PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 04/17/25 EST. NO. 008 TIME 05:26 PM R.E. NAME: ALEX BALCE 11-2N1694 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 04/17/25 EST. NO. 008 TIME 05:26 PM R.E. NAME: ALEX BALCE 11-2N1694 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- OVERBID ITEMS OVERBID ITEM NO. 055 -3,471.09 001 OVERBID ITEM NO. 055 -925.63 002 OVERBID ITEM NO. 055 -231.41 004 OVERBID ITEM NO. 055 4,628.13 008 4,628.13 0.00 TOTAL DEDUCTIONS 4,628.13 0.00 PROGRAM CAS145 PAGE 1 DATE 04/17/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2N1694 TIME 05:26 PM ESTIMATE NO. 008 BID OPENING 04/30/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/21/25 R.E. NAME: ALEX BALCE DATE OF THIS ESTIMATE 04/17/25 LOCATION PROGRESS ESTIMATE AFTER ACCEPTANCE 11-SD-78-3.3/72.9 ---------------------------------- J. FRANCIS COMPANY SAN DIEGO COUNTY AT VARIOUS LOCATIONS FROM 16197 KRAMERIA AVE. COLLEGE BOULEVARD UNDERCROSSING TO SAN RIVERSIDE CA 92504 FELIPE CREEK BRIDGE FED. AID NO. N O N E GRIND BRIDGE DECK, PLACE POLYESTER CONCRET ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,800.0000 2,800.00 1.000 2,800 002 TIME-RELATED OVERHEAD (WDAY) WDAY 985.0000 103,425.00 105.000 103,425 003 CONSTRUCTION AREA SIGNS LS 40,000.0000 40,000.00 1.000 40,000 004 TRAFFIC CONTROL SYSTEM LS 285,000.0000 285,000.00 1.000 285,000 005 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 800.0000 84,000.00 105.000 84,000 006 PORTABLE RADAR SPEED FEEDBACK SIGN DAY 100.0000 10,500.00 105.000 10,500 SYSTEM 007 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 3,000.0000 12,000.00 4.000 12,000 008 JOB SITE MANAGEMENT LS 12,000.0000 12,000.00 1.000 12,000 009 WATER POLLUTION CONTROL PROGRAM LS 4,500.0000 4,500.00 1.000 4,500 010 TEMPORARY CONCRETE WASHOUT LS 2,500.0000 2,500.00 1.000 2,500 011 ASBESTOS COMPLIANCE PLAN LS 3,000.0000 3,000.00 0.000 0 012 MANAGE SOLID WASTE GENERATED BY THE HR 200.0000 26,000.00 140.000 28,000 PUBLIC 013 ASBESTOS SURVEY AND SAMPLING LS 28,000.0000 28,000.00 1.000 28,000 014 HOT MIX ASPHALT (TYPE A) TON 1,900.0000 96,900.00 62.000 117,800 015 TACK COAT TON 3,000.0000 3,000.00 0.250 750 016 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 70.0000 36,540.00 612.660 42,886 017 GRIND EXISTING BRIDGE DECK SQYD 135.0000 22,005.00 163.000 22,005 018 STRUCTURAL CONCRETE, BRIDGE (RSC) CY 12,000.0000 27,600.00 2.660 31,920 (F) 019 CLEAN EXPANSION JOINT LF 40.0000 18,560.00 330.500 13,220 020 JOINT SEAL (MR 1") LF 50.0000 13,850.00 374.030 18,701 021 JOINT SEAL (MR 2") LF 200.0000 8,600.00 43.500 8,700 022 JOINT SEAL (TYPE AL) LF 65.0000 9,360.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 04/17/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2N1694 TIME 05:26 PM ESTIMATE NO. 008 BID OPENING 04/30/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/21/25 R.E. NAME: ALEX BALCE DATE OF THIS ESTIMATE 04/17/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 BAR REINFORCING STEEL (BRIDGE) LB 10.0000 3,840.00 384.000 3,840 (F) 024 PUBLIC SAFETY PLAN LS 15,000.0000 15,000.00 1.000 15,000 025 RAPID SETTING CONCRETE (PATCH) CF 100.0000 52,300.00 229.850 22,985 026 REPAIR SPALLED SURFACE AREA SQFT 700.0000 19,600.00 19.000 13,300 027 REMOVE ASPHALT CONCRETE SURFACING SQFT 7.0000 31,325.00 9,546.000 66,822 028 REMOVE UNSOUND CONCRETE CF 100.0000 52,300.00 210.020 21,002 029 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.3500 72,752.75 208,013.000 72,804 