME: HODZIC, SEID DATE OF THIS ESTIMATE 08/20/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 PAVEMENT MARKER EA 110.0000 1,100.00 0.000 0 (RETROREFLECTIVE-RECESSED) 024 METHYL METHACRYLATE PAVEMENT SQFT 27.5000 3,575.00 0.000 0 MARKINGS 025 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 5.0000 650.00 0.000 0 026 12" RUMBLE STRIP STA 65.0000 9,100.00 133.000 8,645.00 133.000 8,645 (ASPHALT CONCRETE PAVEMENT) 027 6" METHYL METHACRYLATE PAINT LF 5.5000 3,355.00 0.000 0 TRAFFIC STRIPE 028 6" METHYL METHACRYLATE PAINT LF 4.4000 26,928.00 0.000 0 TRAFFIC STRIPE (BROKEN 36-12) PROGRAM CAS145 PAGE 3 DATE 08/20/21 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2N0994 TIME 03:45 PM ESTIMATE NO. 002 BID OPENING 03/24/21 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/21 R.E. NAME: HODZIC, SEID DATE OF THIS ESTIMATE 08/20/21 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 250,734.21 1,796,666.34 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 250,734.21 1,796,666.34 029 MOBILIZATION LS 193,300.0000 193,300.00 1.000 193,300 ORIGINAL CONTRACT AMOUNT 2,479,316.00 TOTAL WORK COMPLETED 250,734.21 1,989,966.34 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 250,734.21 1,989,966.34 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/30/21 60 05/17/21 05/17/21 09/17/21 41 27 0 0 75% 68% PROGRESS IS SATISFACTORY *** SUSPENDED ON 07/29/21. HODZIC, SEID RESIDENT ENGINEER PROGRAM CAS145 DATE 08/20/21