030 FURNISH POLYESTER CONCRETE OVERLAY CF 92.0000 196,604.00 2,332.800 214,617 031 PLACE POLYESTER CONCRETE OVERLAY SQFT 8.0000 175,720.00 22,113.000 176,904 (F) 032 TREAT BRIDGE DECK SQFT 0.5000 92,950.00 185,900.000 92,950 (F) 033 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 52.0000 108,160.00 2,185.200 113,630 034 BRIDGE REMOVAL (PORTION) LS 45,000.0000 45,000.00 1.000 45,000 035 PAINT BRIDGE IDENTIFICATION EA 500.0000 7,500.00 15.000 7,500 036 CONCRETE BARRIER DELINEATOR EA 400.0000 8,000.00 0.000 0 037 PAVEMENT MARKER (RETROREFLECTIVE) EA 25.0000 13,000.00 668.000 16,700 038 CONCRETE BARRIER MARKER EA 66.0000 8,580.00 130.000 8,580 039 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 500.0000 5,000.00 10.000 5,000 (0.063"-UNFRAMED) 040 ROADSIDE SIGN - ONE POST EA 5,000.0000 10,000.00 2.000 10,000 041 THERMOPLASTIC PAVEMENT MARKING (ENHANCED SQFT 6.0000 9,000.00 1,334.500 8,007 WET NIGHT VISIBILITY) 042 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN LF 2.5000 4,250.00 1,786.000 4,465 17-7) 043 6" THERMOPLASTIC TRAFFIC STRIPE LF 5.0000 8,000.00 2,808.000 14,040 (ENHANCED WET NIGHT VISIBILITY) 044 8" THERMOPLASTIC TRAFFIC STRIPE LF 7.0000 3,500.00 872.000 6,104 (ENHANCED WET NIGHT VISIBILITY) 045 8" THERMOPLASTIC TRAFFIC STRIPE LF 3.2000 992.00 305.000 976 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3) 046 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 3.0000 4,200.00 1,313.000 3,939 047 8" TRAFFIC STRIPE TAPE WITH CONTRAST LF 7.0000 1,750.00 245.000 1,715 (WARRANTY) (BROKEN 12-3) 048 CONTRAST STRIPE PAINT (2-COAT) LF 2.0000 10,200.00 3,927.000 7,854 PROGRAM CAS145 PAGE 3 DATE 04/17/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2N1694 TIME 05:26 PM ESTIMATE NO. 008 BID OPENING 04/30/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/21/25 R.E. NAME: ALEX BALCE DATE OF THIS ESTIMATE 04/17/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 049 REMOVE TRAFFIC STRIPE LF 2.7500 53,075.00 23,941.000 65,837 050 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 12.0000 141,600.00 12,092.000 145,104 (WARRANTY) 051 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 4.0000 13,600.00 3,184.000 12,736 (WARRANTY) (BROKEN 17-7) 052 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 4.0000 9,200.00 1,752.000 7,008 (WARRANTY) (BROKEN 36-12) 053 8" TRAFFIC STRIPE TAPE WITH CONTRAST LF 15.0000 40,500.00 2,326.000 34,890 (WARRANTY) 054 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 4.0000 1,080.00 257.000 1,028 (WARRANTY) (BROKEN 12-3) PROGRAM CAS145 PAGE 4 DATE 04/17/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 11-2N1694 TIME 05:26 PM ESTIMATE NO. 008 BID OPENING 04/30/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/21/25 R.E. NAME: ALEX BALCE DATE OF THIS ESTIMATE 04/17/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 0.00 2,089,047.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 9,027.87 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 0.00 2,098,074.87 055 MOBILIZATION LS 235,000.0000 235,000.00 1.000 235,000 ORIGINAL CONTRACT AMOUNT 2,303,718.75 TOTAL WORK COMPLETED 0.00 2,333,074.87 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 4,628.13 0.00 TOTAL 4,628.13 2,333,074.87 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 055 MOBILIZATION 230,371.87 235,000.00 4,628.13 DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/18/24 105 07/18/24 07/18/24 03/21/25 105 62 0 0 100% 100% ALEX BALCE RESIDENT ENGINEER